PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : MH-0149/2018
1. Location of the project/Scheme : Maharashtra
 (i) State / Union Territory : Maharashtra  (ii) District : Nashik  (iii) Forest Division : East Nashik(Nashik)  (iv) Area of forest land proposed for diversion (in ha.) : 28.6  (v)

Category of the Proposal: Irrigation
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1East Nashik(Nashik)28.6Forests Managed by State Government under Section
Total 28.6
Division 1. : East Nashik(Nashik)
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Nashik28.6
Total28.6
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
128.60.2Eco 3
Total. 28.6


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Acacia ArabicaBabhul100000
2Gliricidia MaculataGliricidea sepium010000
3Acacia leucophloeaHiwar010000
4Albezzia AmaraKansar18130000
5Azadirachta IndicaNeem120000
6Butea MonospermaPalas9337100
7Prosophis JulifloraProsophis320000
8Anona SquamosaSitaphal100000
Total 33 527 10 0
Sub Total (No of Trees.) 93

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Albezzia AmaraKansar360000
2Azadirachta IndicaNeem120000
3Butea MonospermaPalas363100
4Prosophis JulifloraProsopis200000
Total 9 143 10 0
Sub Total (No of Trees.) 27

5. Working plan prescription for the forest land proposed for diversion : "Conservation Reserve"
6. Brief note on vulnerability of the forest area to erosion : Forest area is not liable to erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Black buck and deer wildlife present in and around the forest land proposed for diversion.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1NashikVadali bk28.6Gut No. 63,64,65,66, 67
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Part II Mamdapur
2 Site Inspection Report Mamdapur

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Nashik1553000342526.894832.1121641330.88430/04/2019804.564467.767
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
East Nashik(Nashik)NashikDFOYesOne24/04/2019
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
East Nashik(Nashik)NashikDFO RecommendedThe storage tanks Mamdapur will Irrigate 116 Ha. of land of DPAP. area and will supply drinking water to nearby villages facing acute scarcity of water. The water stored in the reservoir will also be available for the drinking purpose for Wild Life and also increasing the food such as trees, grass etc. The proposal is recommended for approval.
NashikCF RecommendedRecommended for acceptanceYes
Nodal Officer RecommendedRecommendation
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
MaharashtraState SecretaryRecommended31/03/2021 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
NagpurRegional OfficeFC-II/MH-160/2021-NGP25/09/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/MH/IRRIG/37261/2018IRRIG37261201843850,412,190.0050,412,190.0018/01/2023851480Union Bank Of IndiaNEFT/RTGS (Challan)08/10/202211/10/2022
FP/MH/IRRIG/37261/2018IRRIG3726120186141,615,000.001,615,000.0015/07/2024SBIN424198072488Union Bank Of IndiaNEFT/RTGS (Challan)14/07/202415/07/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 28.6   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)28.6
  Status of CA Land so identified : Non Forest Area   Site Name : Vadali bk   Location Details : Gut No. 63,64,65,66,67   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
NashikEast Nashik(Nashik)YeolaCollector Office, Nashik No / RB/ Desk /3/ 6 /Kavi18 Aug 201828.6
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/MH/IRRIG/37261/201808 Mar 2023No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/MH/IRRIG/37261/201813 Aug 2024
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/MH/IRRIG/37261/201812 Mar 2024EDS: Query raised by this office letter Dated -01/04/202412 Apr 2024
FP/MH/IRRIG/37261/201819 Jul 2024EDS: For Physical copy submission12 Aug 2024
FP/MH/IRRIG/37261/201808 Mar 2023EDS: Query raised by this office letter Dated -11/09/202312 Sep 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/MH/IRRIG/37261/2018Recommended27 Apr 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/MH/IRRIG/37261/201820 Sep 2024APPROVED