PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
KL-08/2020
1.
Location of the project/Scheme :
Kerala
(i)
State / Union Territory :
Kerala
(ii)
District :
Ernakulam
(iii)
Forest Division :
Malayattoor,Nature Study Centre, Kalady
 (iv)
Area of forest land proposed for diversion (in ha.) :
1.56908
 (v)
Category of the Proposal:
Pipeline
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Nature Study Centre, Kalady
0.46956
Reserved Forest
2
Malayattoor
0.54208
Reserved Forest
Total
1.01164
Division 1. : Malayattoor
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Ernakulam
0.54208
Total
0.54208
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.54208
0
Eco 1
Total.
0.54208
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
NIL
6.
Brief note on vulnerability of the forest area to erosion :
The area proposed do not have any rare endanged speices of flora
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
1
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
elephant
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
NIL
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
NO Data
Additional information Details
S. No.
Documents
Remarks
NIL
Division 2. : Nature Study Centre, Kalady
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Ernakulam
0.46956
Total
0.46956
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.46956
50
Eco 1
Total.
0.46956
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
No data
6.
Brief note on vulnerability of the forest area to erosion :
The area proposed is on the side of forest road and there is no vulnerability of erosion.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Sambar deer, wild pig
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
NO Data
Additional information Details
S. No.
Documents
Remarks
NIL
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Ernakulam
306800
622.807
0.172
1
0
07/06/2021
0
0
2
Ernakulam
306800
66599.193
188.4757
19
0
01/01/2020
0
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Nature Study Centre, Kalady
Social Forestry Central Region, Ernakulam
DFO
Yes
One
07-12-2021
Social Forestry Central Region, Ernakulam
CF
Yes
One
14/12/2021
Malayattoor
Central circle, Thrissur
DFO
Yes
One
15/12/2021
Central circle, Thrissur
CF
Yes
One
31/12/2021
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Malayattoor
Central circle, Thrissur
DFO
Recommended
This water supply scheme is essential for the local people and the proposed diversion is under ground pipeline and in no way a threat to the forest and wild life
Nature Study Centre, Kalady
Social Forestry Central Region, Ernakulam
DFO
Recommended
The drinking water supply scheme is essential for the local people and the proposed diversion is underground pipeline and in no way a threat to the forest and wildlife. The project recommended.
Social Forestry Central Region, Ernakulam
CF
Recommended
The proposed drinking water supply project is essential for the local people and the proposed diverted forest area does not fall under protected area or ESZ. This project is carried out through underground pipeline and in no way a threat to the forest and wildlife. The diversion of forest land of 0.46956 hectare of Nature Study Centre, kalady Division for the KIIFB Augmentation of water supply scheme is recommended positively.
Yes
Central circle, Thrissur
CF
Recommended
The requirement of the proposed forest area is unavoidable and bare minimum for implementing the project. hence it is recommended.
Yes
Nodal Officer
Recommended
As per the inspection report the area of forest land required under Malayattoor Division is 0.54 ha and 0.46 ha in NSC Kalady. The total area recommended for diversion is 1 ha. The proposal is for drinking water supply to Malayattoor, Neleswaram and Ayyampuzha Panchyath and Augmentation of water supply scheme in Angamaly constituency.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Kerala
State Secretary
Recommended
08/07/2022
accorded sanction for 1 ha.
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Bangalore
State Government
C3/81/2022-FWLD
08/07/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/KL/Pipeline/41944/2019
PIPELINE419442019779
1,116,900.00
1,116,900.00
2022-07-30
681963
Union Bank Of India
NEFT/RTGS (Challan)
2022-07-25
2022-07-27
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/KL/Pipeline/41944/2019
IN-PRINCIPLE
No Data
Print
Checklist for State Nodal Officer
×