PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : KA-037/2019
1. Location of the project/Scheme : Karnataka
 (i) State / Union Territory : Karnataka  (ii) District : Shimoga  (iii) Forest Division : Sagar  (iv) Area of forest land proposed for diversion (in ha.) : 6.073276  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Sagar6.073276Reserved Forest
Total 6.073276
Division 1. : Sagar
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Shimoga6.073276
Total6.073276
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
16.0732760.25Eco 2
Total. 6.073276


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Acacia AriciloformisAcaciya2040000
2OthersAmate1500000
3Dalbergia LatifoliaBeete400000
4Aegle MarmelosBivapatre400000
5Delonix RegiaBuruga800000
6Adina cordifoliaYattega200000
7Semecarpus AnacardiumGeru4500000
8Albezzia AmaraHasirugonne500000
9Albezzia AmaraHasirugonne500000
10Pongamia PinnataHonge300000
11Pterocarpus MarsupiumHonne400000
12Terminalia PaniculataHunalu500000
13Xylia XylocarpaJamba1100000
14OthersKhare100000
15Terminalia TomentosaMatti44010002
16Eucalyptus SpsNilagiri500000
17Psidium GuajavaSeebe100000
18Othersseege200000
19Cassia SiameaSeeme tangadi900000
20Tectona GrandisTeak4010000
21Diasporus MelanoxylonTumari2700000
Total 224 60 00 2
Sub Total (No of Trees.) 232


5. Working plan prescription for the forest land proposed for diversion : No
6. Brief note on vulnerability of the forest area to erosion : The proposed land area is found to be less undulating, the soil type is of literate kind and average rainfall is 199.5mm, hence the soil erosion will be least in the area
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.100
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Porcupine,hare,fox,wild bore,deer,sambar,mutjac,peacock,Great hornbill, sand boa viper cobara
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 141.52
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1112.2Muttagi Minor ForestShiralkoppaG.4656-Ft.20-28-31,Dt: 28.09.1929    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Shimoga474060.17141860.58153.9881550.98814/02/202050.988135.5
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 ShimogaCFYesOne23/11/2019
SagarShimogaDFOYesOne03/11/2019
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
SagarShimogaDFO RecommendedThe proposed forest area for diversion 6.073276 Ha is a degraded area. It is not causing much damage to the adjoining forest area and here the soil type is lateritic. Here the type of vegetation found is scrub forest. The proposed transmission power line project is essential to the local villagers and hence it can be considered.
ShimogaCF RecommendedThe user agency is requesting for construction of the 110KV S/C line on DC towers from the existing 110/11KV Substation at Thogarshi to the proposed 110/11KV Sub station at Kuppagadde in Soraba taluk, Shivamogga district, the proposal has been recommended by Deputy Conservator of Forests and the same proposal can be considered and recommended.Yes
Nodal Officer Recommendedrecomended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
KarnatakaState SecretaryRecommended09/02/2021 Recommended the proposal. State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
BangaloreRegional OfficeF.No.KRC1287/2021-BAN02/06/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/KA/TRANS/38788/2019TRANS38788201913246,452,366.0046,452,366.002022-11-15779807Union Bank Of IndiaNEFT/RTGS (Challan)2022-08-082022-08-17
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 12.2   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)12.2
  Status of CA Land so identified : Forest Area   Site Name : Muttagi Minor Forest   Location Details : Sy No.70 of Thadasanalli Village, Udagani Hobli, Shikaripura Taluk, Shimoga District   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Muttagi Minor ForestOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/KA/TRANS/38788/201916 Aug 2024No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/KA/TRANS/38788/201916 Aug 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/KA/TRANS/38788/2019The compliance report is here by submitted to for furtjer necessarcy action02 Dec 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/KA/TRANS/38788/2019Approved In-PrincipleNo Data