PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : KA-047/2016
1. Location of the project/Scheme : Karnataka
 (i) State / Union Territory : Karnataka  (ii) District : Bangalore Rural  (iii) Forest Division : Bangalore Rural  (iv) Area of forest land proposed for diversion (in ha.) : 3.5062  (v)

Category of the Proposal: Railway
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Bangalore Rural3.5062Reserved Forest
Total 3.5062
Division 1. : Bangalore Rural
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bangalore Rural3.5062
Total3.5062
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.50620.3Eco 3
Total. 3.5062


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1EucalyptusNilgiri01074000
2Acacia CatechuKaggali0193000
3Tamarindus IndicaHunase000010
4Cassia SiameaSimetangadi0223000
5Acacia leucophloeaBilijali0116300
6Acacia AuriculiformisAcacia020000
7Albezzia AmaraChigare022000
8Dalbergia LatifoliaPacchare010000
9Diasporus MelanoxylonTupra010000
10Acacia NiloticaJali001010
11Azadirachta IndicaBevu065100
12Prosophis JulifloraBallarijali010000
13Holoptolia IntegrifoliaTapasi001000
14Zizyphus JujubaYalachi020000
15Ficus RacemosaAtti000001
Total 0 17425 42 1
Sub Total (No of Trees.) 206


5. Working plan prescription for the forest land proposed for diversion : Prescribed under Plantation Working Circle
6. Brief note on vulnerability of the forest area to erosion : The project site is comprised of undulating rocky terrain. Since the project involves cutting of earth in several places, construction of continuous retaining wall is prescribed.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Peafowl and hare
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1785000
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
117.00Gandragolipura Forest PlantationDoddaballapurNo.10407-FT-153-95 dt:29-05-1896/5    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Bangalore Rural22960020395.90588.28933.4131/10/20164.29695.81
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Bangalore RuralBangaloreDFOYesTwo17/10/2016,03/11/2016
 BangaloreCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Bangalore RuralBangaloreDFO RecommendedThe proposal for diversion is recommended for approval as the requirement is unavoidable, barest minimum and the project is also helpful for improving transportation and reduced travel time between Penukonda and Yelahanka.
quetiapin ritalin markenavntablet.site quetiapin wirkstoff
BangaloreCF RecommendedThe proposal is recommended for approval as the proposal is for doubling of the existing railway line only. The requirement of area is un-avoidable, barest minimum and the proposal helps in reducing the travel time between Penukonda and Yalahanka considerably. Yes
Nodal Officer RecommendedProposed of area is un-avoidable, barest minimum and the proposal helps in public to reducing the travel time between Penukonda and Yalahanka & the said project is established by Proposed of area is un-avoidable, barest minimum and the proposal helps in public to reducing the travel time between Penukonda and Yalahanka & the said project is established by Government of India entrepreneur i.e., South Western Railway.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
KarnatakaState SecretaryRecommended26/12/2016 Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
BangaloreRegional Office4-KRB 1103/ 2017-BAN01/02/2017
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/KA/RAIL/19574/2016RAIL1957420160913,979,882.003,979,882.0015/02/2017U000000176391954Corporation BankNEFT/RTGS (Challan)09/02/201709/02/2017
FP/KA/RAIL/19574/2016RAIL1957420160913,979,882.002,333,438.0017/01/2018U000000336043826Corporation BankNEFT/RTGS (Challan)NANA
FP/KA/RAIL/19574/2016RAIL195742016408420,000.00420,000.0019/03/2020SBIN220079649625Corporation BankNEFT/RTGS (Challan)06/03/202009/03/2020
FP/KA/RAIL/19574/2016RAIL195742016939883,400.00883,400.0010/08/2020SBIN320223967264Corporation BankNEFT/RTGS (Challan)29/07/202030/07/2020
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 7   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)7
  Status of CA Land so identified : Forest Area   Site Name : Sy.No.50 of Kuntanahalli Village, Gandaragolipura Forest Plantation, Doddaballapura Taluk, Bangalore Rural Division   Location Details : Sy.No.50 of Kuntanahalli Village, Gandaragolipura Forest Plantation, Doddaballapura Taluk, Bangalore Rural Division.   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Gandragolipura Forest PlantationOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/KA/RAIL/19574/201613 Mar 2017No DataDCF was identified the degraded forest land. The same is uploaded by UA
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/KA/RAIL/19574/201607 Jul 2022
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/KA/RAIL/19574/201607 Jul 2022EDS: Document not uploaded. hence, proposal is retuned07 Jul 2022
FP/KA/RAIL/19574/201601 Mar 2021EDS: EDS query raised by GOI it has already communicated with User Agency the same has been uploaded08 Oct 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/KA/RAIL/19574/2016compliance16 Apr 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/KA/RAIL/19574/201624 Feb 2023APPROVED