PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
KA-033/2018
1.
Location of the project/Scheme :
Karnataka
(i)
State / Union Territory :
Karnataka
(ii)
District :
Bellary
(iii)
Forest Division :
Bellary
 (iv)
Area of forest land proposed for diversion (in ha.) :
2.4313888
 (v)
Category of the Proposal:
Others
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Bellary
2.4313888
Section 4
Total
2.4313888
Division 1. : Bellary
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Bellary
2.4313888
Total
2.4313888
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
2.4313888
0.04
Eco 3
Total.
2.4313888
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Terminalia Chebula
Alale
3
0
0
0
0
0
2
Terminalia Tomentosa
Budre
24
1
0
0
0
0
3
Acacia leucophloea
Byla
3
0
0
0
0
0
4
Lagerstroemia Parviflora
chennangi
2
0
0
0
0
0
5
Boswellia Serrata
dhoopa
1
2
0
0
0
0
6
Ixora Parviflora
Gorachi
1
0
0
0
0
0
7
Grewia Tiliaefolia
jani
25
1
0
0
0
0
8
Cassia Fistula
kakke
12
0
0
0
0
0
9
Adina cordifolia
maddi
3
0
0
0
0
0
10
Bischofia Javanica
neeli
1
0
0
0
0
0
11
Phyllanthus Emblica
nelli
3
0
0
0
0
0
12
Tectona Grandis
8
0
0
0
0
0
0
13
Boswellia Serrata
thadike
5
0
0
0
0
0
14
Acacia Catechu
thered
21
3
0
0
0
0
15
Others
Others
611
24
7
0
0
0
Total
715
31
7
0
0
0
Sub Total (No of Trees.)
753
5.
Working plan prescription for the forest land proposed for diversion :
There is no Particular Prescription for This Proposed Area in Sanctioned Working Plan of this Division, However, Chapter 12 of the Working Plan Para 12.3(1) Of Page No. 169 area under Miming Leases and Also Surrounding Areas which are directly impacted by such mining activities
6.
Brief note on vulnerability of the forest area to erosion :
The soil erosion ay happen along the slope. Therefore, the user agency is required to take-necessary pricuation measures to aviod the soil erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.00
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Flora: Acacia catechu, Albizzia amara, Anogeissus latifolia, Cassia fistula, Carissa carandus and Dodonia viscose. Fauna: Hares, Peafowl, Sloth Bear, Wild boar Leopard, Grey partridge and Indian porcupine
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
Yes
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
(i).
Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no
District Name
Village
Area(in ha.)
khasra
KML file
Present Owner file
1
Vijayanagara
GUDEKOTE
2.4314
536
(ii).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iv).
Copy of CA scheme details:
(iv).
Copy of CA scheme details:
NA
Patch wise details for Degraded Area (To be earmarked by DFO)
Patch Wise Details
S.no
Division Name
Patch No.
Area(in ha.)
Name of PF/RF
Range
Village Name
Survey No.
Compartment No./any identification No.
KML file of patch
1
Bellary
1
2.4314
536
Kudligi
Gudekote
536
536
(i).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(ii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iii).
Copy of CA scheme details:
div>
(iv).
Total Financial Outlay for C.A:
729300
(v).
Whether the land identified by User Agency is suitable for CA and from managementpoint of view?:
Yes
(vi).
Copy of certificate regarding suitability of land identified for CA and from management point of view:
(vii).
Copy of detailed CA scheme including species to be planted,implementing agency,time schedule,cost structure etc.:
Additional information Details
S. No.
Documents
Remarks
1
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Bellary
842000
134953
6476.58
91
2342.49
31/03/2017
2337.70
2728.00
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Bellary
Bellary
DFO
Yes
One
02/09/2018
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Bellary
Bellary
DFO
Recommended
Recommended as per uploaded documents
Bellary
CF
Recommended
The proposal is recommended as per the provisions of the FC Act, 1980.
Yes
Nodal Officer
Recommended
Recommended for diversion of 2.4314 ha of forest land in Deogiri Swamimalai Forest Block, Sandur Taluk, Ballari District for establishing Downhill COnveyor System from Kammathuru Iron Ore Mine ML No. 2678 to PMBR siding in favour of M/s Sandur Manganese and Iron Ores Ltd Lakshmipur, Sanudru Taluk, Ballari District.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Karnataka
State Secretary
Recommended
19/02/2019
Forwarded to accord stage 1 approval.
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Bangalore
Head Office
8-17/1994-FC Vol.
15/10/2019
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/KA/Others/31165/2018
OTHERS311652018417
4,772,838.00
4,772,838.00
2019-12-17
UTIBR52019121700362405
Corporation Bank
NEFT/RTGS (Challan)
2019-12-14
2019-12-17
FP/KA/Others/31165/2018
OTHERS311652018417
4,772,838.00
1,052,796.00
2020-09-02
UTIBR52020090200355129
Corporation Bank
NEFT/RTGS (Challan)
NA
NA
FP/KA/Others/31165/2018
OTHERS311652018043
1,052,796.00
1,052,800.00
UTIBR52020090200355129
Corporation Bank
NEFT/RTGS (Challan)
2020-08-31
2020-09-01
FP/KA/Others/31165/2018
OTHERS311652018899
590,830.00
590,830.00
2022-09-17
722844
Union Bank Of India
NEFT/RTGS (Challan)
2022-09-12
2022-09-15
FP/KA/Others/31165/2018
OTHERS311652018946
4,633,589.00
4,633,590.00
2024-11-21
UTIBR62024112184787572
Union Bank Of India
NEFT/RTGS (Challan)
NA
NA
FP/KA/Others/31165/2018
OTHERS311652018534
1,034,780.00
1,034,780.00
2024-11-22
UTIBR72024112200427689
Union Bank Of India
NEFT/RTGS (Challan)
2024-11-22
2024-11-22
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
2.448
(iii). No. of Maintenance years:
8
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
2.448
Status of CA Land so identified :
Non Forest Area
Site Name :
GUDEKOTE VILLAGE SURVEY NO 536
Location Details :
GUDEKOTE VILLAGE SURVEY NO 536
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Bellary
Bellary
Kudligi
H28
05 Apr 2022
2.448
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/KA/Others/31165/2018
26 Aug 2024
No Data
verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/KA/Others/31165/2018
07 Dec 2024
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/KA/Others/31165/2018
Compliance Report To GoK
09 Dec 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/KA/Others/31165/2018
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×