PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : KA-053/2021
1. Location of the project/Scheme : Karnataka
 (i) State / Union Territory : Karnataka  (ii) District : Chitradurga  (iii) Forest Division : Chitradurga  (iv) Area of forest land proposed for diversion (in ha.) : 9.5474  (v)

Category of the Proposal: Mining
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Chitradurga9.547Reserved Forest
Total 9.547
Division 1. : Chitradurga
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Chitradurga9.547
Total9.547
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
19.5470.2Eco 3
Total. 9.547


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersByate1110000
2Albezzia LabbeckBage22121000
3Azadirachta IndicaBevu12135000
4Dalbergia LatifoliaBeete420000
5OthersSubabulla64285000
6SeemarubaSeemaruba030000
7OthersSaave5261451000
8Tectona GrandisTega70581000
9Cassia FistulaSokke650000
10OthersDindaga13271770000
11OthersNavaniga100000
12EucalyptusNeelagiri15521930000
13OthersPachhale67180000
14OthersMitali1230000
15OthersHippe15230000
16Thespesia PopuleneaBugari100000
17OthersBilavara200000
18BambooBidiru1145000
19Dalbergia LatifoliaBeete70196000
20OthersBikke1000000
21Greviia RobustaSilver841000
22Cassia SiameaSeematangadi65543000
23Santalum AlbumSriganda1840330000
24Anona SquamosaSeethapala1000000
25Gmelin ArboreaShivani12212000
26Diasporus MelanoxylonTuggali96781000
27OthersTarre151430000
28OthersChanniga134320000
29OthersTaredu300000
30OthersCharri610000
31OthersDadare1010000
32Rhus Spp.Murike211200
33OthersMatti51262000
34Madhuca indicaMavu14241000
35Artocarpus HeterophyllusHalasu300000
36OthersAsadu900000
37OthersApaga100000
38OthersAcacia21016136000
39OthersAsa100000
40OthersAsalu100000
41OthersAchara100000
42OthersApaga100000
43Diasporus MelanoxylonJagalaganti11410000
44OthersJaane1620000
45OthersJaali300000
46Othersingala310000
47OthersRate900000
48OthersRovade010000
49OthersYudaya264962000
50OthersUdedu010000
51OthersHalahippe600000
52Tamarindus IndicaHunase200000
53OthersHonne1161004000
54OthersHonge3770000
55OthersKabali280000
56Terminalia ArjunaKarimatti710000
57Hardwickia BinnataKamara100000
58Terminalia CatappaKadabadami199460000
59OthersKadachari4941000
60OthersKadanimbe510000
61Ixora ParvifloraGoravi53110000
62OthersGovi110000
63OthersGodasi2890000
64OthersGotage120000
65OthersGoddadamara710000
66Semecarpus AnacardiumGeeru630000
67Casurina EquisitifoliaTumare215350000
68Alberia Lebbac (Dirshanam)Baare100000
69OthersBhangi mara100000
70Phyllanthus EmblicaNeeli400000
71Prosophis JulifloraBeete2045000
72OthersAtti400000
73Others3000000
74Othersbayala1110000
Total 6190 1555113 20 0
Sub Total (No of Trees.) 7860


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : The area is adjacent to mining area, there is a possibility of the open dumps slide in to the forest.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 4
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Sloth bear, Leopard, Wild boar,porcupine, Peacock, reptiles, birds, Hare etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1ChamarajanagarMaddur9.547960, 961, 962, 963, 967, 968, 969, 970
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Chitradurga83880077397.071436.308409631/03/20221436.3081040.83
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
ChitradurgaBellaryDFOYesOne26/05/2022
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
ChitradurgaBellaryDFO RecommendedDiversion of 9.547 Ha in Hirekandavadi Sy No. 107 Extent 3.791 Ha, Thanigehalli Sy No. 35 Extent 4.642, B Durga Hobli, Holalkere Taluk and Dindadahalli Sy No. 18 Extent 1.114 Hireguntanuru Hobli, Chitradurga Taluk, Chitradurga District in Nirthadi Reserve Forest area. Proposal is for Construction of Conveyor Belt ML No.2677 to railway siding. Proposed area is the bare minimum and unavoidable. The Project Proposal for diversion of forest area may be considered.
BellaryCF RecommendedThe diversion of forest land to the tune of 9.547 ha. for construction of Conveyor belt from ML.No.2677 to their railway siding in respect of M/s Vedanta Limited, Chitradurga, may be considered as per the provisions of the Forest Conservation Act, 1980.Yes
Nodal Officer Recommendedrecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
KarnatakaState SecretaryRecommended03/02/2025Stage I ApprovalState Govt. OfficerNo Data