PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-095/2020
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Ganderbal  (iii) Forest Division : Sindh Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 0.1  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Sindh Forest Division0.1Reserved Forest
Total 0.1
Division 1. : Sindh Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Ganderbal0.1
Total0.1
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.10.3Eco 6
Total. 0.1


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : Comptt.49/Sindh falls under Protection Working Circle.
6. Brief note on vulnerability of the forest area to erosion : The area being moderately steep with no crop density on spot is susceptible to soil erosion. Being in Protection WC, it is being managed as per the prescriptions.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.02
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Himalayan Brown bear, Himalayan Black bear, Jackal, Wild Goat
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 2.40
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.2RFSindh46/Sindh    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Revised KML File and details of forest land involved including pipe line from source
2 DETAILS OF FOREST AREA PROPOSED FOR NON-FORESTRY USE
3 CALCULATION SHEET OF NET VALUE
4 Certificate for minimum use of forest land
5 LETTER OF ACCEPTENCE
6 Undertaking for payment of cost of Compensatory Afforestation
7 Land Suitability Certificate by the DFO
8 Check List of DFO
9 Check List of user Agency
10 Justification for locating the project in forest land
11 Undertaking for payment of Net Present Value of forest area
12 Site Inspection report WSS Rezan
13 Forest land involved with dimensions
14 Revised Joint Inspection Report WSS Rezan with full area details
15 Communication for recognition and vesting of FRA

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Ganderbal19790037901324.52738133609/10/202013360
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 Srinagar CircleCFNoNo Data
Sindh Forest DivisionSrinagar CircleDFOYesOne22/09/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Sindh Forest DivisionSrinagar CircleDFO RecommendedSince the area proposed for diversion is only 0.1 Hac, it may not have that much of an adverse impact on the local flora and fauna, as such the project is recommended for diversion, however the user agency may be asked to comply with the conditions mentioned in the recommendation file uploaded.
Srinagar CircleCF RecommendedThe proposed construction is essential to provide safe drinking water to the inhabitants of villages Rizwan and Kulan.Yes
Nodal Officer RecommendedTo provide drinking water facility.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended17/03/2021 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuState GovernmentFst/Land/Parivesh/21/202117/03/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/WATER/49613/2020WATER496132020339309,900.00309,900.00Union Bank Of IndiaUnion Bank Of India (Challan)11/03/202314/03/2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/WATER/49613/2020IN-PRINCIPLENo Data