PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-077/2021
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Ganderbal  (iii) Forest Division : Sindh Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 0.29  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Sindh Forest Division0.29Reserved Forest
Total 0.29
Division 1. : Sindh Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Ganderbal0.29
Total0.29
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.290.3Eco 6
Total. 0.29


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Abies Alba000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : The Compartment 34/Sindh falls under Reboisement Working Circle.
6. Brief note on vulnerability of the forest area to erosion : The area being moderately steep with low crop density is susceptible to soil erosion. Being in Reboisement WC, it is being managed as per the prescriptions.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.1
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Common Leopard, Himalayan Black Bear, Jackal, etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 4.08645
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.58RFSindh65(g)/Sindh    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Specific Recommendations of Sumbal Balla Surfraw
2 Certificate for minimum use of forest land
3 Muck Disposal Sumbal Surfraw
4 Approval of CA from the Competent Authority
5 Calculation Sheet of NPV
6 Undertaking for payment of CA
7 Communication to CF Srinagar for approval of CA for WSS Sumbal Balla Surfraw
8 Component wise calculation of area
9 Land Suitability Certificate
10 Details of forest area proposed for non-forestry use
11 Undertaking for payment of CA
12 Check List DFO
13 Joint Inspection Report
14 Specific recommendations of DCF for acceptance of proposal
15 Check List User Agency
16 Layout Plan for WSS Sumbal Balla Surfraw

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Ganderbal19790037901374.217440133611/03/202213360
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Sindh Forest DivisionSrinagar CircleDFOYesOne03/07/2021
 Srinagar CircleCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Sindh Forest DivisionSrinagar CircleDFO RecommendedThe proposal has been received from the Executive Engineer Jal Shakti PHE Department Ganderbal for diversion of 0.29 Ha of forest land for construction of Water Supply Scheme WSS Sumbal Balla Surfraw. The area falls in Compartment 34/Sindh of Forest Range Sindh Kangan and is part of Reboisement Working Circle. The area has relatively less dense vegetation with the optimum density is 30 40%. Since the area to be diverted is very less, it may not have that much of profound impact on the wildlife as well as the flora. As such the project is recommended for diversion subject to the conditions as envisaged in the Site Inspection Report as well as in Part II 8. v of the application.
Srinagar CircleCF RecommendedThe proposal involves diversion of forest land to the extent of 0.29 ha. The facility is urgently required by the User Agency for supplying drinking water to the villages of Sumbal Bala and Surfraw. The water source has to be tapped through forest for which use of forest land is indispensable.Yes
Nodal Officer RecommendedRECOMMENDED.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended24/11/2022Approved In PrincipleState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuState GovernmentFST-land0FC/79/2022-0222/11/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/WATER/126215/2021WATER1262152021276718,792.21512,000.0031/03/2023917004Union Bank Of IndiaNEFT/RTGS (Challan)17/02/202324/02/2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/WATER/126215/2021IN-PRINCIPLENo Data