PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-066/2022
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Udhampur  (iii) Forest Division : Ramnagar Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 2.2425  (v)

Category of the Proposal: School
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Ramnagar Forest Division2.2425State Land Gair Mumkin Jarh
Total 2.2425
Division 1. : Ramnagar Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Udhampur2.2425
Total2.2425
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.24250.1Eco 6
Total. 2.2425


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersDeodar0002420
Total 0 00 24 20
Sub Total (No of Trees.) 26


5. Working plan prescription for the forest land proposed for diversion : State Land Gair Mumkin Jarh
6. Brief note on vulnerability of the forest area to erosion : The site / area has been proposed for construction of new Govt. Degree College Dudu-Basantgarh and there is no vulnerability of Forest Land
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.1
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 6.83910
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
114.9335Reserved Forest (Kaithwa Forest)Basantgarh28/Bgh    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Undertaking NPV and CA
2 Calculation sheet of Extraction charges
3 EDS reply
4 Check List DFO
5 Detailed Project Report
6 Enumeration List
7 Georeference map
8 GPS Map
9 Justification letter
10 Land suitability Certificate
11 CA Plan
12 Check list UA along with Brief note
13 NPV Calculation Sheet
14 Project approval
15 Site inspection report of DFO
16 Joint inspection report
17 Toposheet UA
18 Toposheet
19 Undertaking for payment of additional NPV
20 Certificate for bare minimum use of Forest Land
21 Detail of Forest area
22 FRA Letter
23 Layout Plan
24 Recommendation of DFO
25 Georeferenced map showing proposed Degree College
26 Revenue papers regarding status of land
27 Part-II
28 Authority Letter

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Udhampur238000107079174.58858571316.31128/10/20221813.130
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Ramnagar Forest DivisionEast Circle JammuDFOYesOne20/09/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Ramnagar Forest DivisionEast Circle JammuDFO RecommendedThe proposal involves construction of New Govt. Degree College Dudu Basantgarh. The main objective of the proposal is to provide better and higher eduction to the people living in downtrodden areas. Hence, it is recommended that case may kindly be accepted under the ambit of Indian Forest Conservation Act, 1980
East Circle JammuCF RecommendedRecommended.Yes
Nodal Officer RecommendedRecommended.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended27/12/2022Recommended for grant of Stage I clearance.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuRegional Office9-JKB-001/2023-Jammu07/01/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/SCH/154248/2022SCH15424820224993,082,196.003,082,200.0020/06/2024RBI1732434470015Union Bank Of IndiaNEFT/RTGS (Challan)NANA
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 4.9335   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)4.9335
  Status of CA Land so identified : Forest Area   Site Name : Raichak   Location Details : Raichak   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
RaichakRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/SCH/154248/202222 Jul 2024No Dataverfiied
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/SCH/154248/202223 Jul 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/JK/SCH/154248/2022Recommended for grant of Stage-II approval23 May 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/SCH/154248/202209 Jun 2025APPROVED