PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-027/2021
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Kulgam  (iii) Forest Division : Kulgam Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 0.56  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Kulgam Forest Division0.56Reserved Forest
Total 0.56
Division 1. : Kulgam Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kulgam0.56
Total0.56
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.560Eco 6
Total. 0.56


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : The Forest land proposed for diversion is a degraded area and comes under Reboisement Working Circle
6. Brief note on vulnerability of the forest area to erosion : The Area is Prone to Erosion due to Land slide
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Occasional appearance of Black bear, Leopard.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): Excavation and cutting of forest land
   (b) Period of Work done(year) : 8
   (c) Area of forest land involved in violation (in ha.) : 0.31
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1Executive Engineer R and B Division KulgamExecutive Engineer R and B Division KulgamNil
12. Whether work in violation is still in progres(Yes/No) : No
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 3.56
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111.12Banimullah BeatKulgamN-27b    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Undertaking for payment of Penalty Amount
2 Model Compensatory Afforestation Plan
3 Layout Road
4 Calculation of Forest Area Involved
5 Calculation Sheet of NPV
6 Tree enumeration list
7 Joint Inspection Report
8 Site Inspection Report By DFO
9 Undertaking for Payment of NPV
10 Checklist of documents
11 Land Suitability Certificate
12 Undertaking for payment of CA
13 minimum use of forest land
14 Recommendation Letter
15 Muck Disposal Certificate
16 Project Approval
17 Specific recommendation by DFO
18 Calculation Sheet of CA
19 CA Approval
20 GPS Map, Toposheet of CA Site and Toposheet of Forest Land Diverted

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Kulgam106700440782.4653025/02/202100
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Kulgam Forest DivisionSouth Circle BijbeheraDFOYesOne12/02/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Kulgam Forest DivisionSouth Circle BijbeheraDFO RecommendedThe area proposed for diversion is 0.56 Ha. The road connects villages viz., Pahloo, Chaterpora, Gasrina, Chambgund, Arigatnoo, Pranhal, Gudder, Laisoo, etc and will uplift the habituation of the area.
South Circle BijbeheraCF RecommendedSir, the diversion of forest land to the tune of 0.56 Ha for the in question proposal is essentially required for better road connectivity to the area so as to enhance the living conditions and to provide them with other social services.Yes
Nodal Officer RecommendedTo provide road connectivity
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended16/07/2021 In Principle accorded by State Government.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuState GovernmentFST/Land/0FC/52/2021-0216/07/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/ROAD/74294/2020ROAD742942020145990,749.48990,749.0022/12/2021RBI0042237556038Union Bank Of IndiaNEFT/RTGS (Challan)10/11/202115/12/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 1.12   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1.12
  Status of CA Land so identified : Forest Area   Site Name : CA SITE N-27B   Location Details : BANIMULLA   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
CHANDERGEE MALWANRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/ROAD/74294/202021 Apr 2025No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/ROAD/74294/202006 May 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/ROAD/74294/2020IN-PRINCIPLENo Data