PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
JK-010/2021
1.
Location of the project/Scheme :
Jammu and Kashmir
(i)
State / Union Territory :
Jammu and Kashmir
(ii)
District :
Kishtwar
(iii)
Forest Division :
Marwah Forest Division
 (iv)
Area of forest land proposed for diversion (in ha.) :
5.9312
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Marwah Forest Division
5.9312
Reserved Forest
Total
5.9312
Division 1. : Marwah Forest Division
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Kishtwar
5.9312
Total
5.9312
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
5.9312
0.5
Eco 6
Total.
5.9312
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Pine
Deodar (Cedrus deodara)
68
76
97
73
85
372
2
Pine
Kail (Pinus wallichiana)
48
57
41
11
14
68
3
Pine
Fir/Spruce (Abies pindrow)
0
0
0
0
1
0
4
Pine
Chilgoza (Pinus gerardiana)
0
0
0
1
10
16
5
Poplus
Poplar (Poplus spp)
0
0
0
0
0
5
6
Juglan Regia
Walnut
0
0
0
0
0
3
7
Others
HC Nut (Aesculus indica)
35
65
45
38
28
63
8
Others
Brari (Ulmus wallichiana)
1
0
0
1
4
14
9
Others
Ash (Fraxinus excelsior)
0
0
2
19
11
72
10
Others
Urni (Corylus avellana)
0
1
3
6
4
0
11
Others
Trikana ( Acer spp)
40
35
31
10
9
1
12
Others
Kharak (Celtis australis)
3
2
1
4
4
2
13
Rhus Spp.
Arkhad (Rhus succedania)
30
29
24
5
7
3
14
Others
Gir (Corylus jacquemontii)
0
0
1
0
0
0
15
Others
Bran (Ulmus wallichiana)
0
0
0
0
0
2
16
Others
Kellar (Parrotia jacquemontiana)
110
56
41
2
0
0
17
Others
Champ (Almus nitida)
60
38
32
0
1
3
Total
395
359
318
170
178
624
Sub Total (No of Trees.)
2044
5.
Working plan prescription for the forest land proposed for diversion :
Co 15/D, 13/D, 10/D, 9/D , 8b/D & 8c/D are assigned to the Mixed Conifer Selection working circle. This working Circle includes all commercial forests of Deo and Kail with varying proportions of Fir and Spruce spp. Co. 16b/D and 8a/D are assigned to the Conservation working circle having significant quantum of exploitable growing stock in patches and preserves the pristine ecosystem of the area. Co. 14/D, 12/D & 11/D are assigned to the Fir Selection working circle. These forests consists of mixture of Fir with sprinkling of Spruce Deodar and Kail
6.
Brief note on vulnerability of the forest area to erosion :
During the Rock cutting some forest erosion is likely to occur as such the User agency has assured to construct the retaining walls
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.01
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Leopard, Musk Deer, Monkeys, Jackals etc.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
Yes
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
22.75548
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
12
Patimhalla Forest
Dachhan
38bD
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Layout plan of construction of Road from Ikhala Block Boundary to Lopara
2
Topo sheet of Construction of Road from Ikhala Block Boundary to Lopara
3
CA plan 38bD
4
SOI Map 38bD
5
Final Notification of Eco Sensitive Zone of KHANP issued under S.O No. 4262 (E) Dt. 13.10.2021 by MoEF & CC
6
Reply of information as asked by Nodal Officer FCA vide his No. PCCF/FCA/3218/1209-10 Dt.26.05.2022
7
Point Wise Information as desired by MoEF & CC
8
Area Statement
9
Enumeration List of Ikhala Block Boundary to Lopara
10
Checklist 16 SIR
11
Checklist 20 Land Suitability
12
Recommendations by DCF
13
Site Specific interventions cum Revised Cost benefit analysis
14
Reply of EDS as sort by IRO Jammu
15
CA approval 38bD
16
Geo Ref Map 38bD
17
EDS in continuation to this office No. 1329 Dt. 23.06.2022
18
Reply of EDS by User Agency
19
Required Information
20
technical feasibility report
21
Animal Passage plan of Ekhala Block boundary
22
Final notification of Eco-sensitive zone of KHANP
23
Joint inspection report
24
Time period
25
NOC of Chief Wildlife Warden in proposal No FP/JK/ROADS /51198/2020
26
Cost of Damage Statement
27
Biological measures
28
Checklist 07
29
Degraded forest
30
Specific recommendation
31
Statement NPV
32
Undertaking CA
33
Undertaking Cost of Damage
34
Undertaking Minimum use
35
Abstract of trees
36
General checklist
37
Undertaking NPV
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Kishtwar
773700
334006.91
529.1406
39
1926
14/09/2022
1926
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Marwah Forest Division
Chenab Circle Doda
DFO
Yes
One
12/12/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Marwah Forest Division
Chenab Circle Doda
DFO
Recommended
The said Road alignment is only possible alignment to connect the 40,000 population of Marwah & Warwan valley to District H.Q Kishtwar. Because in winter season Margan Top remains covered with Heavy snow. Moreover due to construction of this route, migration of local people from Marwah & Warwan Valley should be in favour of upliftment of this remote area. Moreover due to construction of this road accessibility in far flung Kishtwar High altitude would be possible
Chenab Circle Doda
CF
Recommended
Forest land diversion for construction of road from ikhalla block boundary kishtwar to lopara in marwah division is hereby recommended for approval under FCA. Total of 5.9312 hac of forest land in marwah forest division is recommended
Yes
Nodal Officer
Recommended
To provide road connectivity.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Jammu and Kashmir
State Secretary
Recommended
04/04/2022
Recommended for grant of Stage I clearance
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Jammu
Regional Office
9-JKC-019/2022-Jammu
21/10/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/JK/ROAD/51130/2020
ROAD511302020585
10,571,728.20
10,571,729.00
09/03/2023
896112
Union Bank Of India
NEFT/RTGS (Challan)
NA
NA
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
12
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
12
Status of CA Land so identified :
Forest Area
Site Name :
38b/D Patimhalla Forest
Location Details :
Patimhalla
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Patimhalla Forest
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/JK/ROAD/51130/2020
15 Mar 2023
No Data
verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/JK/ROAD/51130/2020
15 Mar 2023
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/JK/ROAD/51130/2020
Recommended for stage-II approval
17 Feb 2025
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/JK/ROAD/51130/2020
Approved In-Principle
No Data
Print