PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-054/2020
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Doda  (iii) Forest Division : Doda Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 3.13  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Doda Forest Division3.13Reserved Forest
Total 3.13
Division 1. : Doda Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Doda3.13
Total3.13
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.130.5Eco 5
Total. 3.13


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1PineChir (Pinus roxburghii)0020323457
2OthersKau (Olea Cuspidata)00038195
3Dalburgia SisooShesham ( DalburgiaSisoo)000001
Total 0 020 7053 63
Sub Total (No of Trees.) 206


5. Working plan prescription for the forest land proposed for diversion : Sowing and planting (Regeneration) constitute a pivotal role of practices degraded forest area should be taken on priority base to restock them by regress then artificial regeneration . Choice of species should be given by different locality factors. Apart from deodar , wallnut, Accers, Prunus padus, Fraxinus should be planted up. All shown or planted up areas shell have to be fenced by a country fencing or barbed wire wire fencing which ever is cheaper and more effective. Showing may be done in two or three alternative ways namely, dibbling, patch sowing or broadcast sowing after racking the soil to some extent. The former is the best method.
6. Brief note on vulnerability of the forest area to erosion : The area is less vulnerable to erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Macaque, Fox
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 10.98
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
116.26RFKuntwara38/K    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Enumeration list of trees
2 Site inspection report
3 Joint inspection report
4 Certificate for degraded forest area
5 Certificate regarding compensatory afforestation
6 Toposheet
7 Minimum demand of forest land certificate
8 Certificate of Specific recommendation of DFO
9 Geo-reference
10 Compensatory afforestation and Maintenance sheet
11 Justification letter by User Agency
12 Land Suitability certificate
13 Detailed estimate of NPV, Extraction of trees, CA Plan and Biological Measures of muck dumping sites
14 CA Plan Approval/Sanction
15 CA Plan proposal
16 Biological measure of muck dumping sites

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Doda262500146469.72408.73101331801/04/202033180
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Doda Forest DivisionChenab Circle DodaDFOYesOne20/09/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Doda Forest DivisionChenab Circle DodaDFO RecommendedThe purposed road provide road connectivity to habitations of Balwana, Gujjar Basti, Sisool with population more than 5000 people which have remained most backward, neglected and deprived of basic amenities.
Chenab Circle DodaCF RecommendedForest land divertion under PWD department R&B spl. Sub Division Doda for construction of barshalla to bhalwana road via sisool is here by recommended for approval under FCA. Total of 3.13 hac of forest area near bhalwana kuntwara range of Doda forest Division is recommended. Yes
Nodal Officer RecommendedTo provide road connectivity.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended26/02/2021 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuRegional Office9-JKB008/2021-JAMMU01/06/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/ROAD/46055/2020ROAD4605520207693,927,197.003,927,197.0005/04/2022JAKA409400085768Union Bank Of IndiaNEFT/RTGS (Challan)31/03/202231/03/2022
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 6.26   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)6.26
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
NA
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/ROAD/46055/202011 Apr 2026No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/ROAD/46055/202011 Apr 2026
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/ROAD/46055/2020Approved In-PrincipleNo Data