PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
JK-049/2020
1.
Location of the project/Scheme :
Jammu and Kashmir
(i)
State / Union Territory :
Jammu and Kashmir
(ii)
District :
Reasi
(iii)
Forest Division :
Mahore Forest Division
 (iv)
Area of forest land proposed for diversion (in ha.) :
3.22
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Mahore Forest Division
3.22
Reserved Forest
Total
3.22
Division 1. : Mahore Forest Division
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Reasi
3.22
Total
3.22
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
3.22
0.5
Eco 5
Total.
3.22
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Pine
Chir
4
3
2
2
1
9
Total
4
3
2
2
1
9
Sub Total (No of Trees.)
21
5.
Working plan prescription for the forest land proposed for diversion :
the area comes under Chir conversion working circle
6.
Brief note on vulnerability of the forest area to erosion :
the area is vulnerable to erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
monkey, mongoose, porcupine etc
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
5.421
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
3.22
Karud Shajroo Forest
Gulabgarh
01/GG
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Land suitability certificate
2
3
4
Checklist
5
Approval of the project
6
7
8
Muck disposal Plan with engineering and Biological measures
9
Joint inspection report
10
Previous FST of GREF
11
Toposheet CA site
12
Undertaking CA
13
Approved CA Plan
14
NPV CALCULATION SHEET
15
undertaking additional npv
16
Enumeration list of trees
17
Georeference map of the CA site
18
layout plan
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Reasi
171900
118803
434.7387
77
0
09/10/2020
0
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
West Circle Rajouri
CF
No
No Data
Mahore Forest Division
West Circle Rajouri
DFO
Yes
One
23/08/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Mahore Forest Division
West Circle Rajouri
DFO
Recommended
area proposed for diversion is 3.22 hectare as it is a small area so not much concern for the environment also
West Circle Rajouri
CF
Recommended
Proposed road is necessary for connectivity and forest area diverted is 3.22 ha only, for which compensatory afforestation has been proposed by DFO Mahore.
Yes
Nodal Officer
Recommended
To improve the existing road connectivity.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Jammu and Kashmir
State Secretary
Recommended
21/12/2021
Recommended for grant of Stage I clearance.
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Jammu
Regional Office
9-JKB-095/2021-Jammu
24/01/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/JK/ROAD/43956/2020
ROAD439562020720
6,134,277.00
6,134,280.00
04/03/2022
SBINR52022030470406058
Union Bank Of India
NEFT/RTGS (Challan)
NA
NA
FP/JK/ROAD/43956/2020
ROAD439562020177
6,134,277.00
6,134,280.00
26/12/2024
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
3.22
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
3.22
Status of CA Land so identified :
Forest Area
Site Name :
Karud Shajroo Forest Gulabgarh Range
Location Details :
Karud Shajroo Forest
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Karud Shajroo Forest
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/JK/ROAD/43956/2020
26 Dec 2024
No Data
approved
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/JK/ROAD/43956/2020
27 Dec 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/JK/ROAD/43956/2020
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×