PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-093/2022
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Doda  (iii) Forest Division : Bhaderwah Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 0.165  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Bhaderwah Forest Division0.165Reserved Forest
Total 0.165
Division 1. : Bhaderwah Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Doda0.165
Total0.165
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.1650.5Eco 6
Total. 0.165


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersDeodar000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : Protection Working Circle
6. Brief note on vulnerability of the forest area to erosion : Possibility of erosion during and after construction of proposed road.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Leopard,Monkey, Jackal, Fox
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 132998
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.50Sukhtni Ghor BanNeeru21/N    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Reply of EDS of Para No. 03
2 Joint Inspection
3 STATEMENT SHOWING DETAILS OF FOREST AREA PROPOSED FOR DIVERSION
4 Specific Recommendation
5 Minimum Use of Land
6 Undertaking of CA
7 Undertaking of NPV
8 Approval of CA
9 No Violation
10 Photo of CA Location
11 CALCULATION SHEET OF NET PRESENT VALUE
12 Location Map

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Doda2625 146469.72 408.73 1013318 24/11/20222200
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Bhaderwah Forest DivisionChenab Circle DodaDFOYesOne16/09/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Bhaderwah Forest DivisionChenab Circle DodaDFO Recommendedthe purpose of road is to connect one rural area to another rural area
Chenab Circle DodaCF RecommendedForest land diversion under J&k FCA Act, 1980 for construction of phase 2nd of ongoing road from katyara to kansar via hadal from house of Sh Rattan Lal village haddal to village bharai via village upper haddal is hereby recommended for approval under FCA. Total of 0.165 hac of forest land in bhaderwah forest division is recommended. Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended20/03/2023Approved In Principle by the Government of Jammu KashmirState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuState GovernmentFST-land0FC/2/2023-0220/03/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/ROAD/157238/2022ROAD1572382022926359,446.00359,446.0031/03/2023917086Union Bank Of IndiaNEFT/RTGS (Challan)25/03/202328/03/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.5   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.5
  Status of CA Land so identified : Forest Area   Site Name : Lower Haddal   Location Details : Longitude 75°45’32.942”E - 75°45’33.719”E Latitude 32°56’51.853”N - 32°56’51.622”N   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Sukhtni Ghor BanRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/ROAD/157238/202221 Aug 2023No Dataapproved
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/ROAD/157238/2022IN-PRINCIPLENo Data