PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-079/2021
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Udhampur  (iii) Forest Division : Ramnagar Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 1.982  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Ramnagar Forest Division1.982Reserved Forest
Total 1.982
Division 1. : Ramnagar Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Udhampur1.982
Total1.982
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.9820.3Eco 5
Total. 1.982


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Alnus NepalensisChamp000001
2OthersAllen000101
3OthersBanj381227372031
4PineChir11701010620
5RhododendronChew001320
Total 498 238 5128 53
Sub Total (No of Trees.) 670


5. Working plan prescription for the forest land proposed for diversion : Chir selection & Broadleaved working circle
6. Brief note on vulnerability of the forest area to erosion : The proposed construction work is upgradation of existing road and there is least vulnerability of forest area to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.01
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : None Noticed
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 7.47597
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
113.9640Reserved ForestBasantgarh72a/Bgh    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Certificate for minimum use of forest land
2 Check List User Agency
3 Engineering and Biological measures
4 Enumeration list
5 Justification letter
6 NPV Calculation sheet
7 Toposheet map of User Agency
8 Undertaking NPV
9 Layout Plan
10 Check List DFO
11 Site inspection report
12 Specific recommendation of DFO
13 Detail of Forest Area
14 Approval of project
15 FRA Letter
16 Joint Inspection Report
17 Land suitability certificate
18 Technical Report
19 Undertaking additional NPV
20 Undertaking Cost of CA
21 KML of road
22 Toposheet map
23 CA Plan
24 Geo reference map
25 Authority letter
26 Certificate regarding const. of road prior to 1980

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Udhampur238000107079172.33318567311.806202/09/20211294.350
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Ramnagar Forest DivisionEast Circle JammuDFOYesOne16/06/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Ramnagar Forest DivisionEast Circle JammuDFO RecommendedThe work involves widening of existing road. The main objective of the proposal to provide better road connectivity which is a key component of rural development by promoting access to economic and social services. Hence, it is recommended that the case may kindly be considered.
East Circle JammuCF RecommendedThe proposal is recommended.Yes
Nodal Officer RecommendedTo improve the existing road.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended21/12/2021Recommended for grant of Stage I clearance.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuRegional Office9-JKB-094/2021-Jammu24/01/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/ROAD/143554/2021ROAD14355420217563,827,686.003,827,686.0012/04/2022JAKA410100076720Union Bank Of IndiaNEFT/RTGS (Challan)06/04/202208/04/2022
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 3.964   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)3.964
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
NA
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/ROAD/143554/202122 Jul 2024No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/ROAD/143554/202122 Nov 2024
FP/JK/ROAD/143554/202122 Nov 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/ROAD/143554/2021Approved In-PrincipleNo Data