PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JK-052/2021
1. Location of the project/Scheme : Jammu and Kashmir
 (i) State / Union Territory : Jammu and Kashmir  (ii) District : Kishtwar  (iii) Forest Division : Kishtwar Forest Division  (iv) Area of forest land proposed for diversion (in ha.) : 2.4  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Kishtwar Forest Division2.4Reserved Forest
Total 2.4
Division 1. : Kishtwar Forest Division
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kishtwar2.4
Total2.4
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.40.5Eco 6
Total. 2.4


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersHeru Green (Quercus ilex)308914012710
2OthersChamp Green (Alnus nitida)42326566192516
3OthersKahu Green (Olia cuspidata)1044310
4OthersAnar Green (Punica granatum)0245000
5OthersHatab Green (Parotia jacqmentiana)16261000
Total 4288 208216 3433 26
Sub Total (No of Trees.) 4805


5. Working plan prescription for the forest land proposed for diversion : The compartment number 16/N proposed for diversion of 2.4 Ha. Forest land for construction of road upto TRT outlet, KWAR HEPP Kishtwar is assignment to Mixed Coniferous Selection Working Circle and the compartment falls under ANR (Aided Natural Regeneration) and required for special treatment for reclamation.
6. Brief note on vulnerability of the forest area to erosion : The area is sloppy form moderate to precipitous as such during rock cutting and earth cutting some forest erosion is likely to their.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.03
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Leopard, Jackals, Monkeys, Langor, Black Bear, Jungle fowls
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 9.10958
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
115RashgwariNagseni16/N    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Check list 17
2 General Check List KWAR HEPP
3 Joint Inspection
4 Minimum use of FL
5 Land requirement
6 Photograph of CA Site (1)
7 Proposed area proposed
8 Approval of Project
9 Undertaking for NPV
10 Calculation Sheet
11 Check list 7
12 FRA
13 Georeference Map
14 Biological Measures
15 Degraded F Land
16 Land suitability certificate
17 Cost of enumeration
18 KMZ print
19 Enhanced TOPOSHEET
20 Georefrence Map Points converted
21 SOI Map
22 Road plan
23 Undertaking for CO CA
24 EMP report Kwar HEP
25 Enumeration lists

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Kishtwar773700334006.91466.6065248155929/04/202115590
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Kishtwar Forest DivisionChenab Circle DodaDFOYesOne26/04/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Kishtwar Forest DivisionChenab Circle DodaDFO RecommendedThe road project is impartment and only feasible alignment for approaching TRT outlet of Kwar HEPP. The project hold its importance in the present day scenario keeping in view the day to day need electricity and this project will boost the economic doncition of the District by providing employment to the local youths.
Chenab Circle DodaCF RecommendedForest land divertion under Kwar hepp Cvpppl for construction of road up to trt Kwar hep kishtwar is hereby recommended for approval under FCA. Total of 2.4 hac of forest area is recommended. Yes
Nodal Officer Recommendedto facilitate construction of Kwar HEP
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Jammu and KashmirState SecretaryRecommended20/05/2021 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
JammuRegional Office9-JKB-052/2021-JAMMU15/07/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JK/ROAD/141548/2021ROAD14154820212403,797,733.003,797,733.0028/07/2021SBIN421209226799Union Bank Of IndiaNEFT/RTGS (Challan)26/07/202126/07/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 5   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)5
  Status of CA Land so identified : Forest Area   Site Name : Rash Gwari 16/Nagseni   Location Details : Seuna 16/Nagseni   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Rash GwariRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JK/ROAD/141548/202112 Aug 2021No Datayes
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JK/ROAD/141548/202112 Aug 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/JK/ROAD/141548/2021Compliance report for accord of Stage-II approval.18 Sep 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JK/ROAD/141548/202127 Jan 2022APPROVED