PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : JH-037/2019
1. Location of the project/Scheme : Jharkhand
 (i) State / Union Territory : Jharkhand  (ii) District : Deoghar  (iii) Forest Division : Deoghar  (iv) Area of forest land proposed for diversion (in ha.) : 4.3565  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Deoghar4.3565jungle-jhari land
Total 4.3565
Division 1. : Deoghar
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Deoghar4.3565
Total4.3565
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
14.35650.5Eco 4
Total. 4.3565


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Butea MonospermaPlash1116813250100
2Terminalia ArjunaArjun020000
3BambooBamboo020000
4BabulBabool020000
5Ficus benghalensisBanyan000110
6Annona ReticulataCustard apple110000
7Acacia ArabicaDate Palm03244340
8Azadirachta IndicaNeem1710010
9Mangifera IndicaMango040110
10Artocarpus HeterophyllusJack fruit003000
11Misc. Speciesjungli1148623190
Total 24 237231 12626 0
Sub Total (No of Trees.) 644


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Slighty Prone to Erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : 1. Macaca fascicularis 2. Eretizon dorsaum 3. Sus scrofa 4 Naja naja 5. Python molurus 6. Felis chaus 7. Lepus areticus 8. Fanambulus palmarum 9. Acridotheres tristis 10. Corcuta crocuta
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : Yes
 (i). Details and comments on the impact of Project on such sites/establishments : DRDO establishement is located at a distance of 500 to 600 meters approx from the proposed transmission line.
 (ii). Copy of NOC from Competent Authority :
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 4718328.00
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
118.7130PFDeoghar Territorial7, 511, 717    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2
3
4
5
6
7
8

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Deoghar28285923906874.27003131305.39215/06/2019978.32307.728
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DeogharDeogharDFOYesOne14/06/2019
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DeogharDeogharDFO Recommended Jharkhand is having acute shortage of electricity production. Hence this proposal may be accepted.
DeogharCF RecommendedRecommendation Attached.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
JharkhandState SecretaryRecommended05/08/2019 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
RanchiState Governmentvanbhumi-35/201902/08/2019
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/JH/TRANS/38851/2019TRANS38851201972313,164,405.0013,164,405.0020/09/2019SBINR52019092000076236Corporation BankNEFT/RTGS (Challan)03/09/201904/09/2019
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 8.713   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)8.713
  Status of CA Land so identified : Forest Area   Site Name : Bhogtadih Mojha, Thana-Deoghar, Plot No-7,717,511   Location Details : Deoghar Forest Division   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
NA
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/JH/TRANS/38851/201931 Oct 2019No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/JH/TRANS/38851/201906 Nov 2019
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/JH/TRANS/38851/2019Stage - I compliance22 Nov 2019
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/JH/TRANS/38851/201917 Dec 2019APPROVED