PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
JH-037/2015
1.
Location of the project/Scheme :
Jharkhand
(i)
State / Union Territory :
Jharkhand
(ii)
District :
Deoghar
(iii)
Forest Division :
Deoghar
 (iv)
Area of forest land proposed for diversion (in ha.) :
291.17
 (v)
Category of the Proposal:
Irrigation
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Deoghar
254.68
Protected Forest
2
Deoghar
36.49
jungle-jhari land
Total
291.17
Division 1. : Deoghar
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Deoghar
291.17
Total
291.17
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
291.17
0.2
Eco 6
Total.
291.17
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Butea Monosperma
palash
0
131
70
15
3
0
2
Acacia Catechu
khair
0
117
6
0
0
0
3
Others
0
99
33
11
18
0
Total
0
347
109
26
21
0
Sub Total (No of Trees.)
503
(iii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
(iv)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
NA
6.
Brief note on vulnerability of the forest area to erosion :
Prone to Erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Macaca fascicularis Erethizon dorsaum Sus scrofa Naja naja Python molurus Felis chaus Lepus areticus Funambulus palmarum Acridotheres tristis Crocuta crocuta
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
Yes
(a)Details of violation(s):
Earth work in construction of spillway and canal h
(b) Period of Work done(year) :
25
(c) Area of forest land involved in violation (in ha.) :
30.25
S. No.
Name of person responsible for violation
Designation & Address of person responsible for violation
Action taken against the person responsible for violation
1
Sonu Jha Narendra Kumar Ram Prawesh Sharma Ram Singh Surendra Phatak Mithelish Singh Rajdev Poddar Sunil Kumar Mishra Arun Kumar Thakur Hardev singh Sacchidanand Prabhakar sunil kumar kisko
Contractor Asst Engineer Junior Engineer Executive Engineer Irrigation Department Deoghar
Total seven no of Forest cases have been initiated and three FIR lodged against the offenders
12.
Whether work in violation is still in progres(Yes/No) :
No
13.
Details of compensatory afforestation scheme
(i).
Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no
District Name
Village
Area(in ha.)
khasra
KML file
Present Owner file
1
Deoghar
Achato, Poraiya, Tarabad, Khamarbad, Parsiya, Aashanbani, Dhanhet, Basbutia, Parshodih, Depahadi, Pa
291.46
443, 2, 214, 71, 75, 1392, 743, 183, 269, 459, 18, 2, 281, 1, 967, 2, 368, 404, 81, 275, 321, 323, 553, 130, 425, 445, 64, 108, 584, 35, 7, 601, 280, 472, 32, 249, 249, 44, 570, 550, 539, 181, 1220
(ii).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iv).
Copy of CA scheme details:
(iv).
Copy of CA scheme details:
NA
Additional information Details
S. No.
Documents
Remarks
1
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Deoghar
2428.59
239.06
538.357
7
1069.71
20/11/2015
662.89
2.428
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Deoghar
Deoghar
DFO
Yes
One
30/11/2015
Deoghar
CF
Yes
One
10/12/2015
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Deoghar
Deoghar
DFO
Recommended
Deoghar
CF
Recommended
Moreover this proposal is good for facilitating water for irrigation facilities to the rural as well as suburb masses in general which will pave the ways of agrarian development in future in these areas. As our national dream of galloping economy especially the GDP hinges on more food production and more irrigated areas, this project will act as vehicle of development of Deoghar Distt. In particular and Santhal Pargana in general. Therefore this project is strongly recommended for GOI consents.
Yes
Nodal Officer
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Jharkhand
State Secretary
Recommended
03/03/2016
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Ranchi
Head Office
8-06/2016-FC
22/12/2016
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/JH/IRRIG/15962/2015
IRRIG159622015588
61,000,000.00
25886
Corporation Bank
Corporation Bank (Challan)
2017-01-03
2017-01-06
FP/JH/IRRIG/15962/2015
IRRIG159622015597
228,302,532.00
300771502
Corporation Bank
Corporation Bank (Challan)
2017-02-08
2017-02-08
FP/JH/IRRIG/15962/2015
IRRIG159622015624
8,000,000.00
37090
Corporation Bank
Corporation Bank (Challan)
2017-03-22
2017-03-24
FP/JH/IRRIG/15962/2015
IRRIG159622015828
7,773,344.00
39680
Corporation Bank
Corporation Bank (Challan)
2017-03-29
2017-03-29
FP/JH/IRRIG/15962/2015
IRRIG159622015251
8,000,000.00
3234
Corporation Bank
Corporation Bank (Challan)
2017-04-10
2017-04-10
FP/JH/IRRIG/15962/2015
IRRIG159622015425
43,716,130.00
4214
Corporation Bank
Corporation Bank (Challan)
2017-04-20
2017-04-21
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
291.46
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
26
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
34.92
Status of CA Land so identified :
Non Forest Area
Site Name :
Badiya
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
515/2016-17
21 Mar 2017
34.92
No. of patches :
2
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
2
Block(Polygon)
2.02
Status of CA Land so identified :
Non Forest Area
Site Name :
Tilaiya
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
512/2016-17
08 Mar 2017
2.02
No. of patches :
3
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
3
Block(Polygon)
4.05
Status of CA Land so identified :
Non Forest Area
Site Name :
Joramo
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
514/2016-17
21 Mar 2017
4.05
No. of patches :
4
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
4
Block(Polygon)
5.26
Status of CA Land so identified :
Non Forest Area
Site Name :
Fatehpur
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
513/2016-17
21 Mar 2017
5.26
No. of patches :
5
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
5
Block(Polygon)
4.86
Status of CA Land so identified :
Non Forest Area
Site Name :
Bangaura
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
18 Mar 2017
4.86
No. of patches :
6
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
6
Block(Polygon)
7.69
Status of CA Land so identified :
Non Forest Area
Site Name :
Saerjangal
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
02/2016-17
18 Mar 2017
7.69
No. of patches :
7
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
7
Block(Polygon)
10.12
Status of CA Land so identified :
Non Forest Area
Site Name :
Ambatanr
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
02 Mar 2017
10.12
No. of patches :
8
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
8
Block(Polygon)
10.52
Status of CA Land so identified :
Non Forest Area
Site Name :
Nakti
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
02 Mar 2017
10.52
No. of patches :
9
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
9
Block(Polygon)
10
Status of CA Land so identified :
Non Forest Area
Site Name :
Moranga
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
02 Mar 2017
10
No. of patches :
10
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
10
Block(Polygon)
24.99
Status of CA Land so identified :
Non Forest Area
Site Name :
Ghormara
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
02 Mar 2017
24.99
No. of patches :
11
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
11
Block(Polygon)
16.26
Status of CA Land so identified :
Non Forest Area
Site Name :
Sirsiya
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
02 Mar 2017
16.26
No. of patches :
12
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
12
Block(Polygon)
16.59
Status of CA Land so identified :
Non Forest Area
Site Name :
Kurua
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
02 Mar 2017
16.59
No. of patches :
13
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
13
Block(Polygon)
4.45
Status of CA Land so identified :
Non Forest Area
Site Name :
Tengdhoya
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
02 Mar 2017
4.45
No. of patches :
14
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
14
Block(Polygon)
7.28
Status of CA Land so identified :
Non Forest Area
Site Name :
Asanbani
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2017-18
18 May 2017
7.28
No. of patches :
15
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
15
Block(Polygon)
3.71
Status of CA Land so identified :
Non Forest Area
Site Name :
Tilauna
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
02/2010-11
16 May 2017
3.71
No. of patches :
16
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
16
Block(Polygon)
4.21
Status of CA Land so identified :
Non Forest Area
Site Name :
Parasbani
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
03/2010-11
16 May 2017
4.21
No. of patches :
17
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
17
Block(Polygon)
2.83
Status of CA Land so identified :
Non Forest Area
Site Name :
Pathri
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
04/2010-11
16 May 2017
2.83
No. of patches :
18
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
18
Block(Polygon)
11.53
Status of CA Land so identified :
Non Forest Area
Site Name :
Devpahari
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
05/2010-11
16 May 2017
11.53
No. of patches :
19
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
19
Block(Polygon)
2.43
Status of CA Land so identified :
Non Forest Area
Site Name :
Parsodih
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
07/2010-11
16 May 2017
2.43
No. of patches :
20
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
20
Block(Polygon)
20.12
Status of CA Land so identified :
Non Forest Area
Site Name :
Basbutia
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
08/2010-11
16 May 2017
20.12
No. of patches :
21
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
21
Block(Polygon)
10
Status of CA Land so identified :
Non Forest Area
Site Name :
Dhanhet
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2017-18
17 May 2017
10
No. of patches :
22
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
22
Block(Polygon)
27.52
Status of CA Land so identified :
Non Forest Area
Site Name :
Parsiya
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
27 Mar 2017
27.52
No. of patches :
23
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
23
Block(Polygon)
10.12
Status of CA Land so identified :
Non Forest Area
Site Name :
Khamarbad
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
01/2016-17
27 Mar 2017
10.12
No. of patches :
24
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
24
Block(Polygon)
9.87
Status of CA Land so identified :
Non Forest Area
Site Name :
Tarabad
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
25/2017-18
05 Apr 2017
9.87
No. of patches :
25
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
25
Block(Polygon)
10.12
Status of CA Land so identified :
Non Forest Area
Site Name :
Poraiya
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
25/2017-18
05 Apr 2017
10.12
No. of patches :
26
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
26
Block(Polygon)
19.989
Status of CA Land so identified :
Non Forest Area
Site Name :
Achato
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Deoghar
Deoghar
Deoghar Territorial
26/2017-18
05 Apr 2017
19.989
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/JH/IRRIG/15962/2015
08 Jun 2017
No Data
Verified for further processing.
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/JH/IRRIG/15962/2015
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×