PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
HP-026/2020
1.
Location of the project/Scheme :
Himachal Pradesh
(i)
State / Union Territory :
Himachal Pradesh
(ii)
District :
Mandi
(iii)
Forest Division :
Suket
 (iv)
Area of forest land proposed for diversion (in ha.) :
1.8272
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Suket
1.8272
CVD & OTHER
Total
1.8272
Division 1. : Suket
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Mandi
1.8272
Total
1.8272
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
1.8272
0.02
Eco 5
Total.
1.8272
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Syzigium Cumini
Jamun
0
1
0
0
0
0
2
Others
Chil (Pinus roxoburghii)
0
15
11
1
1
0
3
Others
Ban (Quercus lecotrechophora)
0
4
0
0
0
0
4
Others
Kainth (Pyrus pashia)
0
1
0
0
0
0
Total
0
21
11
1
1
0
Sub Total (No of Trees.)
34
5.
Working plan prescription for the forest land proposed for diversion :
Neither prescribed nor suggested.
6.
Brief note on vulnerability of the forest area to erosion :
As per site requirement the R/wall B/wall shall be constructed on upper and lower side of the road.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Monkey, wild boar, ape, etc.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
No
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
768192
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
3.6544
PF
Jhungi
OD210
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Revised NPV as per MoEF order dated 06.01.2022
2
Part II documents
3
Site inspection report.
4
No plantation certificate
5
Check list-14
6
Arial distance certificate
7
Joint Inspection report
8
Soil Moisture & Conservation Plan
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Mandi
86940
27598.40
552.0114
59
1221.566
23/11/2020
1122.404
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Suket
Mandi
DFO
Yes
One
28/10/2020
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Suket
Mandi
DFO
Recommended
The construction of this road will be benefited five and shall increase the economy of the area with the sufficient cheap and quick transportation of possible agriculture produce easy and extended marketing facilities more over availability of emergency medical help.
Mandi
CF
Recommended
EDS has been attended
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Himachal Pradesh
State Secretary
Recommended
31/08/2021
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Shimla
Regional Office
FC/HPB/06/22/2021
24/06/2024
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/HP/ROAD/40734/2019
ROAD407342019222
3,270,332.00
3,270,330.00
2024-11-19
RBI3252440594363
Union Bank Of India
NEFT/RTGS (Challan)
2024-10-28
2024-11-13
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
3.6544
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
3.6544
Status of CA Land so identified :
Forest Area
Site Name :
Ghadahach OD 210
Location Details :
53E03
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Ghadahach
Other Forest Land
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/HP/ROAD/40734/2019
18 Dec 2024
No Data
CA has been proposed over degraded Forest land, hence mutation is not required.
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/HP/ROAD/40734/2019
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×