PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : HP-0165/2017
1. Location of the project/Scheme : Himachal Pradesh
 (i) State / Union Territory : Himachal Pradesh  (ii) District : Kullu  (iii) Forest Division : GHNP  (iv) Area of forest land proposed for diversion (in ha.) : 5.18  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1GHNP5.18Protected Forest
Total 5.18
Division 1. : GHNP
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kullu5.18
Total5.18
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
15.180.1Eco 6
Total. 5.18


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersDeodar005048
2OthersKail003042
3RhododendronBrass002000
4OthersKainth001000
5OthersKhirik001000
6OthersRobenia001210
7Alnus NepalensisKosh000003
8OthersBan Oak032521613
Total 0 338 2315 26
Sub Total (No of Trees.) 105


5. Working plan prescription for the forest land proposed for diversion : No working plan prescription for IIIrd class UPF
6. Brief note on vulnerability of the forest area to erosion : the area is covered with vegetation and no serious soil erosion was noted. Retaining walls proposed whereever required.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 2.5
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Sporadic sighting of Ghoral and pheasants noticed.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : proposed land is the part of ESZ of Great Himalayan National park and no adverse impact can be directly linked with this project.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1831000
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1110.36OthersWL TrithanNuhanda UPF    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2
3 Report

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Kullu55030027017827102.0606/12/2019102.060
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
GHNPGHNPDFOYesOne11/04/2018
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
GHNPGHNPDFO RecommendedIn Kullu district, land other than forest land is not available for C/o roads. the alignment which has least no. trees was selected.
GHNPCF RecommendedAs recommended by DFO.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Himachal PradeshState SecretaryRecommended25/07/2019 Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShimlaRegional Office8B/HP/06/106/2019/FC09/03/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/HP/ROAD/28594/2017ROAD2859420179076,428,552.006,428,552.0023/03/2020PUNBH20085098494Corporation BankNEFT/RTGS (Challan)21/03/202023/03/2020
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details) : No
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/HP/ROAD/28594/201721 May 2020No DataCA has been proposed over degraded Forest land, hence mutation is snot required.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/HP/ROAD/28594/201711 Oct 2023
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/HP/ROAD/28594/201726 May 2020EDS: EDS31 May 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/HP/ROAD/28594/2017Complete Compliance23 Apr 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/HP/ROAD/28594/201728 Dec 2023APPROVED