PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
HP-034/2016
1.
Location of the project/Scheme :
Himachal Pradesh
(i)
State / Union Territory :
Himachal Pradesh
(ii)
District :
Sirmaur
(iii)
Forest Division :
Rajgarh
 (iv)
Area of forest land proposed for diversion (in ha.) :
1.625
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Rajgarh
1.625
U.F.
Total
1.625
Division 1. : Rajgarh
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Sirmaur
1.625
Total
1.625
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
1.625
0.0769231
Eco 5
Total.
1.625
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Brownea Grandiceps
0
0
0
0
0
0
2
P. Cerasoides D.Don
0
0
0
0
0
0
3
Others
B.L. Species
0
25
0
0
0
0
4
Zizyphus Jujuba
Ber
0
1
0
0
0
0
5
Melotus Philippensis
Kammal
0
24
0
0
0
0
Total
0
50
0
0
0
0
Sub Total (No of Trees.)
50
5.
Working plan prescription for the forest land proposed for diversion :
As per revised working plan Rajgarh Forest Division written by Sh. Rajesh Shukla for the period 2013-14 to 2027-28 , no prescription has been mentioned for the forest land proposed to be diverted.
6.
Brief note on vulnerability of the forest area to erosion :
As per field reporting the area is not vulnerable to erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.2382
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
N.A.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
Yes
(a)Details of violation(s):
NIL
(b) Period of Work done(year) :
2007
(c) Area of forest land involved in violation (in ha.) :
0.1818
S. No.
Name of person responsible for violation
Designation & Address of person responsible for violation
Action taken against the person responsible for violation
1
HPPWD
XEN HPPWD Rajgarh
A committee consisting CFNahan SE HPPWD Nahan SDM Rajgarh DFO Rajgarh and Executive Engineer Rajgarh was constituted to inspect the work for construction of road Prem Nagar Chandog the committee has suggested some parameters to regularized the above said road The detailed report has been attached in proposal folder page number fifty nine and sixty
2
3
12.
Whether work in violation is still in progres(Yes/No) :
No
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
520900
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
4.5
UF Killa Kalanch
Sarahan
C1
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
The reply of point No. 11 (i) (a) has been given in additional information. Moreover the violators are admitting the violation and are ready to pay penal compensatory afforestation under the provision of FCA, 1980. The penal CA has accordingly been proposed. It is pertinent to add here that violators have admitted that due to non awareness / identification of status of land the FCA 1980 violated.
2
The detail of violation and the name of the person/ officials at the time of violation is attached in additional information as PDF file.
3
4
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Sirmaur
82002.00
25986.72
77.887
14
355.454
01/06/2016
155.00
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Nahan
CF
Yes
One
02/05/2016
Rajgarh
Nahan
DFO
Yes
One
26/04/2016
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Rajgarh
Nahan
DFO
Recommended
Diversion of 1.625 ha. forest land for construction of road Prem Nagar to Chandog Via. Bara Chakli.
quetiapin ritalin
quetiapin mod angst
quetiapin wirkstoff
Nahan
CF
Recommended
Diversion of 1.625 ha. forest land for construction of road Prem Nagar to Chandog Via. Bara Chakli is justified in the interest of local people as there is no other alternative for construction of road.
quetiapin ritalin
markenavntablet.site
quetiapin wirkstoff
Yes
Nodal Officer
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Himachal Pradesh
State Secretary
Recommended
17/08/2016
recommmended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Shimla
Regional Office
8B/HPB/06/53/2016
08/12/2016
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/HP/ROAD/18346/2016
ROAD183462016574
2,498,416.00
2,498,420.00
UCBA709000092627
Union Bank of India
NEFT/RTGS (Challan)
2019-07-20
2019-07-24
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
4.5
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
4.5
Status of CA Land so identified :
Forest Area
Site Name :
Killa Kalanch
Location Details :
UF
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
UF Killa Kalanch C1
Others
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/HP/ROAD/18346/2016
04 Oct 2023
No Data
CA has been proposed over degraded Forest land, hence mutation is not required.
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/HP/ROAD/18346/2016
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×