PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : HP-061/2022
1. Location of the project/Scheme : Himachal Pradesh
 (i) State / Union Territory : Himachal Pradesh  (ii) District : Kullu  (iii) Forest Division : Ani at Luhri  (iv) Area of forest land proposed for diversion (in ha.) : 1.668  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Ani at Luhri1.668Un-Demarcated Protected Forest
Total 1.668
Division 1. : Ani at Luhri
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kullu1.668
Total1.668
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.6680.07Eco 6
Total. 1.668


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersChil ( Pinus roxburgaii)39351000
Total 39 351 00 0
Sub Total (No of Trees.) 75


5. Working plan prescription for the forest land proposed for diversion : As per working the area falls under Improvement working Circle.
6. Brief note on vulnerability of the forest area to erosion : Not vulnerable
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.1
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Leopard, Black Bear, fox, Jungle fowl, Jungle crow, Monkey
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1264533
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
113.336UPF KutwaChowaiC-176    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Abstract of trees coming in the atlernative-2
2 Abstract of trees coming in the atlernative-1
3 Bill of NPV
4 Location map of CA site
5 List of trees of Proposed road alginment
6 Soil Moisture and Conservatiion Plan
7 Revenue paper of CA land

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Kullu550300197629462.4141103792.041830/11/2021698.7440
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Ani at LuhriRampurDFOYesOne29/04/2022
 RampurCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Ani at LuhriRampurDFO RecommendedLand proposed for C/o road from Shamshar to Chaloun is unavoidable and barest minimum. Hence, This proposed is recommended for construction.
RampurCF RecommendedJustification as per the check list No.10 is placed in the proposal folders Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Himachal PradeshState SecretaryRecommended26/08/2022RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShimlaRegional OfficeFC/HPB/06/124/202231/10/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/HP/ROAD/151416/2022ROAD15141620224922,817,263.002,817,260.002024-03-28SBINR5202403281221330Union Bank Of IndiaNEFT/RTGS (Challan)2024-03-262024-03-27
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 3.336   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)3.336
  Status of CA Land so identified : Forest Area   Site Name : UPF Kutwa C-176 (Nagnidhar)   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
NA
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/HP/ROAD/151416/202212 Jul 2024No DataCA has been proposed over degraded Forest land, hence mutation is not required.
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/HP/ROAD/151416/202204 Feb 2025EDS: No reply has been submitted instead of this copy of tatima has been uploaded please go through the contents of observation of GoI and submit the reply accordingly.05 Feb 2025
FP/HP/ROAD/151416/202206 Aug 2024EDS: eds21 Oct 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/HP/ROAD/151416/2022The compliance report as furnished by UA is found complete in all respect. 13 Aug 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/HP/ROAD/151416/2022Approved In-PrincipleNo Data