PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
HP-047/2021
1.
Location of the project/Scheme :
Himachal Pradesh
(i)
State / Union Territory :
Himachal Pradesh
(ii)
District :
Kangra
(iii)
Forest Division :
D/sala
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.3
 (v)
Category of the Proposal:
Others
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
D/sala
0.3
Protected Forest
Total
0.3
Division 1. : D/sala
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Kangra
0.3
Total
0.3
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.3
0.1
Eco 5
Total.
0.3
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
No Felling
0
0
0
0
0
0
Total
0
0
0
0
0
0
Sub Total (No of Trees.)
0
5.
Working plan prescription for the forest land proposed for diversion :
As per the working plan, area falls under Plantation Working Circle (PWC) and silviculture system prescribed is modified clear felling system with artificial regeneration as mentioned para 16.1.5 chapter XVI.
6.
Brief note on vulnerability of the forest area to erosion :
The area in question is not vulnerable to land slides.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.250
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
No such specific wildlife is found in the proposed area.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
2.08104
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
NO Data
(ii).
Copy of CA scheme details:
NA
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority:
Additional information Details
S. No.
Documents
Remarks
1
Revised CA Scheme
2
Geo Map CA
3
Topo Map CA
4
Land Suitability Certificate
5
Complete Scan Part II
6
Check List 2 Part II
7
Revised NPV Bill
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Kangra
573900
61061.58
204.0269
102
401.1854
31/03/2021
383.0814
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
D/sala
D/Sala
DFO
Yes
One
02/03/2021
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
D/sala
D/Sala
DFO
Recommended
The area proposed for diversion is barren land and involves no felling of trees. Being a tourist attraction the Sewerage Treatment Plant is necessarily required in the area. It will provide long term benefits to the society. There is no Non Forest Land available in the area so the Sewerage Treatment Plant has been proposed in forest land. The forest land 0.3 ha is recommended for approval as it is the barest minimum land required for the Project.
D/Sala
CF
Recommended
The proposal is recommended for approval.
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Himachal Pradesh
State Secretary
Recommended
17/11/2021
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Shimla
Regional Office
FC/HPB/06/42/2021
06/07/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/HP/Others/51314/2020
OTHERS513142020411
478,673.00
478,673.00
2022-08-03
684379
Union Bank Of India
NEFT/RTGS (Challan)
2022-07-27
2022-07-29
FP/HP/Others/51314/2020
OTHERS513142020411
478,673.00
606,669.00
2022-11-01
760416
Union Bank Of India
NEFT/RTGS (Challan)
NA
NA
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details) :
No
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/HP/Others/51314/2020
10 Apr 2023
No Data
CA has been proposed over degraded Forest land, hence mutation is not required.
Compliance Details Submitted by User Agency(old)
Proposal No.
Compliance Details submitted on(Date)
Reject Remarks
Reject Date
Uploaded Letter
FP/HP/Others/51314/2020
17 Jun 2024
EDS: EDS
21 Aug 2024
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/HP/Others/51314/2020
Compliance reported to GoI
08 Jul 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/HP/Others/51314/2020
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×