PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
HP-084/2018
1.
Location of the project/Scheme :
Himachal Pradesh
(i)
State / Union Territory :
Himachal Pradesh
(ii)
District :
Shimla
(iii)
Forest Division :
Rampur
 (iv)
Area of forest land proposed for diversion (in ha.) :
1.4194
 (v)
Category of the Proposal:
Others
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Rampur
1.4194
Unclassed Forests
Total
1.4194
Division 1. : Rampur
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Shimla
1.4194
Total
1.4194
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
1.4194
0.04
Eco 5
Total.
1.4194
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
Chil (pinus roxburghii)
6
6
0
0
0
0
2
Others
Fedu
3
0
0
0
0
0
3
Others
Robinia( Roninia (pseudacasia)
2
0
0
0
0
0
Total
11
6
0
0
0
0
Sub Total (No of Trees.)
17
5.
Working plan prescription for the forest land proposed for diversion :
As per approved working plan of this Division the area falls under PB-III of Chil Working Circle
6.
Brief note on vulnerability of the forest area to erosion :
The proposed area is not seriously eroded or is not much vulnerable to erosion.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
2.00
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Monkey, Jackel, Leopard, jungle fowl, crow, sparrow, Snake and Rock lizard etc.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
647248
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
2.8388
UF
Rampur
UF-Shingla
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Revised Part-II
2
Addl. NPV undertaking
3
Certificate for minimum use of forest land
4
Land suitability certifcate by DFO concerned
5
Cost of trees
6
Muck dumping profermas
7
DGPS map of proposed site
8
Non availability of non forest land certificate
9
CA certificate
10
CA map on toposheet
11
Statement showing details of Govt/forest land area proposed for diversion
12
Location map
13
Justification
14
NPV undertaking
15
Scheme for compensatory afforestation scheme
16
Proposed site on toposheet
17
CA undertaking
18
Revised bill of NPV
19
Undertaking
20
Revised site inspection report
21
Distance from Wild Life Sanctuary Area away from proposed project Certificate
22
Revised Layout Plan
23
EDS reply of User Agency
24
Certificate for non availability of administrative buildings as well as buildings on lease
25
Non availability of non forest land certificate for muck disposal
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Shimla
129848
40372.76
1464.7126
92
1464.7126
30/06/2018
1660.41
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Rampur
CF
No
No Data
Rampur
Rampur
DFO
Yes
One
25/07/2018
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Rampur
Rampur
DFO
Recommended
Recommendation of 1.4194 ha. of forest land.
Rampur
CF
Recommended
Yes
Nodal Officer
Recommended
RECOMMENDED
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Himachal Pradesh
State Secretary
Recommended
06/10/2018
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Shimla
Regional Office
8B/HP/09/72/2018/FC
06/10/2020
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/HP/Others/32672/2018
OTHERS326722018770
2,080,840.00
2,080,840.00
03/05/2023
312
Union Bank Of India
Union Bank Of India (Challan)
01/04/2023
13/04/2023
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
2.8388
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
2.8388
Status of CA Land so identified :
Forest Area
Site Name :
UF-Shingla
Location Details :
Near village Shingla
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
UF-Shingla
Other Forest Land
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/HP/Others/32672/2018
27 Jul 2023
No Data
CA has been proposed over degraded Forest land, hence mutation is not required.
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/HP/Others/32672/2018
30 Sep 2023
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/HP/Others/32672/2018
Compliance report
05 Oct 2023
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/HP/Others/32672/2018
28 Dec 2023
APPROVED
Print
Checklist for State Nodal Officer
×