PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : HP-079/2022
1. Location of the project/Scheme : Himachal Pradesh
 (i) State / Union Territory : Himachal Pradesh  (ii) District : Shimla  (iii) Forest Division : Rampur  (iv) Area of forest land proposed for diversion (in ha.) : 0.182  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Rampur0.182Protected Forest
Total 0.182
Division 1. : Rampur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Shimla0.182
Total0.182
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.1820.4Eco 6
Total. 0.182


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersDeodar03614101
Total 0 36 1410 1
Sub Total (No of Trees.) 34


5. Working plan prescription for the forest land proposed for diversion : As per working plan this area falls under Deo/Kail Working Circle PB-III
6. Brief note on vulnerability of the forest area to erosion : Partially vulnerable: a drain channel is present in the vicinity
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Indian porcupine (Hystrix indica), Monkey (Macac malatta), Jackal (Canis aureus), Himalayan Black bear etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 144713
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
110.3640Shikaridhar D-114RampurD-114    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 detail of forest land diverted
2 cost of trees
3 DGPS map of proposed site
4 Revised Enumeration list
5 distance from Wildlife sanctuary area certificate
6 Alternative site map
7 NPV Bill
8 DFOs site inspection report
9 Detailed Financial Outlay of the CA Scheme
10 DFO's CA site inspection
11 No Plantation Certificate
12 Suitability of Area Certificate
13 Revised Part II - Recommendation by DFO (after decrease in area and number of trees to be felled)
14 Revised Checklist No. 7 after reducing the area to be diverted from 0.3534 to 0.1820 ha
15 Revised Bill of cost of trees after reducing the number of trees from 72 to 34
16 SITE-SPECIFIC REPORT/CERTIFICATE BY DFO

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Shimla12984839420.92779.21311031603.019230/06/20241715.57980
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 RampurCFNoNo Data
RampurRampurDFOYesOne25/04/2023
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
RampurRampurDFO RecommendedThe area proposed for diversion of 0.3534 ha. has been recommended for construction of Bus Stand Nankhari
RampurCF RecommendedJustification as per the check list No. 10 is uploaded in the web portal.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Himachal PradeshState SecretaryRecommended16/12/2024RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShimlaRegional OfficeFC/HPB/09/01/2025 19/10/2025
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/HP/Others/148085/2021OTHERS1480852021031399,114.00399,114.0020/03/2026HPSCH26079003568Union Bank Of IndiaNEFT/RTGS (Challan)27/10/202531/10/2025
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.364   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.364
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
NA
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/HP/Others/148085/202101 Apr 2026No DataCA has been proposed over degraded Forest land, hence mutation is not required.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/HP/Others/148085/202125 Apr 2026
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/HP/Others/148085/2021Compliance report06 May 2026
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/HP/Others/148085/2021Approved In-PrincipleNo Data