PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
HP-0198/2020
1.
Location of the project/Scheme :
Himachal Pradesh
(i)
State / Union Territory :
Himachal Pradesh
(ii)
District :
Kinnaur
(iii)
Forest Division :
Kinnaur
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.4148
 (v)
Category of the Proposal:
Hydel
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Kinnaur
0.4148
DPF-C-234 Kashang-I
Total
0.4148
Division 1. : Kinnaur
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Kinnaur
0.4148
Total
0.4148
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.4148
0.2
Eco 6
Total.
0.4148
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Pine
17
0
0
4
0
0
Total
17
0
0
4
0
0
Sub Total (No of Trees.)
21
(iii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
Deaodar ( Cedrus Deodara)
12
0
0
4
0
0
2
Others
Neoza ( Pinus Geradiana)
3
0
0
0
0
0
3
Others
Kail (Pinus Wallichania)
2
0
0
0
0
0
Total
17
0
0
4
0
0
Sub Total (No of Trees.)
21
(iv)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
The proposed area falls under the Protection Working Circle of the old working plan. The working plan is under revision.
6.
Brief note on vulnerability of the forest area to erosion :
The area is not seriously eroded or is not much vulnerable to erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
1
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Himalayan BLack bear, Leopard, red fox etc.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
Yes
Details of Protected Area and comments on the impact of Project on the ESZ :
The Representative of the State Government of Himachal Pradesh mentioned that the proposed site was 6 Km Horizontal distance from Lippa-Asrang Wildlife Sanctuary and as informed by the project proponents, the project is being taken up underground and surface activities are limited to construction phase and were of temporary in nature and that the project area is downstream to the sanctuary
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
208158
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
.8296
UF-Khawangi
Kalpa
467/1
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
cost of trees
2
Land Suitability Certificate
3
Location
4
Abstract of Trees
5
6
Comment of Wild Life
7
Revised Site Inspection Report
8
Revised Part-II
9
NPV
10
Reply
11
Cost Norms
12
Reply Letter
13
Undertaking for No Change in Proposal
14
Reply Letter 31.03.2023
15
Reply 25.03.2023
16
Expenditure CAT Plan
17
Reply 25.03.2023
18
CAT Plan
19
Tree Enumeration list
20
Reply 21.06.2023
21
Reply With Annexure 15.02.2024
22
Reply with Annexure
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Kinnaur
49169.66
35476.08
1134.4748
72
2044.0616
31/03/2023
1787.04
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Kinnaur
Rampur
DFO
Yes
One
15/09/2020
Rampur
CF
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Kinnaur
Rampur
DFO
Recommended
The site was inspected on dated 15 08 2020 along with the user agency and it was found out that the land identified for the proposal measuring 0.4148 Ha is a part of DPF 234 Kashang and is unavoidable and is barest minimum required for the project.The additional land is required for the Silt Flushing tunnel portal and flushing tunnel.The land required is bare minimum and is recommended for the diversion.
Rampur
CF
Recommended
The justification has been submitted by the user agency in check list No.10 which is placed in the proposal folders
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Himachal Pradesh
State Secretary
Recommended
31/10/2022
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Shimla
Regional Office
FC/HPB/01/177/2022
01/10/2024
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/HP/HYD/49387/2020
HYD493872020150
19,388,876.00
Union Bank Of India
NEFT/RTGS (Challan)
2024-11-05
2024-11-16
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/HP/HYD/49387/2020
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×