PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
HP-02/2019
1.
Location of the project/Scheme :
Himachal Pradesh
(i)
State / Union Territory :
Himachal Pradesh
(ii)
District :
Kullu
(iii)
Forest Division :
Parbati
 (iv)
Area of forest land proposed for diversion (in ha.) :
1.6201
 (v)
Category of the Proposal:
Hydel
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Parbati
1.62
Protected Forest
Total
1.62
Division 1. : Parbati
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Kullu
1.62
Total
1.62
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
1.62
0.22
Eco 6
Total.
1.62
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
Deodar (Cedrus deodara)
2
1
3
1
0
0
2
Others
Kail (Pinus Wallichiana)
1
1
2
2
0
0
3
Others
Rai (Picea Smithiana)
0
3
0
0
0
0
4
Others
Robinia (Robinia Pseudo-acacia)
1
1
0
0
0
0
5
Others
Khirak (Celtis australis)
13
18
4
0
0
0
6
Others
Daral ( Cedrella serrata)
3
11
4
1
0
0
7
Others
Brass (Rhododensdron)
2
3
0
0
0
0
8
Others
Mahaun (Almus Leavigata)
8
6
1
0
0
0
9
Others
Popular (Populus Ciliata)
2
1
0
0
0
0
10
Others
Ban (Quercus incana)
0
1
0
0
0
0
11
Others
Khachan (Acer acuminatum)
1
0
0
0
0
0
12
Others
Broad leave
14
0
0
0
0
0
13
Dendrocalamus Strictus
Nirgal (dendrocalamus Strictus)
112
0
0
0
0
0
Total
159
46
14
4
0
0
Sub Total (No of Trees.)
223
(iii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
(iv)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
No working plan prescription for the forestland proposed for diversion.
6.
Brief note on vulnerability of the forest area to erosion :
The area is stable and is currently free from erosion. Vulnerability of forest area to erosion is insignificant.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Leopard, sparows, Bear, Fox etc.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
7.45
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
3.25
Komi Gar Grahan beat
Kasol
Komi Gar of Grahan Beat
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
Enumeration List of Trees
2
Distance from WL Sanc and GHNP
3
Revised NPV
4
Proceeding of FRA certificate
5
Inter connecting and plan line diagram
6
Revised CA after incorporation 50% Oak spp.
7
Revised NPV for Grahan Kasol SHEP
8
Report on ESZ and Mitigation Plan
9
Comments of CWLW
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Kullu
550300
495200
483.955
64
865.79
30/06/2019
865.79
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Parbati
Kullu
DFO
Yes
One
24/04/2019
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Parbati
Kullu
DFO
Recommended
The proposal is recommended for diversion of 1.62 ha of forestland under FCA, 1980 for the construction of 5.00 MW Grahan Kasol Small Hydro electric power Project as the forest area involved in the proposal is unavoidable and barest minimum.
Kullu
CF
Recommended
Justified
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Himachal Pradesh
State Secretary
Recommended
02/07/2020
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Shimla
Regional Office
8B/HP/01/57/2020/FC
22/01/2025
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/HP/HYD/36856/2018
HYD368562018500
10,177,690.00
10,177,700.00
27/03/2025
A979060
Union Bank Of India
Union Bank Of India (Challan)
NA
NA
FP/HP/HYD/36856/2018
HYD368562018962
108.00
108.00
03/10/2025
AXSK252760008244
Union Bank Of India
Union Bank Of India (Challan)
20/09/2025
24/09/2025
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
3.25
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
3.25
Status of CA Land so identified :
Forest Area
Site Name :
Komi Gar Grahan beat
Location Details :
Komi Gar Grahan beat
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Kasol
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/HP/HYD/36856/2018
01 Jul 2025
No Data
CA has been proposed over degraded forest land, hence mutation is not required.
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/HP/HYD/36856/2018
08 Oct 2025
Compliance Details Submitted by User Agency(old)
Proposal No.
Compliance Details submitted on(Date)
Reject Remarks
Reject Date
Uploaded Letter
FP/HP/HYD/36856/2018
15 Jul 2025
EDS: EDS
03 Sep 2025
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/HP/HYD/36856/2018
Compliance reported to GoI
02 Aug 2025
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/HP/HYD/36856/2018
08 Nov 2025
APPROVED
Print