PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
HP-050/2018
1.
Location of the project/Scheme :
Himachal Pradesh
(i)
State / Union Territory :
Himachal Pradesh
(ii)
District :
Chamba
(iii)
Forest Division :
Churah
 (iv)
Area of forest land proposed for diversion (in ha.) :
9.739
 (v)
Category of the Proposal:
Hydel
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Churah
9.739
Protected Forest
Total
9.739
Division 1. : Churah
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Chamba
9.739
Total
9.739
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
9.739
0.06
Eco 6
Total.
9.739
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
Halew ( Comus Macrophylla )
34
2
0
0
0
0
2
Others
Mandhu ( Acer Caesion )
18
6
1
1
0
0
3
Others
Piak ( Anlus Nitida )
145
44
4
4
0
0
4
Others
Kail ( Pinus Wallichiana )
0
1
0
0
0
0
5
Others
Ailhan ( Ailanthus )
5
4
0
0
0
0
6
Others
Arkher ( Rhus Species )
1
0
0
0
0
0
7
Others
Deodar ( Cedrus Deodara )
7
3
0
0
0
0
8
Others
Kainth ( Pyrus Pashia )
2
0
1
0
0
0
9
Others
Ban ( Quercus Incana )
4
0
0
0
0
0
10
Others
Douri ( Toona Serrata )
3
0
0
0
0
0
11
Others
Talunj ( Eucalyptus Supp)
6
3
0
1
0
0
12
Others
Khirk ( Celtis Austrails )
2
1
0
0
0
0
13
Others
Pahgura ( Ficus Glomerta )
2
1
0
0
0
0
14
Others
Goon ( Aesculus Indica )
1
0
0
0
0
0
15
Others
Shrugdu ( Fraxinus Floripunda )
2
1
0
0
0
0
16
Others
Nakh ( Pyrus Communis)
1
0
0
0
0
0
17
Others
Badah ( salix species)
83
11
0
0
0
0
Total
316
77
6
6
0
0
Sub Total (No of Trees.)
405
(iii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
(iv)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
Protection Working Circle
6.
Brief note on vulnerability of the forest area to erosion :
The Proposed alignment is not vulnerable to erosion and does not form a part of seriously eroded area as the strata of the land are quite stable
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0.100
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
There are Monkey ,Fox , Piegon ,sparrows are found present arround the areas
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
22.42
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
19.500
Chiuli
Tissa
Chiuli
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
abstract of trees
2
JOINT INSPECTION REPORT
3
CERTIFICATE FOR NON-EXISTENCE IN WILDLIFE SANTUARY
4
forwarding letter
5
Value of trees
6
site inspection report
7
General Layout Plan of DeviKothi
8
Reply of Superintending Engineer O/o Director of Energy GoHP . regarding Ravi basin Study
9
cost benefit ratio
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Chamba
652200
243700
120.2219
31
240.4438
31/03/2018
240.4438
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Chamba
CF
No
No Data
Churah
Chamba
DFO
Yes
One
26/04/2018
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Churah
Chamba
DFO
Recommended
Out of various alternatives studied the proposed scheme attached for the Forest clearance comprising of Intake basin on right side of Balsio Nallah, underground HRT and Power house on right side of Balsio Nallah has been considered as the best option in view to utilize the best combination of head and discharge with the minimum unavoidable forest land involved
Chamba
CF
Recommended
proposed fore the diversion of construction of HEp
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Himachal Pradesh
State Secretary
Recommended
06/09/2019
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Shimla
Regional Office
8B/HP/01/116/2019/FC
16/06/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/HP/HYD/32280/2018
HYD322802018345
30,290,568.00
30,290,568.00
2023-02-21
886667
Union Bank Of India
NEFT/RTGS (Challan)
2022-09-08
2022-09-09
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
19.5
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
19.5
Status of CA Land so identified :
Forest Area
Site Name :
chiunli
Location Details :
village chiunli tehsil churah sei block range tissa distt:- Chamba State H.P.
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
chiunli
Others
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/HP/HYD/32280/2018
02 Mar 2023
No Data
CA has been proposed over degraded Forest land, hence mutation is not required.
Compliance Details Submitted by User Agency(old)
Proposal No.
Compliance Details submitted on(Date)
Reject Remarks
Reject Date
Uploaded Letter
FP/HP/HYD/32280/2018
13 Jun 2023
EDS: EDS
27 Jun 2023
FP/HP/HYD/32280/2018
24 Apr 2023
EDS: EDS
29 May 2023
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/HP/HYD/32280/2018
Compliance reported to GoI
27 Apr 2023
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/HP/HYD/32280/2018
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×