PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : HP-0102/2022
1. Location of the project/Scheme : Himachal Pradesh
 (i) State / Union Territory : Himachal Pradesh  (ii) District : Kullu  (iii) Forest Division : Kullu  (iv) Area of forest land proposed for diversion (in ha.) : 2.4957  (v)

Category of the Proposal: Hydel
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Kullu2.4957UPF (Barsai-III)
Total 2.4957
Division 1. : Kullu
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kullu2.4957
Total2.4957
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.49570.0055Eco 6
Total. 2.4957


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersKail ( Pinus Wallichiana)330000
2OthersKosh ( Alnus Nitida)000100
Total 3 30 10 0
Sub Total (No of Trees.) 7

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

5. Working plan prescription for the forest land proposed for diversion : Proposed land coming in UPF Barsai–III and which is not managed by the Working Plan
6. Brief note on vulnerability of the forest area to erosion : There is no possibility of erosion of forest land by the construction of the proposed project.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Monkey etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1484890
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
115UPF Barsai-IIINaggarBarsai-III    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Reply of EDS raised by GoI on dated 29-11-2022
2 Check List-08
3 Cost of tress
4 NAC of CA
5 Bill of NPV
6 Cost of reclamation plan
7 Check List -07
8 List of trees
9 List of trees
10 Reply of CF, Kullu letter dated 9/2/2023

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Kullu550300495200489.03321721048.988131/03/2022954.19880
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
KulluKulluDFOYesOne16/06/2022
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
KulluKulluDFO RecommendedThe requirement of forest land as proposed by the user agency is unavoidable and is barest minimum required for the proposed project. Hence , recommended for approval .
KulluCF RecommendedThe proposal is justified and same is recommended under FCA 1980Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Himachal PradeshState SecretaryRecommended06/10/2022RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShimlaRegional OfficeFC/HPB/01/160/202228/07/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/HP/HYD/145089/2021HYD14508920213572,728,151.002,728,151.002023-08-1174575Union Bank Of IndiaNEFT/RTGS (Challan)2023-08-082023-08-10
FP/HP/HYD/145089/2021HYD14508920213572,728,151.00807,430.002023-09-19168246Union Bank Of IndiaNEFT/RTGS (Challan)NANA
FP/HP/HYD/145089/2021HYD1450892021992807,430.00807,430.002023-11-16INDBN19090520543Union Bank Of IndiaUnion Bank Of India (Challan)2023-09-142023-09-16
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 5   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)5
  Status of CA Land so identified : Forest Area   Site Name : Soyal   Location Details : Barsai Beat, Naggar Forest Range, Kullu Forest Division Distt. Kullu HP   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
BarsaiOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/HP/HYD/145089/202123 Sep 2023No DataCA has been proposed over degraded Forest land, hence mutation is not required.
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/HP/HYD/145089/202112 Aug 2024EDS: EDS01 Oct 2024
FP/HP/HYD/145089/202113 Feb 2024EDS: EDS05 Apr 2024
FP/HP/HYD/145089/202104 Oct 2024EDS: eds05 Dec 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/HP/HYD/145089/2021Compliance reported to GoI20 Feb 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/HP/HYD/145089/2021Approved In-PrincipleNo Data