PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : HP-0189/2016
1. Location of the project/Scheme : Himachal Pradesh
 (i) State / Union Territory : Himachal Pradesh  (ii) District : Mandi  (iii) Forest Division : Karsog  (iv) Area of forest land proposed for diversion (in ha.) : 0.7649  (v)

Category of the Proposal: Hydel
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Karsog0.7649Protected Forest
Total 0.7649
Division 1. : Karsog
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Mandi0.7649
Total0.7649
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.76490.05Eco 5
Total. 0.7649


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersKail (Pinus wallichiana)010000
2OthersDeodar (Cedrus deodara)070000
3Pinus Griffithi MichellChil (Pinus Roxborghii)0110000
Total 0 190 00 0
Sub Total (No of Trees.) 19

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

5. Working plan prescription for the forest land proposed for diversion : Deodar Working Circle.
6. Brief note on vulnerability of the forest area to erosion : There is no possibility of soil erosion in the proposed area.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.3
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Fox, leopard, Monkey etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 0.91
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
10D-136 ParlogKarsogwhole    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Mandi61768.84167500149.4018298.30231/03/2017258.5380
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
KarsogMandiDFOYesOne06/09/2017
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
KarsogMandiDFO RecommendedThis proposed Small Hydro Power Project shall increase the economic activity in the local area and also helpful to improve the state economy.
MandiCF Recommended Being developmental activity and involvement of minimum area ,case been recommended.Yes
Nodal Officer Recommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Himachal PradeshState SecretaryRecommended24/11/2017 Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
ShimlaRegional Office8B/HP/01/116/201701/05/2018
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/HP/HYD/14396/2015HYD1439620156221,128,389.001,128,390.002024-12-14RTGSICICR42024121400512966UBIN0996335Union Bank Of IndiaNEFT/RTGS (Challan)NANA
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 0.38   (iii). No. of Maintenance years: 11   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)0.38
  Status of CA Land so identified : Forest Area   Site Name : Parlog   Location Details : D-136 Parlog   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
PF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/HP/HYD/14396/201513 Jan 2025No DataCA has been proposed over degraded Forest land, hence mutation is not required.
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/HP/HYD/14396/2015Approved In-PrincipleNo Data