PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : DL-03/2021
1. Location of the project/Scheme : Delhi
 (i) State / Union Territory : Delhi  (ii) District : South West  (iii) Forest Division : DCF West  (iv) Area of forest land proposed for diversion (in ha.) : 4.89  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1DCF West4.89Forest by dictionary meaning
Total 4.89
Division 1. : DCF West
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1South West4.89
Total4.89
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
14.890.8Eco 3
Total. 4.89


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Dalburgia Sisooshisham124000
2Acacia Niloticababool100000
3Syzigium Cuminijamun010000
Total 2 34 00 0
Sub Total (No of Trees.) 9


5. Working plan prescription for the forest land proposed for diversion : no working plan
6. Brief note on vulnerability of the forest area to erosion : not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : no significant wildlife is present
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 39954635
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
114.89NFLDwarka range /West delhi37/1 37/2 37/3 37/4    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 THIS PRJECT IS BEING RECOMMEDNED IN PUBLIC INTEREST. THE EXECUTION OF THIS PROJECT IS LIKELY TO ADD IN STRENGTHENING OF POWER SUPPLY SYSTEM IN NATIONAL CAPTAL TERRITORY, DELHI
2 site inspection report by competent authority
3 npv calculation
4 C.A LAND SUITABILITY CERTIFICATE

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1South West15810.5301221.913012/04/202100
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DCF WestDelhiDFOYesOne24/02/2021
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DCF WestDelhiDFO RecommendedThe project for diversion of 4.8899 Ha forest land for construction of DC Khetri Jhatikara transmission line PGCIL has been recommended as project is specific for uninterrupted power supply in NCT Delhi. The execution of this project is likely to strenthen the power supply system in Delhi.
DelhiCF RecommendedThe said proposal involves the least use of forest land against the other alternatives explored by the user agency and involves minimum use of forest land and cutting of trees which is unavoidable, it is being recommended. Yes
Nodal Officer RecommendedThe proposal is being recommended in larger public interest.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
DelhiState SecretaryRecommended25/05/2021The proposal is being recommended in larger public interest.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/DLI/04/4/2021/FC18/06/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/DL/TRANS/46658/2020TRANS46658202023650,904,093.0050,904,093.0029/06/2021SBIN617930600376Union Bank Of IndiaNEFT/RTGS (Challan)24/06/202124/06/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 4.89   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)4.89
  Status of CA Land so identified : Non Forest Area   Site Name : dhoolsiras village dwarka   Location Details : dhoolsiras   Uploaded GPS File :   Uploaded Scanned copy of Map :   Whether land Mutated or not : No
Status of CA Land so identified
District Name. Name of Tehsil.
South WestNajafgarh
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/DL/TRANS/46658/202018 Feb 2022No DataThe CA land details are correct as per the details submitted in the proposal.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/DL/TRANS/46658/202023 Feb 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/DL/TRANS/46658/202011 Aug 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/DL/TRANS/46658/202029 Aug 2023APPROVED