PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : DL-01/2022
1. Location of the project/Scheme : Delhi
 (i) State / Union Territory : Delhi  (ii) District : South East  (iii) Forest Division : DCF South  (iv) Area of forest land proposed for diversion (in ha.) : 1.282  (v)

Category of the Proposal: Railway
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1DCF South1.282Deemed Forest
Total 1.282
Division 1. : DCF South
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1South East1.282
Total1.282
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.2820.8Eco 3
Total. 1.282


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Cassia FistulaAmaltash332001
2Dalburgia SisooSHISHAM210110
3Ficus ReligiosaPipal342319
4Azadirachta IndicaNeem728131
5Holoptolia IntegrifoliaPapri810200
6Albizzia lebbeckSiras99464510
7Bombax CeibaSHEMAL110000
8Mangifera IndicaAam100011
9Psidium GuajavaAMRUD942000
10Saraca AsocaASHOKA2900100
11Ficus benghalensisBARGAD000001
12Aegle MarmelosBELPATTAR001000
13Calistemon LanceolatusBOTAL BRUSH001000
14Ficus RacemosaGULAR010000
15Delonix RegiaGULMOHAR000010
16TammarindIMLI200000
17Syzigium CuminiJAMUN231042
18EucalyptusSafeda000101
19Anona SquamosaSHARIFA010000
20OthersKikar1050320
21OthersShahtoot14611500
22OthersKadi Patta100000
23Otherskaner300000
24OthersMahua000002
25OthersNimbu720000
26OthersPakkad001000
27OthersPam011000
28OthersPilkhan020000
29OthersSantra100000
30OthersBer230001
31OthersBakayan012320
32OthersBougainvilea100000
33Othersjungle jalebi345312
34OthersFicus120000
Total 209 9341 2817 21
Sub Total (No of Trees.) 409


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : The land is not vulnerable to erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 9.3
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : NIL
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 149
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111.282Non-forest landDwarka range /West delhi60//10 part, 60//1 part, 60//2 part, 60//11/1 part, 53//22 part, 53//18 part, 53//19 part, 53//13 part, 61//15 part, 110 part    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1South East24944848040.621110021/10/20161000
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DCF SouthDelhiDFOYesOne31/01/2022
 DelhiCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DCF SouthDelhiDFO RecommendedThe project being recommended as it will improve the Rail Transport system.
DelhiCF RecommendedThe proposal for diversion of 1.282 Ha. deemed forest land for Construction of Delhi Gurugram SNB RRTS Corridor by National Capital Region Transport Corporation NCRTC is being recommended as execution of the project will lead to significant reduction of pollution, traffic congestion and reduction in travel time in Delhi NCR. Yes
Nodal Officer RecommendedThe proposal is recommended for approval from the Competent Authority for Diversion of 1.282 Ha. Deemed Forest land for Construction of Delhi Gurugram SNB RRTS Corridor by National Capital Region Transport Corporation NCRTC as execution of this project is in larger public interest and will lead to decongestion of traffic in the Delhi NCR.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
DelhiState SecretaryRecommended24/02/2022The proposal is being recommended.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/DLI013/2022-JPR22/03/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/DL/RAIL/149368/2021RAIL149368202137716,699,576.3016,699,576.0030/03/2022SBIN222089689168Union Bank Of IndiaNEFT/RTGS (Challan)25/03/202225/03/2022
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 1.282   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1.282
  Status of CA Land so identified : Non Forest Area   Site Name : sec-29, Dwarka,   Location Details : Sec-29, Dwarka   Uploaded GPS File :   Uploaded Scanned copy of Map :   Whether land Mutated or not : No
Status of CA Land so identified
District Name. Name of Tehsil.
South WestNajafgarh
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/DL/RAIL/149368/202127 Dec 2022No DataThe data has been found in order.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/DL/RAIL/149368/202128 Dec 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/DL/RAIL/149368/202108 Jun 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/DL/RAIL/149368/202122 Jun 2023APPROVED