PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : CG-021/2020
1. Location of the project/Scheme : Chhattisgarh
 (i) State / Union Territory : Chhattisgarh  (ii) District : Raigarh  (iii) Forest Division : Dharamjaigarh  (iv) Area of forest land proposed for diversion (in ha.) : 10.465  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Dharamjaigarh4.832Revenue Forest
2Dharamjaigarh1.636Protected Forest
3Dharamjaigarh3.997Reserved Forest
Total 10.465
Division 1. : Dharamjaigarh
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Raigarh10.465
Total10.465
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
110.4650.5Eco 3
Total. 10.465


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Shorea RobustaSal801445716314
2Terminalia TomentosaSaja911483723311
3Madhuca indicaMahua13322013814
4Mangifera IndicaAam113000
5Tectona GrandisSagon100000
6Lagerstroemia ParvifloraSenha212511300
7Otherschar, bhelwa, jamun, ber, kosam, kasai, arkesia353557149483634
Total 560 907277 10350 73
Sub Total (No of Trees.) 1970


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Vulnerable forest area on the both sides of proposed road need to be taken care to stop soil erosion under the guidance and supervision of Division Forest Office, Dharamjaigarh
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Elephant, Fox, Monkey, Jackal, Rabbits, Snakes, Squirrels etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : The proposed road project passes through the Lemru Elephant Reserved Area. The proposed road project poses no threat to Elephant movement of distrubance to Elephant at present. It is recommended for User agency An embankment should be made keeping in mind that elephants should not have any problem to cross the road and install Elephant movement sign boards at appropriate interval along the road passing through the prposed forest area.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The proposed road project passes through the Lemru Elephant Reserved Area. The proposed road project poses no threat to Elephant movement of distrubance to Elephant at present. It is recommended for User agency An embankment should be made keeping in mind that elephants should not have any problem to cross the road and install Elephant movement sign boards at appropriate interval along the road passing through the prposed forest area.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 20420373
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1116.699OA 36/1ChaalOA 36/1    View file
226.538OA 69/1ChaalOA 69/1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 CL 3
2 CL 20
3 CL 25
4 CL 27
5 CL 29
6 CL 7
7 CL 16
8 CL 1
9 CCF Part 3
10 CL 12
11 CL 24
12 CL 26
13 CL 38
14 CL 39
15 CL 40
16 CL 8
17 CL 17
18 CL 35
19 CL 28
20 CL 43
21 CL 44
22 CL 2
23 CL 9
24 CL 13
25 CL 14
26 CL 18
27 CL 21
28 CL 30
29 CL 31
30 CL 32
31 CL 34
32 CL 37
33 CL 10
34 CL 11
35 CL 15
36 CL 19
37 CL 22
38 CL 23
39 CL 42
40 CL 5
41 CL 33
42 CL 36
43 CL 41
44 CL 26 DFO, Site visit praptra 3
45 CL 4
46 Atirikt 02 point ki jankari
47 Road Proposed area DGPS

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Raigarh708600171341.90419.43381917.62720/06/20221917.6270
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DharamjaigarhBilaspur(CG)DFOYesOne09/03/2022
 Bilaspur(CG)CFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DharamjaigarhBilaspur(CG)DFO RecommendedAam nagriko or anya sabhi ke awagaman suvidha ko dhyan rakhte hue anusansa part 2 S.no. 13 ke Condition pr Recommendation ki jati hai
Bilaspur(CG)CF RecommendedRecommendedYes
Nodal Officer RecommendedEnclosed
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
ChhattisgarhState SecretaryRecommended10/03/2023RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
RaipurRegional OfficeFC-II/IROCH-18/202324/03/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/CG/ROAD/43587/2019ROAD43587201966035,137,880.0035,137,880.002023-05-08952809Union Bank Of IndiaNEFT/RTGS (Challan)2023-04-272023-05-03
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 23.237   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)23.237
  Status of CA Land so identified : Non Forest Area   Site Name : Ponichhal Khasra no. 36/1 and Sithara Khasra no. 39/1   Location Details : Ponichhal Khasra no. 36/1 and Sithara Khasra no. 39/1   Uploaded GPS File :   Uploaded Scanned copy of Map :   Whether land Mutated or not : No
Status of CA Land so identified
District Name. Name of Tehsil.
RaigarhUdaipur (Dharamjaigarh)
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/CG/ROAD/43587/201901 Jun 2023No DataVerify
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/CG/ROAD/43587/201902 Jun 2023EDS: SEE PDF FILE AND COMPLY19 Sep 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/CG/ROAD/43587/201914 Aug 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/CG/ROAD/43587/2019Approved In-PrincipleNo Data