PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : CG-034/2022
1. Location of the project/Scheme : Chhattisgarh
 (i) State / Union Territory : Chhattisgarh  (ii) District : Rajnandgaon,Raigarh,Bilaspur,Korba,Janjgir - Champa  (iii) Forest Division : Khairagarh,Raigarh,Bilaspur,Korba,Janjgir Champa  (iv) Area of forest land proposed for diversion (in ha.) : 15.6909  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Janjgir Champa3.9278Protected Forest
2Janjgir Champa0.8776Revenue Forest
3Bilaspur0.0191Revenue Forest
4Raigarh0.1517Protected Forest
5Raigarh0.797Reserved Forest
6Raigarh2.6271Revenue Forest
7Khairagarh5.203Protected Forest
8Baloda Bazar0Revenue Land
9Korba2.0873Unclassed Forests
Total 15.6906
Division 1. : Bilaspur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bilaspur0.0191
Total0.0191
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.01910.2Eco 3
Total. 0.0191


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersNill000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : Revenue Forest (Bade/Chhote Jhad ka Jangal)
6. Brief note on vulnerability of the forest area to erosion : Proposed Divertion is for linear project (MNJPL, Construction of Gas Pipe Line ) which is under ground pipe line. Not vulnerable for any soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data

Additional information Details
S. No. DocumentsRemarks
1 Certificate Regarding - Check List 21
2 Map Showing GEO Reference Pipe Line Corridor of Gail
3 Bilaspur Survey of India Map
4 FMIS Maps 5 Nos Forest Cover Map Topo Sheet no. 64-G13, K01, J04, J08 & K05
5 Index Map
6 Vachan Patra for Violation of FCA - Chech List 18
7 Chetchment Treatment Plan- Check List 22
8 Alternete Root Map 1 and 2
9 U.A. Mang Patra- Check List 01
10 Check List No 26 Part-1 to 5 and Prapatra-III, Inspection Report
11 Vachan Patra for NPV- Check List 36
12 Vachan Patra for Not Start the Work- Check List 39
13 MNJPL-II Project Map
14 Part-II Point No. 6 Check List No. 38
15 Check List 04- Non Forest Area
16 Vachan Patra- Minimum Forest Land Check List 10
17 Paryavaran Sanrakchhar Praman Patra- Check List 11
18 Vachan Patra for Responsible Officer Violation of FCA - Check List 19
19 Check List 32 National Park
20 Vachan Patra Check List 34 FRA
21 Certificate of Registration- Check List 41
22 Vachan Patra for Wild Life- Check List 42
23 Part-II Point 5 Check List no 03
24 Tree Felling- Check List 12
25 Vachan Patra for Action- Check List 20
26 Certificate of Collector for Revenue Forest Land- Check List 35
27 Vachan Patra for Deposition of Fund with the Ad-HOC Campa- Check List 37
28 Vachan Patra for CA- Check List 09
29 CA Area Vachan Patra- Check List 16
30 DFO's Proposal Submission Letter No. 326 dated 28-02-2023
31 Reclamation Plan- Check List 23
32 Check list 07 Form-IV
Division 2. : Janjgir Champa
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Janjgir - Champa4.8054
Total4.8054
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
14.80540.6Eco 3
Total. 4.8054


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Teaksagoun174460000
2Misc. SpeciesJalau075110
3Misc. SpeciesGandhiriwa000210
Total 174 535 32 0
Sub Total (No of Trees.) 237


5. Working plan prescription for the forest land proposed for diversion : The area is covered under plantation working circle of Working plan
6. Brief note on vulnerability of the forest area to erosion : Area is not vulnerable to soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : NO
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data

Additional information Details
S. No. DocumentsRemarks
1 collector NOC
2 forest area
3 FRA
4 pra-3
5 fees
Division 3. : Khairagarh
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Rajnandgaon5.203
Total5.203
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
15.2030.5Eco 3
Total. 5.203


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1TeakTeak & Other152723283763820
Total 152 723283 7638 20
Sub Total (No of Trees.) 1292


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Gas pipe Line & OFC Line
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : no
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : No
S.No. ComponentForest Area(in ha.)
NO Data


11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 173.99
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1118.000otherRaipurkhasra No. - 926    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Tree Cutting and Vidohan Yojna
2 FORM-IV
3 CA Collector NOC Raipur
4 DFO Part-II Report
5 CA- Toposheet Map
6 CA Land Suitibility
7 Registration & Processing Chalan copy
8 Diversion 5.203 ha. DGPS
9 FMIS-Vegetation Map
10 Diversion Revenue Forest Collector NOC
11 NPV Amount
12 CA-DGPS Report 18.000 ha.
13 CA - Geo-refrence Map
14 Cost Benefit Analysis
15 44 Checklist Prativedan Memo
Division 4. : Korba
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Korba2.0873
Total2.0873
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.08730.2Eco 3
Total. 2.0873


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Misc. SpeciesNil000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : After getting stage - 1 approval
6. Brief note on vulnerability of the forest area to erosion : No chance of erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nill
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data

Additional information Details
S. No. DocumentsRemarks
1 Check list 25
2 Check list 9
3 Check list 13 cost benifit analy.
4 Check list 22
5 Check list 23
6 Check list 26
7 Check list 27
8 Check list 28
9 Check list 33
10 Check list 35
11 Check list 1
12 Check list 3 detail of forest land
13 Check list 15
14 Check list 24
15 Check list 4
16 Check list 5 SOI Map
17 Check list 6 index map
18 Check list 8 project datil teep
19 Check list 10
20 Check list 14
21 Check list 17
22 Check list 18
23 Check list 2 Praptra 1
24 Check list 7 praptra 4
25 Check list 11
26 Check list 37
27 Check list 40
28 Check list 41
29 Check list 42
30 Check list 12
31 Check list 16
32 Check list 19
33 Check list 20
34 Check list 36
35 Check list 39
36 Check list 44
37 village map
38 Check list 21
39 SOI Map
40 Check list 29
41 Check list 30
42 Check list 31
43 Check list 43
44 Check list 32
45 Check list 34
46 Check list 38
47 Alternet map 1
48 Forest FMIS Map
Division 5. : Raigarh
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Raigarh3.5758
Total3.5758
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.57580.6Eco 3
Total. 3.5758


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Terminalia BellaricaBaheda211000
2Pterocarpus MarsupiumBeeja2170000
3Terminalia TomentosaSaaja7321100
4Shorea RobustaSaal6254000
5Diasporus MelanoxylonTendu420000
6Azadirachta IndicaNeem100000
7SchreberaswictinioibesGhata010000
8Acacia CatechuKhair0190000
9Aegle MarmelosBel010000
10Dalbergia LatifoliaShisham030000
11Butea MonospermaPalash011000
12OthersOthers3715228310
13Madhuca indicaMahua284103
Total 61 26239 51 3
Sub Total (No of Trees.) 371


5. Working plan prescription for the forest land proposed for diversion : NA
6. Brief note on vulnerability of the forest area to erosion : Area is not vulnerable to soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.000
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data

Additional information Details
S. No. DocumentsRemarks
1 Checklist 8 Project details
2 Checklist 3 Forest land details diverted
3 Checklist 11 EC
4 Checklist 14 NFL CA
5 Checklist 10 Minimum land uses
6 Checklist 1 UA demand letter
7 Checklist 4 Non forest land details
8 Checklist 5 Toposheet and F
9 Checklist 32 10km radius
10 Checklist 33 15km radius mining
11 Checklist 44 Others
12 Checklist 19 Voilation details 2
13 Checklist 36 NPV Calculation
14 Checklist 40 500 ha large area
15 Checklist 42 WL
16 Checklist 6 Index map
17 Checklist 7 Form IV
18 Checklist 9 CA Undetaking
19 CA Suitability
20 Checklist 21 CA CS
21 Checklist 24 Mining Plan
22 Checklist 26 Site Inspection report
23 Checklist 27 Historical Place
24 Checklist 28 Gram Sabha
25 Checklist 37 Ad hoc campa
26 Checklist 38 Soil Productivity
27 Checklist 12 Form ABC
28 Checklist 13 CBA
29 Checklist 15 NFL Near Map
30 Checklist 22 CAT
31 Checklist 30 Senctioned project list
32 Checklist 34 FRA
33 Checklist 39 NO Work
34 Checklist 41 Reg and DD
35 Checklist 43 Alternative Root
36 Checklist 2 Registration and DD
37 Checklist 16 CA Scheme
38 Checklist 29 District land details
39 Checklist 31 Category sanctioned project list
40 Checklist 18 Voilation details(1)
41 Checklist 20 Voilation details 20
42 Checklist 23 Reclamation
43 Checklist 25 Re settlement
44 Checklist 35 NOC Collector

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Raigarh683600296519.53829.6836950.0021/03/20233086.291161.976
2Korba2820002136471098.80218137928/01/2016137920
3Janjgir - Champa44667425006.600232.89410853.00031/12/202200
4Bilaspur35080078336.200723.37817698.96421/02/2023698.96424.414
5Rajnandgaon227680.000130551.208219.24217011/04/2023101.82294.159
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
KorbaBilaspur(CG)DFOYesOne14/02/2023
Janjgir ChampaBilaspur(CG)DFOYesOne06/02/2023
BilaspurBilaspur(CG)DFOYesOne15/11/2022
RaigarhBilaspur(CG)DFOYesOne28/03/2023
KhairagarhDurgDFOYesOne10/04/2023
 DurgCFNoNo Data
 Bilaspur(CG)CFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
KorbaBilaspur(CG)DFO RecommendedIt is recommended keeping in view the public interest.
Janjgir ChampaBilaspur(CG)DFO RecommendedRecommended
BilaspurBilaspur(CG)DFO RecommendedRecommended
RaigarhBilaspur(CG)DFO RecommendedRecommended
KhairagarhDurgDFO Recommended??????? ?????? ??????? 18’’ ??? ????? ?? ??? ???? ???? ??? ?.??.??. ???? ?????? ?? ?????? ???? ??? ?????? ????? ?? ???? ?? ??????? ??????? 1980 ?? ??????? ????? ??????? ??? ??????? ??????? ?????? ????????? ?? ???????? ???????? ???? ??? ?? ?????? ?????? ??? ?????? ?????? ???????? ?? ??? ??? ?? ???????? ?? ????????? ????? ?? ????????? ??? ?? ??????? ?????
DurgCF RecommendedSee PDF RecommendedYes
Bilaspur(CG)CF RecommendedRecommendedYes
Nodal Officer Recommendedenclosed
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
ChhattisgarhState SecretaryRecommended09/05/2023RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
RaipurRegional OfficeFC-II/IROCH-20/202324/05/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/CG/Others/154619/2022OTHERS154619202224050,889,491.0050,889,491.0028/06/20237857Union Bank Of IndiaNEFT/RTGS (Challan)07/06/202308/06/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 18   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)18
  Status of CA Land so identified : Non Forest Area   Site Name : Vill.-Bhalera, Teh.-Arang, Dist.-Raipur   Location Details : Vill.-Bhalera, Teh.-Arang, Dist.-Raipur   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
RaipurRaipurRaipur115A/59/2022/2331 Jul 202318
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/CG/Others/154619/202220 Sep 2023No DataVerify
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/CG/Others/154619/202220 Sep 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/CG/Others/154619/202229 Sep 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/CG/Others/154619/202221 Nov 2023APPROVED