PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AS-09/2021
1. Location of the project/Scheme : Assam
 (i) State / Union Territory : Assam  (ii) District : Goalpara  (iii) Forest Division : Goalpara  (iv) Area of forest land proposed for diversion (in ha.) : 27.054  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Goalpara14.947Reserved Forest
2Goalpara12.107Proposed Reserved Forests (Sec-4 of IFA)
Total 27.054
Division 1. : Goalpara
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Goalpara27.054
Total27.054
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
1364.580.4Eco 1
Total. 364.58


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Terminalia ArjunaArjun681212
2Aegle MarmelosBell200000
3Ficus ReligiosaBhadeya100000
4Semecarpus AnacardiumBhalowa510000
5Aegle MarmelosBhel011000
6Albezzia LabbeckBhola010000
7Terminalia BellaricaBohera11365325
8Ficus BengalensisBot000011
9Ficus benghalensisbotgos000001
10Syzigium CuminiChum017210
11EucalyptusEucalyptus000100
12Gmelin ArboreaGamari020210
13Azadirachta IndicaGhoro Neem000120
14Terminalia ChebulaHilikha010000
15Syzigium JambousJamuk8333000
16Acacia AuriculiformisKorai3245102
17Melotus PhilippensisKum54341000
18Ficus RacemosaLarubandha000100
19Psidium GuajavaMadhuriaam120000
20Shorea RobustaMakri sal5429463232214
21Mangifera IndicaMango001001
22Azadirachta IndicaNeem152110
23Mangifera IndicaAam022000
24Acacia CatechuAcacia010142423
25Emblica OfficianalisAmlakhi100000
26Aegle MarmelosAmora420100
27Lagerstroemia ParvifloraAzar7155453
28Melia AzadirachtaBrojanali020000
29Cassia SiameaCassia Siamea02310326188
30EucalyptusClass E001000
31Pakia BiglandulosaDawa010000
32Ficus RacemosaDombaru330000
33Cassia FistulaDutkhori86476100
34Syzigium CuminiJam2291287113
35Azadirachta IndicaJia16317500
36Anthocephalus CadambaKadam2103547
37Bischofia JavanicaKaros022000
38Bombax CeibaKatakuti2170000
39Artocarpus HeterophyllusKathal022411
40Duabanga GrandifloraKhokan000100
41Melia AzadirachtaKhorika000010
42Pongamia PinnataKoroch011002
43Delonix RegiaKrishnachura12719204
44Erythrina IndicaModar040010
45Moringa oleiferaMunga074010
46OthersNon Sal Sapling51100000
47Melia AzadirachtaOxi150111
48Mimusops ElengiPakhiri100022
49Butea MonospermaPalash052313
50Chukrasia TabularisPoma2168621
51Mimusops ElengiPonial100000
52Butea MonospermaRadhachura0081531
53Samania SamanRain tree0644717
54Tectona GrandisSagun600000
55Alstonia ScholarisSaitan240000
56Shorea RobustaSal28203462897452172109
57Shorea RobustaSal Sapling229600000
58Alstonia ScholarisSatiana2139985
59Gmelin ArboreaSika Gamari100000
60Greviia RobustaSilver Oak003200
61Bombax CeibaSimalu020000
62Bombax CeibaSimul014312
63Albezzia LabbeckSiris3103000
64Cassia FistulaSonaru21277100
65Tectona GrandisTeak1210860
66OthersSapling235000000
67Tectona GrandisSagun Putula3530000
68OthersBhat Ghila230100
69OthersBhel Khor2185210
70OthersBhelu020000
71OthersBhoj010000
72OthersBogori5175510
73OthersBon Bogori110000
74OthersFicus000010
75OthersKanchan050000
76OthersKumbhi3317130
77OthersMoss002010
78OthersNeuri000001
79OthersOdal693000
80OthersOri001000
81OthersOutenga010010
82OthersParoli100000
83OthersRubber Tree026100
84OthersSeora000121
85OthersSida12345321
86OthersTelikadam520000
87OthersTitachopa002215
88OthersVelkor000001
Total 8606 44151137 644366 307
Sub Total (No of Trees.) 15475


5. Working plan prescription for the forest land proposed for diversion : Working plan for Goalpara Forest Division is in preparatorty stage so no Working plan prescription for the forest land is available.
6. Brief note on vulnerability of the forest area to erosion : not prone to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Elephant, deer, snake, fox, etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : Elephant is prevalent in all RF of Goalpara district. they migrate from one RF to other RF crossing NH - 37. Expansion of NH 37 will directly impact the migration of Elephant from one RF to other RF. To mitigate this problem user agency shall construct sufficient no. of under passes for elephant movement at Elephant Corridors.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 446.54094
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
115.014Bogulamari PRFGoalpara Railway line near to the CA area, Chainage post 48/0, 48/1 and 48/3 are located near to the area. GPS Coordinates- 26° 08'44.0"N 90°35'38.8"E    View file
2239.678Bogulamari PRFGoalpara N 26.135 E 90.582    View file
3310.602Rakhyasini PRFGoalpara NH-37 near to the place. GPS Co-ordinates- 26° 06'7.0"N 90°34'7.0"E    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Goalpara18240036458190.57522381.1526/09/2021381.150
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
GoalparaC.F Central Assam CircleDFOYesOne23/08/2021
 C.F Central Assam CircleCFYesTwo01/10/2021,02/10/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
GoalparaC.F Central Assam CircleDFO RecommendedThe proposed 27.054 hectares area of forest land for Widening/ Up gradation of NH 37 from Bilasipara Chapar Tulungia Jogighopa Gendera Paikan Dudhnoi Guwahati Road Length 225.000 Km in the State of Assam under Bharatmala Parijojana LOT 1 PACKAGE 1A fall under Goalpara Forest Division T , Goalpara is recommended in view of importance of the development of the nation and especially Goalpara district in respect of improvement of communication/ transportation provided sufficient number of underpasses Elephant Corridor List enclosed will be constructed for smooth movement of elephant across the highway NH37. On implementation of the proposed project the entire area would be benefitted economically & socially. Further, the requirement of forest land proposed by the user agency is unavoidable and barest minimum required for the project.
C.F Central Assam CircleCF RecommendedRecommended since the projects is for widening of the existing road subject to fulfilment of conditions for elephant corridors etc.Yes
Nodal Officer RecommendedConsidering the importance in respect of improvement of communication/transportation in the region the proposal is hereby recommended subject to fulfill the conditions narrated in the Form A Part IV.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
AssamState SecretaryRecommended21/05/2022recommended and submitted the proposalState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional Office3-AS-C-100/2022/GHY16/12/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AS/ROAD/44439/2020ROAD44439202055777,906,907.0077,906,907.002023-02-16881340Union Bank Of IndiaNEFT/RTGS (Challan)2023-02-072023-02-13
FP/AS/ROAD/44439/2020ROAD44439202080723,050,500.0023,050,500.002023-05-20955065Union Bank Of IndiaNEFT/RTGS (Challan)2023-05-132023-05-20
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 55.294   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 3
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)5.014
  Status of CA Land so identified : Forest Area   Site Name : Bogulamari PRF   Location Details : Bogulamari PRF   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Bogulamari PRFOther Forest Land
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)39.678
  Status of CA Land so identified : Forest Area   Site Name : Bogulamari PRF   Location Details : Bogulamari PRF   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Bogulamari PRFOther Forest Land
  No. of patches : 3
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
3Block(Polygon)10.602
  Status of CA Land so identified : Forest Area   Site Name : Rakhyasini PRF   Location Details : Rakhyasini PRF   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Rakhyasini PRFOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AS/ROAD/44439/202001 Jun 2023No Dataverify
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AS/ROAD/44439/202008 Aug 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AS/ROAD/44439/2020Approved In-PrincipleNo Data