PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AS-01/2017
1. Location of the project/Scheme : Assam
 (i) State / Union Territory : Assam  (ii) District : Dima Hasao  (iii) Forest Division : Dima Hasao Forest West Division, Haflong  (iv) Area of forest land proposed for diversion (in ha.) : 10.583  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
NIL
Division 1. : Dima Hasao Forest West Division, Haflong
3. District wise area to be diverted in the division
S. No. DistrictArea(in ha.)
NIL
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)DensityEco-Class
NIL


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tectona GrandisTeak000644570
2Shorea RobustaSal000314430
3Michelia ChampakaTitachap0001470
4Morus LaevigataBhola000920
5Albizzia proceraKoroi000810
6Schima Wallichii ChoisMakrisal0001580
Total 0 00 1004118 0
Sub Total (No of Trees.) 1122


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : The gradient is gentle and not prone to soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 6
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Monkey, Wild Boars, Birds, Deer, Jackle, Cibet etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : The Borail Wildlife Sanctuary is located in the southern part of Assam in Cachar and Dima Hasao District and lies between 24°55?53??-25°05?52?? N latitude and 92°27?40??-93°04?30?? E longitude. The altitude ranging between 55–1000 m above mean sea level. It spreads over 326.24 km. It comprises of Cachar tropical moist evergreen and semi evergreen forests.There will be no significant adverse impact of project on the Eco-Sensitive Zone.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 13071929
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Topo Sheet 1:50,000
2 Geo reference Map of CA
3 Google Map
4 CA Scheme
5 Suitability Certficate
6 Tree enumeration List

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Dima Hasao489000425800108.574366.2001/03/2017217.140
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Dima Hasao Forest West Division, HaflongDima Hasao Circle(council) HaflongDFOYesTwo01/02/2017,07/02/2017
 Dima Hasao Circle(council) HaflongCFYesOne14/06/2017
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Dima Hasao Forest West Division, HaflongDima Hasao Circle(council) HaflongDFO RecommendedThe project is one of the stretch of the east west corridor. The sharp horizontal curves and steep gradient exist in the project stretch and these are required to improved as per NH standards. The area required for the project is the barest minimum.
Dima Hasao Circle(council) HaflongCF RecommendedRecommended Yes
Nodal Officer RecommendedRecommended
quetiapin ritalin quetiapin mod angst quetiapin wirkstoff
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
AssamState SecretaryRecommended15/06/2017 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional Office3-AS C 014/2017-SHI18/09/2017
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AS/ROAD/22913/2016ROAD2291320160853,647,948.003,647,948.0016/09/2021CNRB925868611217Union Bank Of IndiaNEFT/RTGS (Challan)08/09/202115/09/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 21   (iii). No. of Maintenance years: 7   (iv). Total No. of Patches/Parcel: 2
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)10
  Status of CA Land so identified : Forest Area   Site Name : Borail Reserve Forest   Location Details : Borail Reserve Forest   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Borail Reserve ForestRF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)11
  Status of CA Land so identified : Forest Area   Site Name : Diyungbra USF   Location Details : Diyungbra USF   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Diyungbra USFOther Forest Land
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AS/ROAD/22913/201603 Jun 2022No Dataverified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AS/ROAD/22913/201603 Jun 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/AS/ROAD/22913/201613 Jun 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AS/ROAD/22913/201628 Jun 2022APPROVED