PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AS-034/2022
1. Location of the project/Scheme : Assam
 (i) State / Union Territory : Assam  (ii) District : Kamrup  (iii) Forest Division : North Kamrup  (iv) Area of forest land proposed for diversion (in ha.) : 2.66  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1North Kamrup2.66Reserved Forest
Total 2.66
Division 1. : North Kamrup
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kamrup2.66
Total2.66
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.660.1Eco 1
Total. 2.66


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Shorea Robusta000000
Total 0 00 00 0
Sub Total (No of Trees.) 0


5. Working plan prescription for the forest land proposed for diversion : No
6. Brief note on vulnerability of the forest area to erosion : Vulnerability is Nil due to rocky surface
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : Yes
 (i). Details and comments on the impact of Project on such sites/establishments : There won’t be much impact of the project on the site.
 (ii). Copy of NOC from Competent Authority :
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1KamrupDakhin Mandakata5Daag No. 835
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 CA Suitability
2 Tree enumeration list
3 CA Scheme

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Kamrup4345005660.61424.3113875027/05/20227500
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
North KamrupC.F Central Assam CircleDFOYesOne27/05/2022
 C.F Central Assam CircleCFYesOne27/05/2022
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
North KamrupC.F Central Assam CircleDFO Recommended Public Work Road Department, Assam User Agency has submitted a Forest Diversion Proposal No.FP/AS/ROAD/154980/2022 for diversion of forest land under Forest Conservation Act.1980 measuring an area of 2.66 hectare for Construction of Trumpet Interchange at Gauripur Junction, North Guwahati at Sila Reserve Forest under North Kamrup Division, Rangia. The proposed diversion proposal will improve overall road connectivity of the region without causing major damage to the forest and environment provided mitigated measures are implemented by the user agency as per guideline.
C.F Central Assam CircleCF RecommendedPublic Work Road Department, Assam User Agency has submitted a Forest Diversion Proposal No.FP/AS/ROAD/154980/2022 for diversion of forest land under Forest Conservation Act.1980 measuring an area of 2.66 hectare for Construction of Trumpet Interchange at Gauripur Junction, North Guwahati at Sila Reserved Forest under North Kamrup Division, Rangia. The proposed diversion proposal will improve overall road connectivity of the region without causing damage to the forest and environment provided mitigatory measures are taken by the user agency. There is also a state protected small site under the Ancient Monuments & Record Act, 1959 on the forest land proposed to be diverted for the project. The user agency may consider change in its trumpet design, if feasible, to preserve the site in its current state or it may be safely shifted, if possible to do so, to a suitable location, with proper permission of the competent authority. The diversion of forest land which is the barest minimum required as above is recommended for acceptance.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
AssamState SecretaryRecommended07/06/2022RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional Office3-AS-B-108-2022 - GHY18/08/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AS/ROAD/154980/2022ROAD154980202286710,607,910.0010,607,910.0026/04/2023935113Union Bank Of IndiaNEFT/RTGS (Challan)03/04/202304/04/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 5   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)5
  Status of CA Land so identified : Non Forest Area   Site Name : CA Land KML File   Location Details : CA Land Location Map   Uploaded GPS File :   Uploaded Scanned copy of Map :   Whether land Mutated or not : No
Status of CA Land so identified
District Name. Name of Tehsil.
KamrupNorth Guwahati
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AS/ROAD/154980/202230 Nov 2023No DataVerify
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AS/ROAD/154980/202230 Nov 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/AS/ROAD/154980/2022Compliance report submitted16 Dec 2024
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AS/ROAD/154980/202219 Dec 2024APPROVED