PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AS-03/2014
1. Location of the project/Scheme : Assam
 (i) State / Union Territory : Assam  (ii) District : Kokrajhar,Dhubri,Bongaigaon  (iii) Forest Division : Parbatjhora,Dhubri,Aie Valley  (iv) Area of forest land proposed for diversion (in ha.) : 29.855  (v)

Category of the Proposal: Railway
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Dhubri 10.965Reserved Forest
2Dhubri 4.616Unclassed Forests
3Parbatjhora0.71Proposed Reserved Forest
4Aie Valley13.564Reserved Forest
Total 29.855
Division 1. : Aie Valley
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Bongaigaon13.564
Total13.564
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
113.5640.5Eco 1
Total. 13.564


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Shorea RobustaSal0168312622374
2Tectona GrandisTeak0115833611019537
3Melia AzadirachtaGharaneem04723000
4Bombax CeibaSimul001000
5Alstonia ScholarisSatiyana010000
6Terminalia BellaricaBohera003322
7Pongamia PinnataKoras003010
8Erythrina IndicaModar000010
9Lagerstroemia ParvifloraSida000010
10Aegle MarmelosWood-apple001210
11Alstonia ScholarisParuli000010
12Mangifera IndicaMango000021
13Anthocephalus CadambaKadam001000
14Dalburgia SisooSisoo050000
15Artocarpus HeterophyllusJack Fruit000031
16Schima Wallichii ChoisMakrisal000010
Total 0 28941630 138215 45
Sub Total (No of Trees.) 4922


5. Working plan prescription for the forest land proposed for diversion : yes
6. Brief note on vulnerability of the forest area to erosion : Yes
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.015
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : N/A
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 172.31300
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1115Bhairab PRFAbhayapuri Nil    View file
2215Bhairab PRFAbhayapuri Nil    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 NPV
Division 2. : Dhubri
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Dhubri15.581
Total15.581
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
110.9650.6Eco 1
24.6160.5Eco 1
Total. 15.581


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Artocarpus HeterophyllusKathal0373429121
2Pinus Griffithi MichellVelkor025310
3Bombax CeibaSimul045420
4Mangifera IndicaAmm03217730
5Gmelin ArboreaGamari074200
6Dalburgia SisooSissoo010100
7Terminalia ArjunaArjun010000
8Acacia ArabicaJam032100
9Albzzia Spp.Rain Tree011000
10Terminalia bellericaBohera001000
11Lagerstroemia ParvifloraAzar021001
12Azadirachta IndicaNeem096100
13Tectona GrandisTeak07123301100
14Shorea RobustaSal04021861122
15Anthocephalus CadambaKadam085210
Total 0 7270329 12231 4
Sub Total (No of Trees.) 7756


5. Working plan prescription for the forest land proposed for diversion : NO
6. Brief note on vulnerability of the forest area to erosion : There is no possibility of erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Existence of Wildlife is Nil
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : The distance from the Proposed Railway Project to Chakrasila Wild Life Sanctury is approx 6 KM .In between the Railway Project and the Chakrasila Wild Life Sanctury there are some Revenue Villages. Hence there will be no impact on the Wild Life from the proposed Railwaily Project.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 222.94084
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
113.2Sreegram Part-VISoalkocha NIl    View file
223.5Sreegram Part-VISoalkocha NIl    View file
331.3Sreegram Part-VISoalkocha NIl    View file
4416Sreegram RFSoalkocha NIl    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 NPV
Division 3. : Parbatjhora
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kokrajhar0.71
Total0.71
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.710.5Eco 1
Total. 0.71


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Shorea RobustaSal000009
2Gmelina ArboreaGamari000100
3Dalburgia SisooSisoo000300
4M.ChampacaTitasopa000100
5Artocarpus HeterophyllusKothal010000
6Azadirachta IndicaNeem013200
7Acacia CatechuKhair053000
8Samania SamanChiris000004
9Terminalia Tomentosachain010000
10Anthocephalus CadambaKadam011100
11Misc. SpeciesChama011000
12Misc. SpeciesSulsuli000010
13Misc. SpeciesRadhasura000100
Total 0 108 91 13
Sub Total (No of Trees.) 41


5. Working plan prescription for the forest land proposed for diversion : No working Plan Prescription for the Proposed Rese
6. Brief note on vulnerability of the forest area to erosion : No Vulnerability to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : The nesting site of endangered Vultures is present at about 100 meters from the proposed railway line.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
 (vi). Details and comments on the impact of Project on such species of Flora and Fauna: The movement of train would create noise pollution which may disturb the nesting of the vultures. The impact could be reduced by raising strip plantation with a width of 5-10 meter on both the sides of the proposed railway line
S.No. SpeciesSpecies Local Name
1The movement of train would create noise pollution which may disturb the nesting of the vultures. The impact could be reduced by raising strip plantation with a width of 5-10 meter on both the sides of the proposed railway line


9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 25.53
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111.42Mahamaya RFKhoraghar Nil    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Kokrajhar3169221960660015001/12/20141508
2Dhubri2838003564.748.50715001/01/20151500
3Bongaigaon1201901333959.50540001/05/20134000
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
ParbatjhoraWestern Assam Circle, KokrajharDFOYesOne25/12/2014
 Western Assam Circle, KokrajharCFYesOne05/04/2015
DhubriC.F Lower Assam Social Forestry Circle, DFOYesOne15/12/2014
Aie ValleyC.F Lower Assam Social Forestry Circle, DFOYesOne28/12/2014
 C.F Lower Assam Social Forestry Circle, CFYesOne16/02/2015
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DhubriC.F Lower Assam Social Forestry Circle, BongaigaonDFO RecommendedThe Diversion of Forest land for construction of New-Maynaguri-Jogighopa N.F.Railway Project is essentially an integral part for econimic development as well as better communication of the under developed Dhubri District of Assam and also will accelerate industrilization in the North-Eastern State. Since, it is National policy matter.Hence recommended for approval of this proposal.
Aie ValleyC.F Lower Assam Social Forestry Circle, BongaigaonDFO RecommendedThe Diversion of Forest land for construction of New-Maynaguri-Jogighopa N.F.Railway Project is essentially an integral part for economic development as well as for better communication of the under developed Bongaigaon and Dhubri District of Assam and also will accelerate industrilization in the North-Eastern State. Since, it is a National policy matter. hence recommended for approval of this proposal.
ParbatjhoraWestern Assam Circle, KokrajharDFO RecommendedThe construction of Railway line would benefit the public and is in the national interest. Therefore, the diversion proposal is recommended for acceptance
quetiapin ritalin quetiapin und valdoxan quetiapin wirkstoff
Western Assam Circle, KokrajharCF RecommendedThe proposed railway line is a necessity in this backward underdeveloped part of the state. The railway line would certainly boost the communication, employment opportunities and thereby improve the economic condition to the poor downtrodden people of this region. The construction of Railway line would benefit the public and is in the national interest. Therefore, the proposal for diversion of 0.71 ha under Rajapara PRF is recommended for acceptance.
quetiapin ritalin quetiapin und valdoxan quetiapin wirkstoff
Yes
C.F Lower Assam Social Forestry Circle, CF RecommendedThe Diversion of Forest land for construction of New-Maynaguri-Jogighopa N.F.Railway Project is essentially an integral part for economic development as well as for better communication of the under developed Bongaigaon and Dhubri District of Assam and also will accelerate industrilization in the North-Eastern State. Since, it is a National policy matter. hence recommended for approval of this proposal.Yes
Nodal Officer RecommendedThe project is of national importance as it will ease the transportation bottlenecks of the underdeveloped North East Region. Laying of the said railway line will not only facilitate cargo & passenger traffic through the inaccessible areas of Western Assam but will also act as an alternative route of transportation to Assam through West Bengal. It will promote trade, commerce & add to the general economic growth of the entire track. the area proposed for diversion is the barest minimum. The dive
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
AssamState SecretaryRecommended07/05/2015 Recommended by the State Govt. of Assam. State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional Office3 AS C 028/2015-SHI21/07/2015
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AS/RAIL/7657/2014Approved In-PrincipleNo Data