PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
AS-059/2021
1.
Location of the project/Scheme :
Assam
(i)
State / Union Territory :
Assam
(ii)
District :
Kamrup
(iii)
Forest Division :
Kamrup East
 (iv)
Area of forest land proposed for diversion (in ha.) :
4.7289
 (v)
Category of the Proposal:
Pipeline
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Kamrup East
4.7289
Reserved Forest
Total
4.7289
Division 1. : Kamrup East
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Kamrup
4.7289
Total
4.7289
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
4.7289
0.1
Eco 1
Total.
4.7289
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Shorea Robusta
Sal
6
2
4
0
0
0
2
Schima Wallichii Chois
Makri Sal
0
1
2
3
0
0
3
Cassia Fistula
Sonaru
0
3
0
0
0
0
4
Tooni Cedrela
Jia poma
0
1
2
0
0
0
5
Terminalia Bellarica
Bhomora
0
1
1
0
0
0
Total
6
8
9
3
0
0
Sub Total (No of Trees.)
26
5.
Working plan prescription for the forest land proposed for diversion :
The area is prescribed for Joint Forest Management circle
6.
Brief note on vulnerability of the forest area to erosion :
The proposed site is a hillock with gentle slope along the Assam Meghalaya border. The area is a forest area having a good top soil and does not have any erosion issues.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
No mammals have been reported. Birds and butterflies are seen.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
8112131
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
10
West Aprikola RF
Sonapur
10
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
NIL
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Kamrup
152800
46926.73
995.579
32
0
22/12/2021
231.502
18.27
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Kamrup East
C.F Central Assam Circle
DFO
Yes
One
18/12/2021
C.F Central Assam Circle
CF
Yes
One
22/12/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Kamrup East
C.F Central Assam Circle
DFO
Recommended
The allotted land is the best possible location as on date along the Assam Meghalaya boarder which has been proposed as Joint Forest Management Working Circle as per the Working Plan pescriptions
C.F Central Assam Circle
CF
Recommended
The construction of Gas Pipe Line through West Aprikola Reserve Forest would benefit the public and in the national interest.
Yes
Nodal Officer
Recommended
The construction of Gas Pipe Line through West Aprikola Reserve Forest would benefit the public and in the national interest.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Assam
State Secretary
Recommended
24/12/2021
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Guwahati
Regional Office
F.No.3- AS B 07 6 /2021-GHy
09/03/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/AS/Pipeline/48074/2020
PIPELINE480742020908
15,138,594.00
15,138,594.00
2022-05-13
SBIN422133423787
Union Bank Of India
NEFT/RTGS (Challan)
2022-04-30
2022-05-04
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
10
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
10
Status of CA Land so identified :
Forest Area
Site Name :
NIL
Location Details :
NIL
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
West Aprikola RF
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/AS/Pipeline/48074/2020
22 Aug 2022
No Data
verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/AS/Pipeline/48074/2020
22 Aug 2022
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/AS/Pipeline/48074/2020
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×