PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
AS-08/2021
1.
Location of the project/Scheme :
Assam
(i)
State / Union Territory :
Assam
(ii)
District :
Tinsukia
(iii)
Forest Division :
Digboi
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.915
 (v)
Category of the Proposal:
Optical Fibre Cable
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Digboi
0.915
Reserved Forest
Total
0.915
Division 1. : Digboi
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Tinsukia
0.915
Total
0.915
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.915
0.3
Eco 1
Total.
0.915
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
plantation and regeneration under draft working plan
6.
Brief note on vulnerability of the forest area to erosion :
as no rivers or major streams traverse the area, the area is not vulnerable to erosion.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
The area has various species including elephants,leopards,hoolock gibbon, etc
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
Yes
Details and comments on the impact of Project on such areas :
The proposed area is part of Dehing Patkai Elephant Reserve. As the project will have minimal impact on surface owing to horizontal directional drilling , no major impact is envisaged.
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
Yes
Details of Protected Area and comments on the impact of Project on the ESZ :
The proposed area is abour 2.52 kms away from proposed Dehing Patkai National Park at the closest.As the project will have minimal impact on surface owing to horizontal directional drilling , no major impact is envisaged.
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
Yes
Details and comments on the impact of Project on such areas :
The proposed area is abour 2.52 kms away from proposed Dehing Patkai National Park at the closest.As the project will have minimal impact on surface owing to horizontal directional drilling , no major impact is envisaged.
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
Yes
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
22.87904
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
2
Upper Dehing Reserved Forest West Block
Lakhipathar
125
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
additional documents submitted
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Tinsukia
379000
158257
164.89
56
330
31/03/2021
330
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Digboi
C.F. E.A.C, Jorhat
DFO
Yes
One
26/03/2021
C.F. E.A.C, Jorhat
CF
Yes
One
31/03/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Digboi
C.F. E.A.C, Jorhat
DFO
Recommended
Laying of Optical fibre cable is an essential work for development and no major damage is expected during the installation using horizontal drilling . Also , as the cable lies underneath the surface , no major impact is expected after installation.
C.F. E.A.C, Jorhat
CF
Recommended
The Reliance JIO Infocom Ltd. has submitted a proposal No.FP/AS/OFC/116541/2020 for diversion of Forest Land under section 2 of FC Act, 1980 0.915 hectare for the location of Digboi Duliajan Optical Rout Project in UDRF, West Block under Digboi Forest Division. The above proposal submitted by Reliance JIO Infocom Limited is recommended as proposaed by the user agency.
Yes
Nodal Officer
Recommended
The Reliance JIO Infocom Ltd. has submitted a proposal No.FP/AS/OFC/116541/2020 for diversion of Forest Land under section 2 of FC Act, 1980 0.915 hectare for the location of Digboi Duliajan Optical Rout Project in UDRF, West Block under Digboi Forest Division. The above proposal submitted by Reliance JIO Infocom Limited is recommended as proposaed by the user agency.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Assam
State Secretary
Recommended
20/01/2022
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Guwahati
State Government
FRS.2/2022
18/01/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/AS/OFC/116541/2020
OFC1165412020970
4,132,950.00
4,132,950.00
2022-05-13
AXISP00288129046
Union Bank Of India
NEFT/RTGS (Challan)
2022-04-30
2022-04-30
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
2
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
2
Status of CA Land so identified :
Forest Area
Site Name :
Upper Dehing Reserved Forest West Block, Lakhipathar
Location Details :
Upper Dehing Reserved Forest West Block, Lakhipathar
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Upper Dehing Reserved Forest West Block
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/AS/OFC/116541/2020
22 May 2024
No Data
Verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/AS/OFC/116541/2020
14 Jun 2024
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/AS/OFC/116541/2020
Forward
26 Jun 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/AS/OFC/116541/2020
16 Dec 2023
APPROVED
Print
Checklist for State Nodal Officer
×