PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AS-07/2020
1. Location of the project/Scheme : Assam
 (i) State / Union Territory : Assam  (ii) District : Tinsukia  (iii) Forest Division : Digboi  (iv) Area of forest land proposed for diversion (in ha.) : 2.696  (v)

Category of the Proposal: Mining
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Digboi2.696Reserved Forest
Total 2.696
Division 1. : Digboi
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Tinsukia2.696
Total2.696
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.3960.2Eco 1
21.30.7Eco 1
Total. 2.696


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Misc. Specieshengalu,bogori,paroli,hollock etc24044141617
Total 2 4044 1416 17
Sub Total (No of Trees.) 133


5. Working plan prescription for the forest land proposed for diversion : plantation and regeneration working circle under draft working plan
6. Brief note on vulnerability of the forest area to erosion : as no rivers or major streams traverse the area, the area is not vulnerable to erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 2.25
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : The area has various endangered species including elephants,leopards,hoolock gibbon,white winged wood duck etc
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : The proposed area is part of Dehing Patkai Elephant Reserve. Initial drilling may cause some disturbance for the animals , but no major adverse impact is expected unless a leakage or spillage occurs during operation.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : The site is located within ESZ of Dehing patkai wildlife sanctuary. Initial drilling may cause some disturbance for the animals , but no major adverse impact is expected unless a leakage or spillage occurs during operation.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : The proposed area is part of Dehing Patkai Elephant Reserve. Initial drilling may cause some disturbance for the animals , but no major adverse impact is expected unless a leakage or spillage occurs during operation.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 38.35844
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
116Upper Dehing Reserved Forest West BlockLakhipathar 114    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 site inspection report

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tinsukia379000158257164.895633010/10/20203300
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DigboiC.F. E.A.C, JorhatDFOYesTwo08/10/2020,10/10/2020
 C.F. E.A.C, JorhatCFYesOne11/10/2020
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DigboiC.F. E.A.C, JorhatDFO RecommendedThe proposed area had pre 1980 wells and the area was cleared accordingly. The new proposal will be for the same area and hence impact may not be high unless leakage or spillage occurs. S, considering the importance of this project for national economy and limited impact ,the project is recommended
C.F. E.A.C, JorhatCF RecommendedThe proposed area had wells and approach road . Considering the importance of this project for national economy and limited impact ,the project is recommended.Yes
Nodal Officer RecommendedRecommendation
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
AssamState SecretaryRecommended27/11/2020 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional Office3-AS-B-112-2020 - GHY28/07/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AS/MIN/23425/2017MIN23425201772512,354,844.0012,354,800.0012/03/2024SBINR52024031208235376Union Bank Of IndiaNEFT/RTGS (Challan)17/01/202430/01/2024
FP/AS/MIN/23425/2017MIN2342520179856,000,000.006,000,000.0021/05/2024SBIN324142444172Union Bank Of IndiaNEFT/RTGS (Challan)25/04/202404/05/2024
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 6   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)6
  Status of CA Land so identified : Forest Area   Site Name : Compartment No.114, Block No.1   Location Details : Lakhipathar Range, Digboi Forest diviison   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Upper Dehing Reserve ForestRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AS/MIN/23425/201723 Aug 2024No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AS/MIN/23425/201724 Aug 2024
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/AS/MIN/23425/2017Forwarded compliance report21 May 2025FP/AS/MIN/23425/2017Forwarded compliance report21 May 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AS/MIN/23425/2017Approved In-PrincipleNo Data