PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AS-05/2018
1. Location of the project/Scheme : Assam
 (i) State / Union Territory : Assam  (ii) District : Tinsukia  (iii) Forest Division : Doomdooma  (iv) Area of forest land proposed for diversion (in ha.) : 3.545  (v)

Category of the Proposal: Mining
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Doomdooma 3.545Reserved Forest
Total 3.545
Division 1. : Doomdooma
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Tinsukia3.545
Total3.545
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.54580Eco 2
Total. 3.545


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Bombax CeibaSimul000201
2Bischofia JavanicaUrium000400
3Albzzia Spp.Sirish000200
4Duabanga SonneratioidesKhokan000001
5OthersParoli000100
6OthersKecheru0001003
7OthersBowal001100
8OthersPoma000200
9OthersOwtenga001040
10OthersDimoru000535
11OthersAmora000700
12OthersModar000800
13OthersPichala000001
14OthersBhelkor000200
Total 0 02 447 11
Sub Total (No of Trees.) 64


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Does not arise
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.05
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : The diversion area of 3.545 ha. under Mesaki R.F (MKD) does not fall within any wildlife sanctuary and national park, Biosphere Reserve, Tiger Reserve, Elephant Corridor. However, drilling location is at 6.0 Km from Dibru-Saikhowa National Park.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 58.26271
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
118.0Mesaki R.F.Saikhowa Comptt. I    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tinsukia3790309042.94416.001/10/20106.00
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DoomdoomaC.F. E.A.C, JorhatDFOYesOne13/03/2018
 C.F. E.A.C, JorhatCFYesOne08/06/2018
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DoomdoomaC.F. E.A.C, JorhatDFO RecommendedOil India Ltd. is a public sector undertaking engaged in exploration, production and transportation of crude oil and natural gas. The drilling location site is selected after geological studies and interpretation of data obtained from seismic survey. There is indication of strong possibilities of presence of hydrocarbon in location MKD which falls in the forest area.Since the location site is scientifically determined based on geological and seismic data, it is not possible to change the site.
C.F. E.A.C, JorhatCF RecommendedOil India Ltd. is a public sector undertaking engaged in exploration, production and transportation of crude oil and natural gas. The drilling location site is selected after geological studies and interpretation of data obtained from seismic survey. There is indication of strong possibilities of presence of hydrocarbon in location MKD which falls in the forest area.Since the location site is scientifically determined based on geological and seismic data, it is not possible to change the site.Yes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
AssamState SecretaryRecommended28/01/2019Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional OfficeF. no. 3-AN B 036/2019-SHI18/03/2021
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AS/MIN/23089/2016MIN23089201652313,665,332.0013,665,332.0009/08/2021SBIN521221708959Union Bank Of IndiaNEFT/RTGS (Challan)15/07/202120/07/2021
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 8   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)8
  Status of CA Land so identified : Forest Area   Site Name : Mesaki Reserve Forest   Location Details : Georeferenced Map of CA area for MKD   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Doomdoma Forest DivisionRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AS/MIN/23089/201623 May 2022No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AS/MIN/23089/201624 May 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/AS/MIN/23089/201604 Jul 2022
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AS/MIN/23089/201618 Aug 2022APPROVED