PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AR-026/2022
1. Location of the project/Scheme : Arunachal Pradesh
 (i) State / Union Territory : Arunachal Pradesh  (ii) District : West Kameng,Tawang  (iii) Forest Division : Bomdila Forest Division,Bomdila,Tawang SF Division. Tawang  (iv) Area of forest land proposed for diversion (in ha.) : 137.315  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Bomdila Forest Division,Bomdila58.987Unclassed Forests
2Tawang SF Division. Tawang78.328Unclassed Forests
Total 137.315
Division 1. : Bomdila Forest Division,Bomdila
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1West Kameng58.987
Total58.987
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
158.9870.3Eco 5
Total. 58.987


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Pinus Griffithi MichellChirpine0400010040
2PineBlue Pine0455019030
3Albzzia Spp.Oak0009800
Total 0 8550 3887 0
Sub Total (No of Trees.) 1250


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : The area proposed for diversion is not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.25
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Red Vented bulbul, Black bulbul, Black drongo, Blue whistling laughing
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 45451000
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1158.987otherDirang Forest Range, Dirang58.987    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Hard Copy all submitted
Division 2. : Tawang SF Division. Tawang
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Tawang78.328
Total78.328
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
178.3283Eco 6
Total. 78.328


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1OthersKetcheng80237125211
2OthersRo-Sheng39043342
3RhododendronWoodong Sheng11000000
4OthersUnknown136024400
5OthersPa-Sheng80177715129
6OthersShukpa Sheng02110000
7Alnus NepalensisMju Sheng1450150000
8OthersYang-Sheng01403000
Total 590 425295 7718 22
Sub Total (No of Trees.) 1427


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Minimum Effect
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 55391126
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
11156.66RFTawang SF Range, Tawang1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Tawang208512302035.208109.18925/07/20222117.20
2West Kameng74221057.82511111057.82512/04/202258.98749.272
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Bomdila Forest Division,BomdilaWestern Arunachal Circle,BANDERDEDEWADFOYesOne07/11/2022
Tawang SF Division. TawangWestern Arunachal Circle,BANDERDEDEWADFOYesOne07/11/2022
 Western Arunachal Circle,BANDERDEDEWACFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Bomdila Forest Division,BomdilaWestern Arunachal Circle,BANDERDEDEWADFO RecommendedRecommended
Tawang SF Division. TawangWestern Arunachal Circle,BANDERDEDEWADFO RecommendedRecommended
Western Arunachal Circle,BANDERDEDEWACF RecommendedRecommendedYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Arunachal PradeshState SecretaryRecommended07/11/2022RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
GuwahatiRegional Office3-AN-A-142/2022/GHY14/03/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AR/TRANS/152572/2022TRANS1525722022237248,804,679.0048,804,679.0029/03/2023915696Union Bank Of IndiaNEFT/RTGS (Challan)25/03/202325/03/2023
FP/AR/TRANS/152572/2022TRANS1525722022237248,804,679.00100,000,000.0029/03/2023915697Union Bank Of IndiaNEFT/RTGS (Challan)25/03/202325/03/2023
FP/AR/TRANS/152572/2022TRANS1525722022237248,804,679.00100,000,000.0029/03/2023915698Union Bank Of IndiaNEFT/RTGS (Challan)25/03/202325/03/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 274.63   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 2
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)156.66
  Status of CA Land so identified : Forest Area   Site Name : KAMLE RF   Location Details : KAMLE RF   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
HAPOLI FOREST DIVISIONRF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)117.97
  Status of CA Land so identified : Forest Area   Site Name : RUPA VFR   Location Details : RUPA VFR   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
BOMDILA FDPF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AR/TRANS/152572/202205 Oct 2023No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AR/TRANS/152572/202205 Oct 2023
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/AR/TRANS/152572/2022Compliance report09 Oct 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AR/TRANS/152572/202213 Oct 2023APPROVED