PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AP-017/2017
1. Location of the project/Scheme : Andhra Pradesh
 (i) State / Union Territory : Andhra Pradesh  (ii) District : Nellore,Kadapa  (iii) Forest Division : Nellore,Proddatur (WL)  (iv) Area of forest land proposed for diversion (in ha.) : 74.486  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Nellore17.722Reserved Forest
2Proddatur (WL)3.178Protected Forest
3Proddatur (WL)2.68Revenue Forest
4Proddatur (WL)50.906Section 16
Total 74.486
Division 1. : Nellore
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Nellore17.722
Total17.722
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
117.7220.6Eco 6
Total. 17.722


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Hardwickia BinnataNara Yepi060000
2Wrigtria TingtoriaPala081110
3Dalbergia LatifoliaZitregi010010
4Pterocarpus MarsupiumEgisa0440000
5Albezzia AmaraChigara020000
6Zizyphus XylopyrusGotika0650000
7Cassia FistulaRela0250000
8Red SandersRed Sanders0124027200
9Albezzia AmaraChigara020000
10Pterocarpus MarsupiumEgisa110440000
11Casurina EquisitifoliaGali100000
12Zizyphus XylopyrusGotika568650000
13Shorea RobustaGuggilam81361411110
14Moringa OliferaJana1267360000
15Sepandus EmerginatusKunkudu791100
16Terminalia ArjunaMaddi203371200
17Aegle MarmelosMaredu570000
18Ficus BengalensisMarri000120
19NeeruddiDolichandronecrispa6771891000
20Nemali NaaraHelecteres isora110000
21Syzigium CuminiNaredu212000
22Wrigtria TingtoriaPalabarika 90381000
23Grewia TiliaefoliaPeddajana 630000
24Zizyphus JujubaRagi010000
25SandraMimosa Prainlana262180000
26Albezzia AmaraShekrane730000
27Somisoymida febrifuga14121000
28Tectona GrandisTeak1110000
29ThadaPterospermum xylocarpum39142000
30Diasporus MelanoxylonTOOKI3750000
31Usiriphyllanthus emblica357351000
32Hardwickia BinnataYepi1308311300
33Misc. Speciesothers02259601330
Total 4607 4868120 248 0
Sub Total (No of Trees.) 9627


5. Working plan prescription for the forest land proposed for diversion : 17.722
6. Brief note on vulnerability of the forest area to erosion : The proposed area is having gentle slope and there is possibility to soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Yes
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data

Additional information Details
S. No. DocumentsRemarks
1
2
3 uploaded the trees list in the website as per the abtract
4
5
6
Division 2. : Proddatur (WL)
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Kadapa56.764
Total56.764
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
150.9060.4Eco 3
23.1780.3Eco 3
32.680.3Eco 3
Total. 56.764


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1BattagenupuBattagenapu0200000
2BilluduBilludu042833200
3BoorugaBooruga010000
4Lagerstroemia ParvifloraChennangi010000
5Albezzia AmaraChikireni079210
6ChindugaChinduga0253000
7Pterocarpus MarsupiumYegisa0852000
8Terminalia ArjunaInumaddi01633001
9IppaIppa0500000
10EucalyptusEucalyptus010016000
11Gummadi TeakGummadi Teak040000
12Ziayphus xylopyraGottika078316200
13Shorea RobustaGuggilam0275000
14Moringa oleiferaJana040517001
15Ficus TomentosaJivvi000100
16Pongamia PinnataKanuga0201310
17KunkuduKunkudu060000
18Terminalia ArjunaMaddi01392000
19Ficus BengalensisMarri020000
20Nalla MaddiNallamaddi0260000
21Azadirachta IndicaVepa0393120
22Acacia NiloticaNallthumma0130000
23Hardwickia BinnataNarayepi03411100
24NeeroddiNeeruddi032214111
25Holoptelia integrifoliaNemalinara000010
26Syzigium CuminiNeredu0171000
27Wrigtria TingtoriaPala0522210
28Grewia TiliaefoliaPeddajana040000
29Red SandersRedsanders0191888700
30Zizyphus JujubaRaavi010000
31Cassia FistulaRela0572000
32Adina cordifoliaRudraganepa020000
33SandraSandra01297000
34Sara pappuSara01374000
35Albezzia AmaraChikireni050000
36SomiSomi02928200
37ThapasiThapasi020000
38TeakTeak010000
39Acacia leucophloeaTella Thumma0130000
40ThadaThada072210
41Diasporus MelanoxylonTooki070000
42UsiriUsiri0550000
43VelagaVelaga010000
44Hardwickia BinnataYepi0253571322
45Misc. SpeciesMisc. species0370125651126
Total 0 9354562 9022 11
Sub Total (No of Trees.) 10039


5. Working plan prescription for the forest land proposed for diversion : As per the working plan, the proposed diverted area falls under southern tropical dry deciduous forests with density varying 0.2 to 0.5
6. Brief note on vulnerability of the forest area to erosion : Light erosion at the points of towers to be erected on the hilly terrain and rest is negligible
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Bear, wild boar, Hare, Jungle sheep, Jungle fowl and Spotted deer
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : Sag lines of the power project are about 15.5 mts. above the ground, there is negligible Impact on the forest areas.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : Sag lines of the power project are about 15.5 mts. above the ground, there is negligible Impact on the forest areas.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : Sag lines of the power project are about 15.5 mts. above the ground, there is negligible Impact on the forest areas.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 1430.393
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1120.48K. K. Dasaripalli RFPorumamilla201    View file
2220.88Kavalakuntla RFPorumamilla245    View file
3321.03Kavalakuntla south RFPorumamilla254    View file
4421.75Kalasapadu RFPorumamilla230    View file
5520.36Sancherla RFPorumamilla237    View file
6720.31Kamalapuram Block - I RFProddatur73    View file
7630.12Bhanukotamala RFMuddanur27    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2
3
4
5
6
7
8
9
10
11
12
13

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Nellore1307600279138.514755.31301041.9925/11/20171036.9972.6025
2Kadapa15359005002951468.10919263.31931/12/2017259.624099.739
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
NelloreGunturDFOYesOne12/11/2017
Proddatur (WL)KurnoolDFOYesTwo11/11/2017,20/11/2017
 KurnoolCFYesOne25/01/2018
 GunturCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
NelloreGunturDFO RecommendedThis is a bonefied public project. Hence recommended
Proddatur (WL)KurnoolDFO RecommendedIt is recommended to consider the proposals in the interest of public as the minimum possible option for diversion of 56.764 ha in the above said locations for construction of 765 KV Double Circuit Power Transmission line
KurnoolCF RecommendedYes, RecommendedYes
GunturCF RecommendedRecommendedYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Andhra PradeshState SecretaryRecommended24/03/2018Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
VijayawadaRegional Office4-APA056/2018-CHN05/04/2018
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AP/TRANS/26388/2017TRANS263882017843180,573,066.0050,000,000.002018-04-27HDFCH18117898151Corporation BankNEFT/RTGS (Challan)2018-04-252018-04-25
FP/AP/TRANS/26388/2017TRANS263882017843180,573,066.0050,000,000.002018-04-27HDFCH18117898160Corporation BankNEFT/RTGS (Challan)2018-04-252018-04-25
FP/AP/TRANS/26388/2017TRANS263882017843180,573,066.0050,000,000.002018-04-27HDFCH18117886694Corporation BankNEFT/RTGS (Challan)2018-04-252018-04-25
FP/AP/TRANS/26388/2017TRANS263882017843180,573,066.0030,573,066.002018-04-27HDFCH18117898130Corporation BankNEFT/RTGS (Challan)2018-04-252018-04-25
FP/AP/TRANS/26388/2017TRANS26388201765017,005,300.0017,005,300.002018-05-05HDFCR52018050576803978Corporation BankNEFT/RTGS (Challan)2018-05-042018-05-04
FP/AP/TRANS/26388/2017TRANS26388201759135,660,400.0035,660,400.002018-10-26N299180663972869Corporation BankNEFT/RTGS (Challan)2018-10-222018-10-26
FP/AP/TRANS/26388/2017TRANS26388201771989,113,800.0050,000,000.002018-11-03N307180671094412Corporation BankNEFT/RTGS (Challan)2018-10-312018-11-02
FP/AP/TRANS/26388/2017TRANS26388201771989,113,800.0039,113,800.002018-11-03N307180671092467Corporation BankNEFT/RTGS (Challan)2018-10-312018-11-02
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 154.93   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 7
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)20.48
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
KK Dasaripalli RFRF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)20.88
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kavalakuntla RFRF
  No. of patches : 3
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
3Block(Polygon)21.03
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kavalakuntla south RFRF
  No. of patches : 4
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
4Block(Polygon)21.75
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kalasapadu RFRF
  No. of patches : 5
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
5Block(Polygon)20.36
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Sancherla RFRF
  No. of patches : 6
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
6Block(Polygon)30.12
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Bhanukotamala RFRF
  No. of patches : 7
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
7Block(Polygon)20.31
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : NIL   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Kamalapuram Block - I RFRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AP/TRANS/26388/201727 Feb 2020No DataNot applicable
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AP/TRANS/26388/201728 Feb 2020
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/AP/TRANS/26388/2017Compliance forwarded28 Feb 2020
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AP/TRANS/26388/201703 Feb 2021APPROVED