PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
AP-059/2017
1.
Location of the project/Scheme :
Andhra Pradesh
(i)
State / Union Territory :
Andhra Pradesh
(ii)
District :
Prakasam
(iii)
Forest Division :
Giddalur
 (iv)
Area of forest land proposed for diversion (in ha.) :
9.33
 (v)
Category of the Proposal:
Road
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Giddalur
9.33
Reserved Forest
Total
9.33
Division 1. : Giddalur
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Prakasam
9.33
Total
9.33
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
9.33
0.4
Eco 3
Total.
9.33
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Albezzia Amara
Chikireni
0
0
0
0
0
0
2
Others
Others
0
0
0
0
0
0
Total
0
0
0
0
0
0
Sub Total (No of Trees.)
0
5.
Working plan prescription for the forest land proposed for diversion :
The Forest land is notified u/s 15 vide gazettee No.755, Dt.06.10.1977 as Botlagudur RF, Gazettee No.840, Dt.24.04.1969 as Bodawada RF and Gazettee No.1495, Dt.23.07.1968 as Malakonda RF (u/s 4)
6.
Brief note on vulnerability of the forest area to erosion :
There is no impact of proposed project on the ecology, especially soil erosion in and around the proposed area
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Nil
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
310.000
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
18.66
Nandanavanam A Extension
Kanigiri
518
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
1
RoFR Act Certificate
2
Enumeration list
3
Part II
4
CA Topo
5
DFO Recommendation
6
DFO Site inspection Report
7
DFO site inspection Photos
8
CA land Geo reference
9
NPV report
10
Diversion land Authentication Map
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Prakasam
1040800
213197.238
1251.868
13
506.062
30/06/2018
506.062
2296.3495
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Giddalur
Guntur
DFO
Yes
One
24/05/2018
Guntur
CF
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Giddalur
Guntur
DFO
Recommended
It is submitted that the proposed Up gradation of NH 167 B Road from CS Puram to Singarayakonda results in Congestion and delay to both through as well as local traffic and in order to handle the increase in traffic, except widening of existing road, there is no any other alternative and this road after completion would further improve connectivity in terms of achieving smooth and safe traffic flow and improve level of service. In addition to the above, substantial economic gain in terms of reduced Vehicle operating cost VOC and reduced travel time will be achieved.
Guntur
CF
Recommended
Recommended
Yes
Nodal Officer
Recommended
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Andhra Pradesh
State Secretary
Recommended
07/07/2021
Recommended
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Vijayawada
Regional Office
4-APC129/2021-VIJ
30/03/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/AP/ROAD/29874/2017
ROAD298742017005
61,099,200.00
40,000,000.00
2023-02-27
890655
Union Bank Of India
NEFT/RTGS (Challan)
2022-12-05
2023-02-20
FP/AP/ROAD/29874/2017
ROAD298742017005
61,099,200.00
21,098,200.00
2023-02-27
890656
Union Bank Of India
NEFT/RTGS (Challan)
2022-12-05
2023-02-20
FP/AP/ROAD/29874/2017
ROAD298742017005
61,099,200.00
1,000.00
2023-02-28
891377
Union Bank Of India
NEFT/RTGS (Challan)
2022-12-05
2023-02-20
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
24.72
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
24.72
Status of CA Land so identified :
Forest Area
Site Name :
Nandanavanam A Extension RF Compt No.518
Location Details :
Nandanavanam A Extension RF Compt No.518
Uploaded GPS File :
Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest.
Legal Status of Forest Land
Nandanavanam A Extension RF
RF
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/AP/ROAD/29874/2017
21 Feb 2024
No Data
Verified
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/AP/ROAD/29874/2017
09 May 2024
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/AP/ROAD/29874/2017
Approved In-Principle
No Data