PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AP-016/2017
1. Location of the project/Scheme : Andhra Pradesh
 (i) State / Union Territory : Andhra Pradesh  (ii) District : Cuddapah  (iii) Forest Division : Proddatur (WL)  (iv) Area of forest land proposed for diversion (in ha.) : 2.55  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Proddatur (WL)2.55Reserved Forest
Total 2.55
Division 1. : Proddatur (WL)
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Cuddapah2.55
Total2.55
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.550.4Eco 3
Total. 2.55


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL
5. Working plan prescription for the forest land proposed for diversion : As per the working plan the proposed diversion area i.e. Compt. No. 322 & 323 of Ramapuram and Valleruvaripalli Beats, Badvel Range is proposed under Degraded Forest Working Circle and Red Sander Improvement Working Circle. The proposed area of diversion falls under Southern Tropical Dry Deciduous Forests and sub type is Dry Mixed Deciduous Forests with density 0.4 by comprising Chloroxylon swetenia, Bauhinia purpurea, Turnera ulmifolia, Zyzyphus harridan, Hardwickia binata, Acasia Sandra, Anagesious latifolia etc. species including thorny bushes. The area is plain, undulating and hilly terrain. The soil is Red soil clubbed with boulders and rocky out crop. The existing forest is scrub type of forest. There are no endangered, rare and unique species of flora and fauna and no defence establishments or any other important monuments.
6. Brief note on vulnerability of the forest area to erosion : Erosion to a certain degree is anticipated due to formation of road, but control measures are to be taken up by the user agency
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Wild boar, Bear, Peacock, Wolf, Hare and Deer
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : Penusila Narasimha Sanctuary was notified under section 18 of Wild Life Protection Act 1972 vide G. O. Ms. No. 106 EFS & T-For-III, Dept. Dt..15-09-1997. 1997 with an extent of 1030.85 Sq. Kms in Kadapa and Nellore Districts. There is no impact on flora and fauna because of the project.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): Paved shoulders to width 5 mt either side of road
   (b) Period of Work done(year) : 0.5
   (c) Area of forest land involved in violation (in ha.) : 2.00
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1Executive Engineer NH Division KadapaExecutive Engineer R and B NH Division KadapaNotices issued to the user agency
12. Whether work in violation is still in progres(Yes/No) : No
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 81.877
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
115.42Kamalapuram Block - III RFProddatur75    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2
3 Additional Point wise information called by MoEF, RO, Chennai Dt. 01-03-2018
4
5
6

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Cuddapah15359005002951468.10919263.31905/09/2017225.3151992.879
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Proddatur (WL)KurnoolDFOYesOne29/08/2017
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Proddatur (WL)KurnoolDFO RecommendedThe proposed paved shoulders to a width of 5.00 mts on either sides of existing road will not have any impact on the flora and fauna. However the Badvel – Nellore BT Road is already existing and makes no difference. There is no impact of the project on the adjoining forests. There is negligible destruction / damage or diversion of the habitat for flora and fauna by this project.
KurnoolCF RecommendedRecommendedYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Andhra PradeshState SecretaryRecommended06/11/2017Recommended State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
VijayawadaRegional Office4-APB050/2017-CHN06/09/2018
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/AP/ROAD/26324/2017ROAD26324201792415,888,400.0015,888,400.002019-04-15P19041528640654Corporation BankNEFT/RTGS (Challan)2018-10-192019-03-23
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details) : No
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/AP/ROAD/26324/201716 Dec 2020No DataVerified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/AP/ROAD/26324/201717 Dec 2020
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/AP/ROAD/26324/2017Compliance Report Submitted25 Jun 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/AP/ROAD/26324/201702 Jul 2021APPROVED