PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : AP-076/2018
1. Location of the project/Scheme : Andhra Pradesh
 (i) State / Union Territory : Andhra Pradesh  (ii) District : Nellore,Chittoor  (iii) Forest Division : Nellore,WL Chittoor East  (iv) Area of forest land proposed for diversion (in ha.) : 20.72  (v)

Category of the Proposal: Irrigation
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Nellore12.64Reserved Forest
2WL Chittoor East8.08Reserved Forest
Total 20.72
Division 1. : Nellore
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Nellore12.64
Total12.64
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
112.640.3Eco 4
Total. 12.64


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Azadirachta IndicaNeem31314100
2OthersBikki010000
3OthersEetha010000
4Eucalyptus (Seed Orgin)Eucalyptus110000
5Pongamia PinnataKanuga110000
6Hardwickia BinnataNarayepi660000
7OthersOoty220000
8OthersPala32331000
9Acacia leucophloeaTellatumma352000
10Borasis FlebiliferThati060000
11OthersVaamu16160000
12OthersAari12120000
13OthersBeera770000
14Albizia ProceraCheekereni440000
15OthersGotti18180000
16OthersJuvvi000010
17Pongamia PinnataKanuga110000
18OthersKoya220000
19OthersLokki001010
20Terminalia ArjunaMaddi110000
21Butea MonospermaModuga220000
22OthersMusti27270000
23Acacia NiloticaNallatumma661000
24OthersOoty220000
25OthersRegi110000
26OthersUlindra991000
Total 184 19510 12 0
Sub Total (No of Trees.) 392

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Not vulnerable to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Wild boar,sambar,spotted deer,Rabit,Reptiles and Bird Species
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1ChittoorKaigal21.213Sy.no.107,109
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Field inspection
2 no violation
3 no wildlife
4 no erosion
5 Part-II
6 No arcehological
7 Bare Minimum
8 Forest land breakup
9 No rare and endangered flora fauna
Division 2. : WL Chittoor East
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Chittoor8.08
Total8.08
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
18.080.2Eco 6
Total. 8.08


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-2 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

(iv) Species-wise local/scientific names and girth-wise enumeration of trees at FRL-4 meter
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
NIL

5. Working plan prescription for the forest land proposed for diversion : The proposed Forest land for diversion is falling in the Protection Working Circle.
6. Brief note on vulnerability of the forest area to erosion : There will NO impact of project on the soil erosion in proposed area
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No endamic Wildlife are present in the proposed diversion area
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): The user agency has already excavated the Somasila
   (b) Period of Work done(year) : 2
   (c) Area of forest land involved in violation (in ha.) : 8.08
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1Ms Progressive Construction Limited Military Colony Near Water Tank Durgamitta Nellore and The EE SSLC SB Division Kothur Nellore Ms Progressive Construction Limited Military Colony Near Water Tank Durgamitta Nellore and The EE SSLC SB Division Kothur Nellore A case is being booked against the violetars of Forest Conservation Act
12. Whether work in violation is still in progres(Yes/No) : No
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1ChittoorKaigal21.213Sy.no.107,109
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Additional information Details
S. No. DocumentsRemarks
1 Cost of benefit analysis
2 Assessment of NPV
3 CA DGPS map
4 CA land location map
5 CA Scheme
6 FIN of CA land
7 Report on violation
8 Soil suitability of CA land
9 Topo map
10 topo map of diversion land
11 DGPS map of diversion land
12 DFO Certificate
13 Enumeration list
14 Part II
15 Field Inspection note of DFO
16 RoFR
17 Administrative sanction
18 CA land certificate
19 Section map
20 user agency certificate

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Nellore1307600279138.514756.31381031.2402/10/20181031.247260.46
2Chittoor1515200452167804.8618506.9230/09/2018577.38509.01
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
NelloreGunturDFOYesOne02/10/2018
WL Chittoor EastWLM - TirupathiDFOYesOne06/10/2018
 WLM - TirupathiCFYesOne26/10/2018
 GunturCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
NelloreGunturDFO RecommendedSince the diversion is required for irrigation purpose, the same is recommended
WL Chittoor EastWLM - TirupathiDFO RecommendedRecommended
WLM - TirupathiCF RecommendedRecommended Yes
GunturCF RecommendedRecommendedYes
Nodal Officer RecommendedRecommended
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Andhra PradeshState SecretaryRecommended24/12/2018 Recommended State Govt. OfficerNo Data