Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received at RO/HO(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
1
|
Orissa
|
FP/OR/Others/145284/2021
|
|
MAYFAIR Hotels & Resorts Limited
|
Others
|
MAYFAIR HOTELS & RESORTS LIMITED
|
1.216
|
Pending at RO
|
08-Nov-2023
|
19-Nov-2024
|
|
|
|
|
No
|
2
|
Orissa
|
FP/OR/Others/145394/2021
|
|
MAYFAIR Hotels & Resorts Limited
|
Others
|
MAYFAIR HOTELS & RESORTS LIMITED
|
2.832
|
Pending at RO
|
06-Nov-2023
|
19-Nov-2024
|
|
|
|
|
No
|
3
|
Orissa
|
FP/OR/MIN/16453/2015
|
|
Kalarangiatta Chromite Mines of M/s Ferro Alloys Corporation Ltd
|
Mining
|
FERRO ALLOYS CORPORATION LTD
|
23.8
|
Pending at RO
|
28-Jul-2016
|
24-Oct-2024
|
|
|
|
|
EC File NA
|
4
|
Orissa
|
FP/OR/Pipeline/148595/2021
|
5-ORB557/2023-BHU
|
Dhamra - Haldia Pipeline Project (Odisha)
|
Pipeline
|
GAIL (INDIA) LIMITED (DHPL-OD)
|
1.849
|
Pending at RO
|
16-Mar-2023
|
19-Oct-2024
|
|
|
|
|
No
|
5
|
Orissa
|
FP/OR/ROAD/141584/2021
|
5-ORC603/2023-BHU
|
CONSTRUCTION OF BALANGIR NH BY PASS ROAD
|
Road
|
NH, BALANGIR DIVISION
|
6.56
|
Pending at RO
|
21-Sep-2023
|
20-Aug-2024
|
|
|
|
|
No
|
6
|
Orissa
|
FP/OR/TRANS/151200/2022
|
5-ORC636/2024-BHU
|
Construction of 132/33KV transmission line from Grid Sub-Station, Boudh to proposed 220/132/33KV Grid Sub-Station at Kiakata, under Athmallik and Boudh Forest Division under EHTC, Division OPTCL, Angul
|
Transmission Line
|
E.H.T. (C) DIVISION OPTCL ANUGUL
|
5.127
|
Pending at RO
|
12-Mar-2024
|
21-May-2024
|
|
|
|
|
No
|
7
|
Orissa
|
FP/OR/TRANS/149711/2021
|
5-ORC592/2023-BHU
|
: Construction of 132 KV DC Line on DC Tower from existing 132/33 KV Phulbani, Kandhamal district Grid Sub-Station to 132/33 KV Grid Sub-Station at Boudh, Boudh district.
|
Transmission Line
|
E.H.T. (C) DIVISION OPTCL ANUGUL
|
30.469
|
IN-PRINCIPLE
|
18-Aug-2023
|
12-Mar-2024
|
|
|
|
|
No
|
8
|
Orissa
|
FP/OR/TRANS/50828/2020
|
5-ORA487/2021-BHU
|
220 kV LILO Transmission Line from Existing LoC No. 70 of 220 KvMalkangiri – Balimela Transmission Line to 220/ 33 kV Grid Sub - Station, Khairput, Govindapalli of OPTCL in Malkangiri District, Odisha
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
48.782
|
IN-PRINCIPLE
|
03-Dec-2021
|
27-Feb-2024
|
|
|
|
|
No
|
9
|
Orissa
|
FP/OR/RAIL/154542/2022
|
5-ORC618/2023-BHU
|
Bhalumaska to Singapur Road Doubling Railway Project From Km. 128.95 to 163.725
|
Railway
|
DYCE2CONECOR@WAT.RAILNET.GOV.IN
|
33.152
|
IN-PRINCIPLE
|
25-Nov-2023
|
25-Jan-2024
|
|
|
|
|
No
|
10
|
Orissa
|
FP/OR/RAIL/153463/2022
|
5-ORC617/2023-BHU
|
Koraput to Singaram Doubling Railway Project. from Km- 0.000 to Km- 74.800
|
Railway
|
DYCE2CONECOR@WAT.RAILNET.GOV.IN
|
5.117
|
IN-PRINCIPLE
|
20-Nov-2023
|
25-Jan-2024
|
|
|
|
|
No
|
11
|
Orissa
|
FP/OR/Others/7344/2014
|
5-ORC629/2024-BHU
|
Proposal for Diversion of Forest Land over 11.371 Ha required for construction of Balangir By-Pass Road under Balangir R & B Division
|
Others
|
WORKS DEPARTMENT
|
11.371
|
IN-PRINCIPLE
|
20-Jan-2024
|
20-Jan-2024
|
|
|
|
|
No
|
12
|
Orissa
|
FP/OR/RAIL/156513/2022
|
5-ORA626/2024-BHU
|
Jeypore- Malkangiri New BG Line,East Coast Railway.
|
Railway
|
EAST COAST RAILWAY
|
452.705
|
IN-PRINCIPLE
|
08-Jan-2024
|
08-Jan-2024
|
|
|
|
|
No
|
13
|
Orissa
|
FP/OR/TRANS/153797/2022
|
5-ORC576/2023-BHU
|
2X160 MVA ,220/132 KV & 2X20 MVA, 220/33KV Grid Substation with associated 220 KV DC line from 400/200 KV PGCIL Grid Substation, Keonjhar to Turumunga & 132 KV LILO line from 132 KV Polaspanga-Karanjia SC line to Turumunga, Keonjhar
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
8.435
|
IN-PRINCIPLE
|
29-May-2023
|
09-Nov-2023
|
|
|
|
|
No
|
14
|
Orissa
|
FP/OR/IND/145106/2021
|
5-ORC581/2023-BHU
|
Establishment of Industries i.e. Expansion and modernization of Existing integrated Steel Plant by M/s GM Iron and Steel Company Limited
|
Industry
|
IDCO
|
11.853
|
IN-PRINCIPLE
|
17-Jun-2023
|
10-Oct-2023
|
|
|
|
|
Yes
Proposal No.: IA/OR/IND/183272/2020
EC File No.: J-11011/286/2020-IA.II(I)
Proposal Status: TOR GRANTED
|
15
|
Orissa
|
FP/OR/ROAD/148087/2021
|
5-ORC597/2023-BHU
|
Rehabilitation and Upgradation to Four laning of 7.6 km stretch (km 229.00 to km 236.600) inside buffer zone of Similipal Tiger Reserve of Baharagora to Singhara Section (km 199.200 to km 310.806) of NH-6 in the State of Odisha under NHDP Phase- IV, on EPC mode
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BALASORE
|
32.225
|
IN-PRINCIPLE
|
12-Sep-2023
|
12-Sep-2023
|
|
|
|
|
No
|
16
|
Orissa
|
FP/OR/MIN/155017/2022
|
8-18/2002-FC Vol
|
BHUBANESWARI OCP
|
Mining
|
BHUBANESWARI OC EXPANSION MAHANADI COALFIELDS LIMITED
|
20.383
|
IN-PRINCIPLE
|
N/A
|
27-Apr-2023
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
17
|
Orissa
|
FP/OR/MIN/10329/2015
|
5-ORC544/2023-BHU
|
Kalta Iron Mines (ML-139)
|
Mining
|
SAIL, Rourkela Steel Plant, Kalta Iron Mine
|
25.981
|
Rejected By ROHQ
|
05-Jan-2023
|
03-Apr-2023
|
|
|
|
|
Yes
Proposal No.: IA/OR/MIN/72371/2018
EC File No.: IA-J-11015/21/2018-IA-II(M)
Proposal Status: Delisted
|
18
|
Orissa
|
FP/OR/TRANS/150350/2021
|
5-ORC546/2023-BHU
|
Construction of 132 KV D/C Transmission line from existing 132/33 KV D/C Grid Sub-Station at Brajarajnagar to proposed 132/33 KV Grid Sub-station at village Kudaloi in Lakhanpur Tahsil of Jharsuguda D
|
Transmission Line
|
OPTCL
|
13.465
|
IN-PRINCIPLE
|
17-Jan-2023
|
17-Jan-2023
|
|
|
|
|
No
|
19
|
Orissa
|
FP/OR/ROAD/150863/2022
|
5-ORC543/2022-BHU
|
Improvement of Road from Kharabhuin PWD road chhak to Khandahata P.S.road via-Sankulei, Ghantabania, Panasaputuli road for the year 2018-19
|
Road
|
EXECUTIVE ENGINEER RURAL WORKS DIVISION BOUDH
|
6.098
|
IN-PRINCIPLE
|
22-Dec-2022
|
22-Dec-2022
|
|
|
|
|
No
|
20
|
Orissa
|
FP/OR/RAIL/45694/2020
|
5-ORA528/2022-BHU
|
Khurda Road - Bolangir New BG Rail Link Project i.e. from Km112-180
|
Railway
|
EAST COAST RAILWAY
|
594.618
|
IN-PRINCIPLE
|
05-Sep-2022
|
08-Dec-2022
|
|
|
|
Copy of SIR uploaded by Regional Office on: 23 Dec 2022
|
No
|
21
|
Orissa
|
FP/OR/IRRIG/40827/2019
|
5-ORA472/2021-BHU
|
Kanupur Canal System
|
Irrigation
|
KANPUR CANAL DIVISION
|
310.11
|
IN-PRINCIPLE
|
06-Sep-2021
|
08-Dec-2022
|
|
|
|
|
No
|
22
|
Orissa
|
FP/OR/ROAD/52724/2020
|
5-ORC527/2022-BHU
|
Widening & Strengthening of Raruan-Fagu via Ghagarbeda road from 0/000 km to 25/000km in the District of Mayurbhanj under CRF
|
Road
|
EXECUTIVE ENGINEER RAIRANGPUR RB DIVISION
|
7.043
|
IN-PRINCIPLE
|
17-Aug-2022
|
11-Oct-2022
|
|
|
|
|
No
|
23
|
Orissa
|
FP/OR/RAIL/147343/2021
|
5-ORC516/2022-BHU
|
Construction of Jharsuguda- Sardega New Railway Line for widening of Loading Platform under South Eastern Railway
|
Railway
|
SOUTH EASTERN RAILWAY,JHARSUGUDA
|
18.389
|
IN-PRINCIPLE
|
10-May-2022
|
20-Sep-2022
|
|
|
|
|
No
|
24
|
Orissa
|
FP/OR/MIN/15807/2015
|
5-ORC412/2020-BHU
|
Oraghat Iron & Manganese Mines
|
Mining
|
SAYED ABDUL HALIM
|
5.888
|
IN-PRINCIPLE
|
20-Mar-2020
|
24-Aug-2022
|
|
|
|
|
EC File NA
|
25
|
Orissa
|
FP/OR/ROAD/116414/2020
|
5-ORC522/2022-BHU
|
Widening/Resurfacing & Strengthening of Paniganda-Bamunigan-Daringbadi Road from 38/00 KM to 58/500 KM in Kandhamal District
|
Road
|
CHIEF ENGINEER (ROADS), WORKS DEPT., GOVT OF ODISHA, BHUBANESWAR
|
9.067
|
IN-PRINCIPLE
|
20-Jul-2022
|
20-Jul-2022
|
|
|
|
|
No
|
26
|
Orissa
|
FP/OR/ROAD/116406/2020
|
5-ORC519/2022-BHU
|
Construction of Kotagad-Subarnagiri-Shrirampur Road Under R&B Baliguda in Kandhamal District
|
Road
|
CHIEF ENGINEER (ROADS), WORKS DEPT., GOVT OF ODISHA, BHUBANESWAR
|
7.743
|
IN-PRINCIPLE
|
04-Jul-2022
|
04-Jul-2022
|
|
|
|
|
No
|
27
|
Orissa
|
FP/OR/MIN/142115/2021
|
8-49/1998-FC (PT-I)
|
Jilling Langalotta Iron Ore Mine
|
Mining
|
ODISHA MINING CORPORATION LTD
|
22.697
|
IN-PRINCIPLE
|
N/A
|
26-May-2022
|
|
|
|
|
EC File NA
|
28
|
Orissa
|
FP/OR/REHAB/146217/2021
|
5-ORC505/2022-BHU
|
Voluntary village relocation from Satkosia Gorge Sanctuary, Odisha
|
Rehabilitation
|
TAHASILDAR ANGUL
|
37.4
|
IN-PRINCIPLE
|
04-Mar-2022
|
17-May-2022
|
|
|
|
|
No
|
29
|
Orissa
|
FP/OR/Others/23166/2016
|
5-ORC496/2022-BHU
|
: Kalamang (Sagasahi)-Dabuna Slurry& Water Pipelines Project of M/s Essar Steel India Ltd.
|
Others
|
ArcelorMittal Nippon Steel India Limited
|
16.466
|
IN-PRINCIPLE
|
28-Dec-2021
|
28-Dec-2021
|
|
|
|
|
No
|
30
|
Orissa
|
FP/OR/ROAD/31846/2018
|
5-ORA462/2021-BHU
|
Widening and Strengthening of Tomka- Mangalpur Road (ODR) to 4 lane without paved shoulder from 0/000 Km to 45/150 Km in the District Jajpur Odisha.
|
Road
|
EXECUTIVE ENGINEER PANIKOILI R AND B DIVISIONPANIKOILI
|
133.579
|
IN-PRINCIPLE
|
16-Apr-2021
|
25-Nov-2021
|
|
|
|
|
No
|
31
|
Orissa
|
FP/OR/ROAD/32294/2018
|
5-ORC461/2021-BHU
|
Coal Corridor Road project
|
Road
|
SATYABAN
|
26.99
|
IN-PRINCIPLE
|
13-Apr-2021
|
20-Nov-2021
|
|
|
|
|
No
|
32
|
Orissa
|
FP/OR/Others/46243/2020
|
5-ORA456/2021-BHU
|
Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL), Odisha Phase-2 Project of GAIL
|
Others
|
GAIL INDIA LIMITED
|
65.4036
|
IN-PRINCIPLE
|
16-Mar-2021
|
16-Mar-2021
|
|
|
|
|
No
|
33
|
Orissa
|
FP/OR/IRRIG/40723/2019
|
5-ORC419/2020-BHU
|
Khairibhandan Barrage Project
|
Irrigation
|
EE, MAYURBHANJ INVESTIGATION DIVISION
|
26.444
|
IN-PRINCIPLE
|
03-Jun-2020
|
23-Feb-2021
|
|
|
|
|
No
|
34
|
Orissa
|
FP/OR/IRRIG/43753/2020
|
5-ORC451/2021-BHU
|
Proposal for Diversion 30.630 ha of forest land for Kala Barrage Project
|
Irrigation
|
EXECUTIVE ENGINNER, IB INVESTIGATION DIVISION
|
30.63
|
IN-PRINCIPLE
|
12-Feb-2021
|
12-Feb-2021
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
35
|
Orissa
|
FP/OR/IND/43075/2019
|
5-ORC442/2021-BHU
|
Establishment of OIL DEPOT by Bharat Petroleum Corporation Limited (BPCL) through IDCO, Bhubaneswar at village Arda, Tahasil- Kirmira, District- Jharsuguda, Odisha.
|
Industry
|
IDCO
|
39.599
|
IN-PRINCIPLE
|
06-Jan-2021
|
06-Jan-2021
|
|
|
|
|
No
|
36
|
Orissa
|
FP/OR/ROAD/17631/2016
|
5-ORC333/2017-BHU
|
Balngir-Sonpur section of NH57
|
Road
|
EXECUTIVE ENGINEER N H DIVISION BALANGIR
|
10.155
|
IN-PRINCIPLE
|
01-Jun-2018
|
05-Jan-2021
|
|
|
|
|
No
|
37
|
Orissa
|
FP/OR/TRANS/20912/2016
|
5-ORC328/2017-BHU
|
220 KV Transmission Line Diversion from Balimela to Malkangiri
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
18.5
|
IN-PRINCIPLE
|
09-Nov-2017
|
10-Jul-2020
|
|
|
|
|
No
|
38
|
Orissa
|
FP/OR/TRANS/25459/2017
|
5-ORC391/2019-BHU
|
132/33 KV LILO Transmission Line by OPTCL
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
14.019
|
IN-PRINCIPLE
|
14-Aug-2019
|
30-Nov-2019
|
|
|
|
|
No
|
39
|
Orissa
|
FP/OR/IND/36705/2018
|
5-ORC400/2019-BHU
|
Iron Ore Grinding, De-Sliming (Beneficiation) Plant & Slurry Pumping Station and Water Intake System of M/s JSW Utkal Steel Ltd., Barbil Tahasil, Keonjhar District
|
Industry
|
JSW UTKAL STEEL LIMITED
|
22.671
|
IN-PRINCIPLE
|
14-Nov-2019
|
14-Nov-2019
|
|
|
|
|
Yes
Proposal No.: IA/OR/IND/74415/2018
EC File No.:
Proposal Status: Delisted
|
40
|
Orissa
|
FP/OR/REHAB/26600/2017
|
5-ORC388/2019-BHU
|
Relocation of villages situated in Core and Buffer area of Similipal Tiger Reserve
|
Rehabilitation
|
TAHASILDAR THAKURMUNDA
|
39.59
|
IN-PRINCIPLE
|
22-Jun-2019
|
22-Jun-2019
|
|
|
|
|
No
|
41
|
Orissa
|
FP/OR/IRRIG/12731/2015
|
5-ORC307/2017-BHU
|
Sono Barrage Project
|
Irrigation
|
MAYURBHANJ INVESTIGATION DIVISION DEPARTMENT OF WATER RESOURCES ODISHA
|
14.928
|
IN-PRINCIPLE
|
17-Jan-2017
|
07-Jul-2017
|
|
|
|
|
Yes
Proposal No.:
EC File No.:
Proposal Status: No Proposal no.
|
42
|
Orissa
|
FP/OR/IRRIG/13364/2015
|
5-ORC303/2017-BHU
|
Aherajore Irrigation Project
|
Irrigation
|
EXECUTIVE ENGINEER, IB INVESTIGATION DIVISION
|
14.53
|
IN-PRINCIPLE
|
26-Dec-2016
|
07-Jul-2017
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
43
|
Orissa
|
FP/OR/TRANS/8680/2014
|
5-ORC312/2017-BHU
|
220 Kv Line Diversion from Loc-59 to 75
|
Transmission Line
|
OPTCL
|
7.102
|
IN-PRINCIPLE
|
27-Mar-2017
|
24-May-2017
|
|
|
|
|
No
|
44
|
Orissa
|
FP/OR/IND/12884/2015
|
5-ORC279/2016-BHU
|
NTPC LTD., DARLIPALI SUPER THERMAL POWER PROJECT
|
Industry
|
NTPC LTD DARLIPALI SUPER THERMAL POWER PROJECT
|
25.76
|
IN-PRINCIPLE
|
23-May-2016
|
17-Oct-2016
|
|
|
|
|
No
|
45
|
Orissa
|
FP/OR/IND/16495/2015
|
8-176/1997-Fc Vol.
|
BASUNDHARA COAL WASHERY (10MTY)
|
Industry
|
MCL
|
29.41
|
IN-PRINCIPLE
|
29-Aug-2016
|
29-Aug-2016
|
|
|
|
|
Yes
Proposal No.: IA/OR/CMIN/20520/2013
EC File No.: J-11015/435/2013-IA-II(M)
Proposal Status: EC Granted
|
46
|
Orissa
|
FP/OR/MIN/18356/2016
|
8-39/2016-FC
|
Balda Block Iron Mines of M/s Serajuddin & Co.
|
Mining
|
SERAJUDDIN AND CO
|
34.39
|
IN-PRINCIPLE
|
09-Aug-2016
|
09-Aug-2016
|
|
|
|
|
Yes
EC File No.: J-11015/18/2012-IA.II(M)
Proposal Status: EC Granted
|
47
|
Orissa
|
FP/OR/THE/13286/2015
|
5-ORC278/2016-BHU
|
ORISSA INTEGRATED POWER LIMITED
|
Thermal
|
ORISSA INTEGRATED POWER LIMITED
|
17.02
|
IN-PRINCIPLE
|
20-May-2016
|
20-May-2016
|
|
|
|
|
Yes
Proposal Status: EC under process
|