Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Proposal initially received at RO/HO(Date) | Proposal Pending Since(Date) | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Other Related Documents | Whether EC required (if so, status)? |
1
|
Maharashtra
|
FP/MH/IND/20151/2016
|
8-12/2024-FC
|
River Water Pipe Line for Industrial Use
|
Industry
|
ArcelorMittal Nippon Steel India Limited
|
0.1305
|
Pending at RO
|
22-May-2023
|
30-Apr-2025
|
|
|
|
|
No
|
2
|
Maharashtra
|
FP/MH/Pipeline/48180/2020
|
|
: Proposal for Ex- post Facto Approval for Diversion of Forest Land for Laying Water Intake Pipeline for BGPPL, Bhigwan, Tehsil Indapur, District Pune
|
Pipeline
|
BILT GRAPHIC PAPER PRODUCTS LIMITED -UNIT BHIGWAN
|
0.83
|
Pending at RO
|
08-Nov-2023
|
03-Apr-2025
|
|
|
|
|
EC File NA
|
3
|
Maharashtra
|
FP/MH/ROAD/115795/2020
|
|
Rehabilitation and Up-gradation of Nagpur-Katol-Warud National Highway (NH 353J) from existing Km 60+100 (End of Katol bypass) to 101+085 (Warud up to Joint junction) two lane with paved shoulders in
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
0.34
|
Pending at RO
|
17-Aug-2023
|
17-Mar-2025
|
|
|
|
|
No
|
4
|
Maharashtra
|
FP/MH/MIN/8832/2014
|
FC-II/MH-165/2021-NGP
|
Sakhari Irawati (Pouni-III)OC Mine
|
Mining
|
WESTERN COALFIELDS LIMITED
|
12.07
|
IN-PRINCIPLE
|
10-Aug-2021
|
27-Nov-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
5
|
Maharashtra
|
FP/MH/IRRIG/47897/2020
|
FC-II/MH-223/2023-NGP
|
Minor Irrigation Tank Boripada, Tal: Tryambakeshwar, Dist: Nashik
|
Irrigation
|
DISTRICT WATER CONSERVATION OFFICERSOIL WATER CONSERVATION DIVISIONNASHIK
|
9.19
|
IN-PRINCIPLE
|
08-Aug-2023
|
11-Sep-2024
|
|
|
|
|
No
|
6
|
Maharashtra
|
FP/MH/ROAD/152830/2022
|
FC-II/MH-240/2024-NGP
|
Diversion of 6.3912 Ha of Forest Land for Satana Mangrul Road
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
6.3912
|
IN-PRINCIPLE
|
28-Aug-2024
|
28-Aug-2024
|
|
|
|
|
No
|
7
|
Maharashtra
|
FP/MH/ROAD/153241/2022
|
FC-II/MH-231/2023-NGP
|
Constuction of Coastal road from Jalmarg, Sector 16 Kharghar to Sector 11 in CBD Belapur and balcance link between Sector 15 CBD Belapur to water transport terminal in Nerul at Navi Mumbai
|
Road
|
CITY AND INDUSTRIAL DEVELOPEMENT CORPORATION OF MAHARASHTRA LTD
|
8.2222
|
IN-PRINCIPLE
|
25-Sep-2023
|
28-Aug-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
8
|
Maharashtra
|
FP/MH/ROAD/114977/2020
|
FC-II/MH-232/2023-NGP
|
Construction of Eastern part of Pune Ring Road from Urse (Km 00.000) to Solu (Km 38.340) around Pune city in Maharashtra State
|
Road
|
MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
|
17.898
|
IN-PRINCIPLE
|
12-Dec-2023
|
09-Aug-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
9
|
Maharashtra
|
FP/MH/IRRIG/122284/2021
|
FC-II/MH-239/2024-NGP
|
Construction of Manekhind MI scheme, Village Manekhind, Tal Shahapur, Dist Thane State Maharashtra
|
Irrigation
|
DISTRICT WATER CONSERVATION OFFICER SOIL AND WATER CONSERVATION DEPARTMENT
|
25.554
|
IN-PRINCIPLE
|
27-May-2024
|
09-Aug-2024
|
|
|
|
|
No
|
10
|
Maharashtra
|
FP/MH/RAIL/41780/2019
|
FC-II/MH-219/2023-NGP
|
Third railway line between Kalyan and Kasara stations of 67.62 km in Ulhasnagar, Kalyan & Shahapur Talukas, Thane District, Maharashtra
|
Railway
|
CENTRAL RAILWAY CST MUMBAI
|
16.6846
|
IN-PRINCIPLE
|
25-May-2023
|
16-Jul-2024
|
|
|
|
|
No
|
11
|
Maharashtra
|
FP/MH/ROAD/154408/2022
|
FC-III/MH-56/2023-NGP
|
Pune Ring Road Western Alignment (68.8 km) Start from Urse Village Ch 0+00 and Ends at Varve (Kelwade) Village Ch-68+80.
|
Road
|
MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
|
48.55
|
IN-PRINCIPLE
|
28-Jul-2023
|
18-Mar-2024
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
12
|
Maharashtra
|
FP/MH/IRRIG/127453/2021
|
FC-II/MH-211/2023-NGP
|
PROPOSAL FOR DIVERSION OF FOREST LAND FOR CONSTRUCTION OF MINOR IRRIGATION TANK IN NIRUKHE VILLAGE TAL- KUDAL DIST- SINDHUDURG
|
Irrigation
|
EXECUTIVE ENGINEER MINOR IRRIGATION DIVISION OROS – SINDHUDURGNAGARI
|
18.94
|
IN-PRINCIPLE
|
20-Mar-2023
|
22-Nov-2023
|
|
|
|
|
No
|
13
|
Maharashtra
|
FP/MH/ROAD/119248/2021
|
FC-III/MH-54/2022-NGP
|
Up-gradation to2/4 lane with paved shoulder configuration of Gadichiroli-Sironcha of NH- 353 C in the State of Maharashtra by Ministry of Road Transport & Highways from Ashti to Sironcha in Gadhciroli
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
54.274
|
IN-PRINCIPLE
|
19-Dec-2022
|
21-Nov-2023
|
|
|
|
|
No
|
14
|
Maharashtra
|
FP/MH/ROAD/27126/2017
|
FC-I/MH-104/2019-NGP
|
Proposed Construction of Goregaon-Mulund Link Road, at Village - Aarey, Gundgaon, Vihar & Nahur, District - Mumbai Suburban by MCGM
|
Road
|
MUNICIPAL CORPORATION OF GREATER MUMBAI
|
19.43
|
IN-PRINCIPLE
|
06-Mar-2019
|
03-Nov-2023
|
|
|
|
|
Yes
Proposal No.: IA/MH/MIS/65826/2017
EC File No.: 10-40/2017-IA.III
Proposal Status: TOR GRANTED
|
15
|
Maharashtra
|
FP/MH/ROAD/148050/2021
|
FC-II/MH-213/2023-NGP
|
Construction of Balkum to Gaimukh DP Road (NH3 Connector Ghodbunder By-Pass) by Thane Municipal Corporation
|
Road
|
THANE MUNICIPAL CORPORATION PWD
|
12.2607
|
IN-PRINCIPLE
|
27-Mar-2023
|
22-Sep-2023
|
|
|
|
|
No
|
16
|
Maharashtra
|
FP/MH/TRANS/17112/2015
|
FC-II/MH-141/2021-NGP
|
Erection of 33 KV Karjane Transmission line, Chopda 1 (O&M), Jalgaon District, Maharastra State
|
Transmission Line
|
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO
|
23.1
|
IN-PRINCIPLE
|
19-Nov-2021
|
14-Jun-2023
|
|
|
|
|
No
|
17
|
Maharashtra
|
FP/MH/ROAD/118805/2021
|
FC-III/MH-51/2022-NGP
|
Upgradation of NH 353 C From Ashti to Sironcha in Section Allaplli to Sironcha
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
132.102
|
IN-PRINCIPLE
|
02-Aug-2022
|
23-Dec-2022
|
|
|
|
|
No
|
18
|
Maharashtra
|
FP/MH/IRRIG/52943/2020
|
FC-II/MH-190/2022-NGP
|
Handyakundya Storage Tank
|
Irrigation
|
EXECUTIVE ENGINEER, MINOR IRRIGATION DIVISION, JALGAON
|
31.49
|
IN-PRINCIPLE
|
10-Aug-2022
|
23-Dec-2022
|
|
|
|
|
No
|
19
|
Maharashtra
|
FP/MH/ROAD/154545/2022
|
FC-II/MH-196/2022-NGP
|
Proposal for diversion of 8.4771 Ha of forest land for up-gradation and widening of Mudkhed-Bhokar NH-161A section from km 22.000 to Km. 43.000 of 21 km length in Mudkhed & Bhokar Talukas, Nanded Dist
|
Road
|
PUBLIC WORKS DEPARTMENT MAHARASHTRA
|
8.4771
|
IN-PRINCIPLE
|
16-Sep-2022
|
12-Dec-2022
|
|
|
|
|
No
|
20
|
Maharashtra
|
FP/MH/ROAD/20894/2016
|
FC-II/MH-147/2021-NGP
|
Nashik-Peth Road, Section of NH-848
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION NASHIK
|
7.332
|
IN-PRINCIPLE
|
16-Mar-2021
|
07-Dec-2022
|
|
|
|
|
No
|
21
|
Maharashtra
|
FP/MH/ROAD/45965/2020
|
FC-II/MH-204/2022-NGP
|
[AU-107] Construction of Two Lane Road with Paved Shoulders from Hadgaon – Tamsa – Bhokar – Umri – Karegaon – Lohgaon SH-251, Chainage 0/00 To 89/221 On Hybrid Annuity in Nanded District.
|
Road
|
PWD BHOKAR DIVISION
|
7.62
|
IN-PRINCIPLE
|
01-Dec-2022
|
01-Dec-2022
|
|
|
|
|
No
|
22
|
Maharashtra
|
FP/MH/RAIL/43265/2019
|
FC-II/MH-156/2021-NGP
|
Diversion Of Forest Land For Panvel - Karjat Doubling Railway Line (Panvel - Karjat Section) In Raigad Dist
|
Railway
|
MUMBAI RAILWAY VIKAS CORPORATION LIMITED
|
9.1321
|
IN-PRINCIPLE
|
10-Mar-2021
|
11-Jul-2022
|
|
|
|
|
No
|
23
|
Maharashtra
|
FP/MH/TRANS/42862/2019
|
FC-II/MH-154/2021-NGP
|
LILO on existing 220 KV D/C Uran - Apta Transmission line for proposed 220 KV S/S at sai panvel
|
Transmission Line
|
LAXMIPATI BALAJI SUPPLY CHAIN MANAGEMENT LIMITED
|
18.3915
|
IN-PRINCIPLE
|
16-Mar-2021
|
08-Jun-2022
|
|
|
|
|
No
|
24
|
Maharashtra
|
FP/MH/TRANS/45600/2020
|
FC-III/MH-47/2022-NGP
|
132 KV DC Mul - SICOM Chandrapur Transmission line
|
Transmission Line
|
MSETCL EHV PROJECTS DIVISION CHANDRAPUR
|
44.0397
|
IN-PRINCIPLE
|
14-Jan-2022
|
25-Apr-2022
|
|
|
|
|
No
|
25
|
Maharashtra
|
FP/MH/ROAD/117637/2020
|
FC-II/MH-173/2021-NGP
|
Forest Land Diversion proposal for “RRP 2 additional works of roads and Bridges in Korepalli-Kavtharam-Kapwancha-Assa- Modumadagu road with 1 minor bridge VR 36 & VR 128 Km) Sironcha Tehsil Gadchiroli
|
Road
|
PWD GADCHIROLI
|
13.8
|
IN-PRINCIPLE
|
25-Sep-2021
|
21-Feb-2022
|
|
|
|
|
No
|
26
|
Maharashtra
|
FP/MH/ROAD/117622/2020
|
FC-II/MH-170/2021-NGP
|
Forest Land Diversion proposal for RRP 2 additional works of roads & bridges in Somanpalli-Zinganoor via Kopela ODR 68 & MDR 26 (length -16.960 km) Sironcha tehsil Gadchiroli district in Maharashtra S
|
Road
|
PWD GADCHIROLI
|
19.8469
|
IN-PRINCIPLE
|
25-Sep-2021
|
21-Feb-2022
|
|
|
|
|
No
|
27
|
Maharashtra
|
FP/MH/ROAD/25848/2017
|
FC-II/MH-140/2021-NGP
|
Diversion of 33.420 ha. Forest Land for Up-gradation to Two Lanes with lpaved shoulder for Nanded-Kinwat-Mahur-Arni Road Network in the State of Maharasshtra (147.758km)
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
33.42
|
IN-PRINCIPLE
|
02-Feb-2021
|
17-Feb-2022
|
|
|
|
|
No
|
28
|
Maharashtra
|
FP/MH/ROAD/48733/2020
|
FC-II/MH-174/2021-NGP
|
Link Road (MH-1057) Improvement/ Upgradation & Maintenance of Kasansur Ghotsur Gudram Bhumkam Road (Up To State Border) (ODR-16) including 2 Major Bridges at CH. 8/200 & 12/985 and 2 Minor Bridges at CH. 2/320 & CH.5/010 in Etapalli Tahsil of Dist. Gadchiroli.
|
Road
|
PUBLIC WORKS DIVISION ALLAPALLI
|
19.927
|
IN-PRINCIPLE
|
25-Sep-2021
|
17-Feb-2022
|
|
|
|
|
No
|
29
|
Maharashtra
|
FP/MH/ROAD/47068/2020
|
FC-II/MH-164/2021-NGP
|
Rehabilitation & Upgradation of Barasgaon to Rahatee Bu. Section from km.558/200 to 615/000 of NH 222 ( new NH 61) to Two lane with paved shoulder in the state of Maharashtra under NHDP IV
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
5.34
|
IN-PRINCIPLE
|
07-Dec-2021
|
07-Dec-2021
|
|
|
|
|
No
|
30
|
Maharashtra
|
FP/MH/ROAD/48279/2020
|
FC-II/MH-175/2021-NGP
|
Link Road (MH-1050) Improvement/ Upgradation & Maintenance of ODR-51, Dhanora to Pendhari From Km 0+000 to Km 36+650 in Dhanora Tehsil of Distt. Gadchiroli.
|
Road
|
OFFICE OF EXECUTIVE ENGINEER, PUBLIC WORKS DIVISION NO.2, GADCHIROLI
|
18.412
|
IN-PRINCIPLE
|
25-Sep-2021
|
01-Dec-2021
|
|
|
|
|
No
|
31
|
Maharashtra
|
FP/MH/ROAD/48159/2020
|
FC-II/MH-171/2021-NGP
|
Link Road (MH-1052) Improvement /Upgradation and Maintenance of MDR-11, Podaboriya to Godalwahi From Km 36+200 To Km 40+370 at Dhanora Tehsil of Distt. Gadchiroli.
|
Road
|
OFFICE OF EXECUTIVE ENGINEER, PUBLIC WORKS DIVISION NO.2, GADCHIROLI
|
5.004
|
IN-PRINCIPLE
|
25-Sep-2021
|
01-Dec-2021
|
|
|
|
|
No
|
32
|
Maharashtra
|
FP/MH/ROAD/48243/2020
|
FC-II/MH-169/2021-NGP
|
Link Road (MH-1051) Improvement/ Upgradation & Maintenance of VR-105, Murromgaon to Katezari From Km 0+000 to Km 11+350 in Dhanora Tehsil of Distt. Gadchiroli
|
Road
|
OFFICE OF EXECUTIVE ENGINEER, PUBLIC WORKS DIVISION NO.2, GADCHIROLI
|
7.688
|
IN-PRINCIPLE
|
25-Sep-2021
|
01-Dec-2021
|
|
|
|
|
No
|
33
|
Maharashtra
|
FP/MH/ROAD/40239/2019
|
FC-II/MH-152/2021-NGP
|
“Rehabilitation and Up-gradation of Patgaon to Khopoli Section I design Ch (km 43.783 to km 69.508) part of NH-3 Shahpur - Murbad – Mhasa – Karjat - Khopoli-NH4 section of newly declared NH-548 A in t
|
Road
|
MSRDC BANDRA MUMBAI
|
12.8957
|
IN-PRINCIPLE
|
10-Mar-2021
|
30-Nov-2021
|
|
|
|
|
No
|
34
|
Maharashtra
|
FP/MH/Others/32662/2018
|
FC-II/MH-108/2019-NGP
|
White Magic Project
|
Others
|
SAI INTERPRISES
|
9.78
|
IN-PRINCIPLE
|
28-Mar-2019
|
19-Nov-2021
|
|
|
|
|
No
|
35
|
Maharashtra
|
FP/MH/ROAD/48442/2020
|
FC-II/MH-135/2021-NGP
|
Diversion of Forest land for the project "Rehabilitation & Up Gradation of Arni to Naigaon Bandi(Km0.000 to Km40.000) Section and Poharadevi Link (Km 0.000 to 5.132) NH 161A to Two lane with paved sho
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
5.61
|
IN-PRINCIPLE
|
10-Feb-2021
|
26-Oct-2021
|
|
|
|
|
No
|
36
|
Maharashtra
|
FP/MH/ROAD/39684/2019
|
FC-II/MH-150/2021-NGP
|
“Rehabilitation and Up-gradation of Shahpur Patgaon Section 1 &2 – (KM 0+000 to KM 20+130) and (KM 20+130 to KM 43+600) part of NH-3 Shahpur - Murbad – Mhasa – Karjat - Khopoli-NH4 section of newly
|
Road
|
MSRDC BANDRA MUMBAI
|
17.01
|
IN-PRINCIPLE
|
10-Mar-2021
|
25-Oct-2021
|
|
|
|
|
No
|
37
|
Maharashtra
|
FP/MH/ROAD/50280/2020
|
FC-II/MH-145/2021-NGP
|
Diversion of 11.8639ha. area Reserved Forest, Protected Forest and Private Forest land for Rehabilitation and Up-gradation of two lane with paved shoulders Pune - Mulshi - Mangaon - Mhalsa -Dighi Por
|
Road
|
MSRDC BANDRA MUMBAI
|
11.8639
|
IN-PRINCIPLE
|
08-Mar-2021
|
08-Mar-2021
|
|
|
|
|
No
|
38
|
Maharashtra
|
FP/MH/ROAD/34626/2018
|
FC-II/MH-139/2021-NGP
|
Diversion of 6.38 ha. of Forest Land for Aurangabad Jalgaon Road Secition- 1 (Aurangabad to Sillod)
|
Road
|
PUBLIC WORKS DEPARTMENT NATIONAL HIGHWAYS AURANGABAD MAHARASHTRA
|
6.38
|
IN-PRINCIPLE
|
02-Feb-2021
|
02-Feb-2021
|
|
|
|
|
No
|
39
|
Maharashtra
|
FP/MH/ROAD/39155/2019
|
FC-II/MH-133/2020-NGP
|
Proposed for Rehabilitation & Up-gradation of newly declared Rehabilitation & Up-gradation of NH-548 A Section from Indapur to Agardanda (Design Ch. 0+000 to 42+345) to Two lane with paved shoulders
|
Road
|
MSRDC BANDRA MUMBAI
|
18.8136
|
IN-PRINCIPLE
|
09-Dec-2020
|
09-Dec-2020
|
|
|
|
|
No
|
40
|
Maharashtra
|
FP/MH/REHAB/29586/2017
|
FC-II-MH-103-2019-NGP
|
Proposal for Additional Rehabilitation Area of Dicholi Village of Koyna Wildlife Sanctuary
|
Rehabilitation
|
DYCF SANGLI
|
20
|
IN-PRINCIPLE
|
06-Mar-2019
|
16-Jun-2020
|
|
|
|
|
No
|
41
|
Maharashtra
|
FP/MH/IRRIG/37867/2018
|
FC-II-MH-110-2019-NGP
|
Nimbhel Storage Tank under Prakasha Burai Lift Irrigation Scheme Tal. & Dist. Nandurbar
|
Irrigation
|
EXECUTIVE ENGINEER, NANDURBAR MEDIUM PROJECT DIVISIONAL UNIT, NANDURBAR
|
12.92
|
IN-PRINCIPLE
|
25-Jun-2019
|
09-Jan-2020
|
|
|
|
|
No
|
42
|
Maharashtra
|
FP/MH/Others/38866/2019
|
FC-II-MH-119-2019-NGP
|
Maharshi Vedic Health Pvt. Ltd.
|
Others
|
MAHARSHI VEDIK HEALTH PVT LTD PUNE
|
39.25
|
IN-PRINCIPLE
|
26-Sep-2019
|
01-Oct-2019
|
|
|
|
|
No
|
43
|
Maharashtra
|
FP/MH/ROAD/34047/2018
|
FC-III-MH-35-2018-NGP
|
Diversion of 383.8535 Ha. (Final area 385.6147 Ha.) of Forest land in favor of Maharashtra State Road Development Corporation Limited, Bandra (W) Mumbai for construction of Nagpur-Mumbai Expressway (Package-V) passing from Village Taranganpada, Igatpuri Taluka, Nashik District to Village Amane, Bhiwandi Taluka, Thane District of 78 km in the state
|
Road
|
MAHARASHTRA STATE ROAD DEVELOPMENT CORPORATION
|
383.8535
|
IN-PRINCIPLE
|
15-Dec-2018
|
28-Mar-2019
|
|
|
|
|
Yes
Proposal No.: IA/MH/MIS/61955/2017
EC File No.: 10-3/2017-IA-III
Proposal Status: EC Granted
|
44
|
Maharashtra
|
FP/MH/ROAD/37751/2018
|
FC-II-MH-100-2019-NGP
|
Improvement to Ambadi Jawarla Road,MDR-94,Km.0/00 to 6/850,Tq-Kinwat Dist.Nanded 8.22 Ha. Forest Land.
|
Road
|
PUBLIC WORKS DEPARTMENT MAHARASHTRA
|
8.22
|
IN-PRINCIPLE
|
23-Jan-2019
|
20-Feb-2019
|
|
|
|
|
No
|
45
|
Maharashtra
|
FP/MH/ROAD/16793/2015
|
FC-II-MH-97-2018-NGP
|
Four Laning of Aurangabad- Karodi Section of NH-211 designed with partial Green filed alignment as bypass to Aurangabad city in Aurangabad District
|
Road
|
National Highways Authority of India
|
11.78
|
IN-PRINCIPLE
|
15-Dec-2018
|
15-Feb-2019
|
|
|
|
|
No
|
46
|
Maharashtra
|
FP/MH/ENCRH/32585/2018
|
FC-II-MH-93-2018-NGP
|
Sanjay Nagar Enchroachement
|
Encroachments
|
JILHADHIKARI GONDIYA
|
6.53
|
IN-PRINCIPLE
|
15-Dec-2018
|
06-Feb-2019
|
|
|
|
|
No
|
47
|
Maharashtra
|
FP/MH/ROAD/26422/2017
|
FC-III-MH-34-2018-NGP
|
Mumbai-Pune Expressway Missing Link (Capacity Augmentation of Yashwanthrao chavan expressway)
|
Road
|
MAHARASHTRA STATE ROAD DEVELOPMENT AUTHORITY LTD
|
74.7102
|
IN-PRINCIPLE
|
15-Dec-2018
|
24-Jan-2019
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
48
|
Maharashtra
|
FP/MH/WATER/31069/2017
|
FC-II-MH-83-2018-NGP
|
Surya Regional Water Supply Project
|
Drinking Water
|
MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY
|
30.399
|
IN-PRINCIPLE
|
13-Aug-2018
|
06-Dec-2018
|
|
|
|
|
No
|
49
|
Maharashtra
|
FP/MH/MIN/18213/2016
|
FC-II-MH-91-2018-NGP
|
13.00
|
Mining
|
SHRI KEDARNATH MININIG AND EARTHMOVERS CO
|
13
|
IN-PRINCIPLE
|
25-Sep-2018
|
19-Nov-2018
|
|
|
|
|
Yes
Proposal Status: EC application yet to be submitted
|
50
|
Maharashtra
|
FP/MH/MIN/18180/2016
|
FC-II-MH-92-2018-NGP
|
M/s. Shri Jugai Minerals Ghungur and Ambarde Laterite Mine
|
Mining
|
SHRI JUGAI MINERALS KOLHAPUR
|
34.6
|
IN-PRINCIPLE
|
09-Oct-2018
|
19-Nov-2018
|
|
|
|
|
Yes
Proposal Status: EC under process
|
|