Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Date of Stage-I | View Report on Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | View TimeLine Details | Site Inspection Report | Other Related Documents | Whether EC required (if so, status)? |
1
|
Uttar Pradesh
|
FP/UP/Approach/153276/2022
|
8B/UP/06/141/2022/FC
|
Proposed to IOCL Retail Outlet on Jahanabad-Pilibhit Road NH-30 (Old NH-74) in Km No. 291 (CH. No. 290.093, RHS) at Khasra No. 442, Village:-Lalauri, Tehsil:-Pilibhit, District:-Pilibhit
|
Approach Access
|
INDIAN OIL COPERATION LIMITED
|
0.198204
|
IN-PRINCIPLE
|
19-Jul-2022
|
|
|
|
|
|
No
|
2
|
Uttar Pradesh
|
FP/UP/Approach/45401/2020
|
8B/UP/06/121/2020
|
Protected Forest Land for Exit/Entry Approach to Proposed New IOCL Retail Outlet on Fatehgarh(Farrukhabad)-Gurusaigan Road(SH-29A) in Betwwen Km.24 to 25(Ch.23.972),At Khasra No.134K,Village:Malikpur,District:Kannauj
|
Approach Access
|
INDIAN OIL CORPORATION LIMITED AGRA TERMINAL
|
0.165455
|
IN-PRINCIPLE
|
19-Oct-2020
|
|
|
|
|
|
No
|
3
|
Uttar Pradesh
|
FP/UP/Approach/48833/2020
|
8B/UP/06/74/2021/FC
|
Retail Outlet by Hindustan Petroleum Corporation Ltd. at KM 14.200 on L.H.S. of Fatehpur-Joniha Road (ODR) at Gata No. 1502, Village-Aswar Tarapur, Tahsil-Fatehpur, District-Fatehpur (UP)
|
Approach Access
|
HINDUSTAN PETROLIUM CORPORATION LIMITED
|
0.08047
|
IN-PRINCIPLE
|
30-Sep-2021
|
|
|
|
|
|
No
|
4
|
Uttar Pradesh
|
FP/UP/Canal/44512/2020
|
8B/UP/02/166/2020
|
Forest Land Proposed to be diverted for Construction of Campierganj Branch Canal in between km.51 to 62.106 under Saryu Nahar Pariyojna in District:Maharajganj
|
Canal
|
RAPTI NAHAR NIRMAN KHAND II TULSIPUR BALRAMPUR
|
0.4
|
IN-PRINCIPLE
|
15-Jan-2021
|
|
|
|
|
|
No
|
5
|
Uttar Pradesh
|
FP/UP/Others/12699/2015
|
8B/UP/06/4/2017/FC
|
Proposed 0.167175 Hectare Protected Forest Area for Exit/Entry Approach to Essar Oil Limited Retail Outlet
|
Others
|
ESSAR OIL LIMITED
|
0.167175
|
IN-PRINCIPLE
|
21-Mar-2017
|
|
|
|
|
|
No
|
6
|
Uttar Pradesh
|
FP/UP/Others/13921/2015
|
8B/UP/06/39/2016/FC
|
Proposal for the diversion rd side protected forest strip for the construction of Approach road to New Essar oil Ltd. Retail outlet on Agra-Fatehabad road,between km. 23 to 24 Mewali kalan Tehsil-Fatehabad dist- Agra
|
Others
|
Essar Oil Limited
|
0.0748
|
IN-PRINCIPLE
|
27-Dec-2016
|
|
|
|
|
|
No
|
7
|
Uttar Pradesh
|
FP/UP/Others/20517/2016
|
8B/UP/06/95/2016/FC
|
Retail Outlet by Essar Oil Ltd at km. 17.100 on R.H.S. of SH-62, Agra-Fatehabad Road at Khasara No.- 1612, Village - Kundol in Tahsil & District Agra.
|
Others
|
ESSAR OIL LTD NOIDA
|
0.0750028
|
IN-PRINCIPLE
|
06-Jun-2017
|
|
|
|
|
|
No
|
8
|
Uttar Pradesh
|
FP/UP/Others/23174/2016
|
8B/UP/06/8/2018/FC
|
Forest Land Proposed to be diverted for Exit/Entry approach of HPCL Retail Outlet on Bilgram-Unnao Road (SH-38), At Gata No-229,230, Village:- Chandpur,Tehsil:- Bilgram, District:- Hardoi
|
Others
|
Hindustan Petroleum Corporation Limited
|
0.08471
|
IN-PRINCIPLE
|
09-Apr-2019
|
|
|
|
|
|
No
|
9
|
Uttar Pradesh
|
FP/UP/Others/23468/2017
|
8B/UP/09/69/2017/FC
|
Forest Land Proposed to be diverted for Siti Energy Limited CNG Station on Delhi-Bareilly-Lucknow Road Old NK-24 (City Portion) in km. 164 (CH. 163.100) At Khasra No. 196/3, Village- Mustafabad Tehsil- Moradabad District- Moradabad
|
Others
|
SITI ENERGY LIMITED VASANT KUNJ NEW DELHI
|
0.1009
|
IN-PRINCIPLE
|
06-Mar-2018
|
|
|
|
|
|
No
|
10
|
Uttar Pradesh
|
FP/UP/Others/25541/2017
|
8B/UP/06/19/2018/FC
|
Protected Forest Land Proposed to be diverted for Exit/Entry of Essar Oil Retail Outlet On Palwal- Tappal-Aligarh Road (SH-22A) At KM.74 Chanage 73-800M, At Khasra No.141 A, Village: Lahosara Bisawan, Block-Lodha, Taluka: Aligarh, District: Aligarh
|
Others
|
Essar Oil Limited
|
0.075028
|
IN-PRINCIPLE
|
31-Jul-2018
|
|
|
|
|
|
No
|
11
|
Uttar Pradesh
|
FP/UP/ROAD/10456/2015
|
8B/UP/06/30/2015/FC
|
widening of old NH-28 Lucknow Faizabad National highway(city portion Barabanki) along with divider and levelled footpath
|
Road
|
EXECUTIVE ENGINEER CD PWD BARABANKI
|
1.48
|
IN-PRINCIPLE
|
16-Oct-2015
|
|
|
|
|
|
No
|
12
|
Uttar Pradesh
|
FP/UP/ROAD/10971/2015
|
8B/UP/06/12/2015
|
Widening of two lane to four lane of NH-92 (New NH-719) km 60.000 to km 69.850
|
Road
|
EXECUTIVE ENGINEER NH DIVISION L N V ETAWAH
|
7.7285
|
IN-PRINCIPLE
|
15-Jun-2015
|
|
|
|
|
|
No
|
13
|
Uttar Pradesh
|
FP/UP/ROAD/17575/2016
|
8B/UP/06/37/2016
|
Construction of Four Lane: Jalaun to Orai (Bilrayan - Panwari Road SH21 From Km 352.00 to 370.450, Bypass No. 1 & 2 and Remaining Part of NH 25) District-Jalaun, Uttar Pradesh
|
Road
|
PDPWDORAI
|
35.71435
|
IN-PRINCIPLE
|
28-Jul-2016
|
|
|
|
|
|
No
|
14
|
Uttar Pradesh
|
FP/UP/ROAD/20045/2016
|
8B/UP/06/59/2016
|
Protected Forest Land Proposed for Construction of Cycle Track from Bakshi Ka Talab To(CH.482.00 to 488.750)Madiaon along NH-24 in District Lucknow
|
Road
|
CONSTRUCTION DIVISION ONE PWD LUCKNOW
|
4.8
|
IN-PRINCIPLE
|
29-Aug-2016
|
|
|
|
|
|
No
|
15
|
Uttar Pradesh
|
FP/UP/ROAD/30577/2017
|
8B/UP/06/46/2018/FC
|
Protected Forest Land proposed to be diverted for construction of Flyover on Rambagh Railway Line In City Allahabad District Allahabad
|
Road
|
UP STATE BRIDGE CORPORATION LTD. BRIDGE CONSTRUCTION UNIT ALLAHABAD
|
0.0152
|
IN-PRINCIPLE
|
04-May-2018
|
|
|
|
|
|
No
|
16
|
Uttar Pradesh
|
FP/UP/ROAD/39999/2019
|
8B/UP/06/102/2019
|
Widening and strengthening of road from New NH-9 (Old NH-24) to proposed solid waste management plant at Uppar Ganga Canal Ghaziabad mile 106.775 (170.84 Km) to 107.00 (171.2 Km) and Uppar Ganga Canal Hapur mile 107.00 (171.2 Km) to 107.984 (172.775 Km) in village Galand, Pipalheda, Tehsil Dhaulana, District Hapur
|
Road
|
GHAZIABAD DEVELOPMENT AUTHORITY GHAZIABAD
|
0.8156
|
IN-PRINCIPLE
|
13-Jan-2021
|
|
|
|
|
|
No
|
17
|
Uttar Pradesh
|
FP/UP/THE/14236/2015
|
8B/UP/08/38/2016/FC
|
WATER PIPELINE CORRIDOR AND APPROACH ROAD FOR MIRZAPUR 1320 MW THERMAL POWER PROJECT
|
Thermal
|
WELSPUN ENERGY UP PRIVATE LIMITED
|
8.3581
|
IN-PRINCIPLE
|
09-Sep-2025
|
|
|
|
|
|
EC File NA
|
18
|
Uttar Pradesh
|
FP/UP/TRANS/11592/2015
|
8B/UP/04/33/2015/FC
|
Proposed Lying Under Ground Electric Cable under RAPDRP Project
|
Transmission Line
|
DAKSHINANCHAL VIDUT VITRAN NIGAM LIMITED
|
0.39
|
IN-PRINCIPLE
|
20-Oct-2015
|
|
|
|
|
|
No
|
19
|
Uttar Pradesh
|
FP/UP/TRANS/26448/2017
|
8B/UP/04/37/2018/FC
|
765 KV D/C Orai-Aligarh Transmission Line Part-III(PKG TE08) under WR-NR IRSS Scheme
|
Transmission Line
|
POWERGRID MAINPURI
|
2.8256
|
IN-PRINCIPLE
|
22-Nov-2018
|
|
|
|
|
|
No
|
20
|
Uttar Pradesh
|
FP/UP/TRANS/26448/2017
|
8B/UP/04/37/2018/FC
|
765 KV D/C Orai-Aligarh Transmission Line Part-III(PKG TE08) under WR-NR IRSS Scheme
|
Transmission Line
|
POWERGRID MAINPURI
|
2.8256
|
IN-PRINCIPLE
|
22-Nov-2018
|
|
|
|
|
|
No
|
21
|
Uttar Pradesh
|
FP/UP/TRANS/31506/2018
|
8B/UP/04/22/2018/FC
|
765kV D/C Orai - Aligarh Transmission line Part-4 of PkgTE09 under WR - NR IRSS Scheme
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LTD ALIGARH
|
1.6677
|
IN-PRINCIPLE
|
19-Nov-2018
|
|
|
|
|
|
No
|
22
|
Uttar Pradesh
|
FP/UP/Others/11710/2015
|
8B/UP/06/48/2015/FC
|
Retail Outlet
|
Others
|
Essar Oil Limited
|
0.072
|
IN-PRINCIPLE
|
02-Feb-2016
|
|
|
|
|
|
No
|
23
|
Uttar Pradesh
|
FP/UP/Others/12838/2015
|
8B/UP/06/28/2015/FC
|
Proposed 0.092Ha Protected forest area for Essar Oil Limited Retail outlet
|
Others
|
Essar Oil Limited
|
0.092
|
IN-PRINCIPLE
|
04-Nov-2015
|
|
|
|
|
|
No
|
24
|
Uttar Pradesh
|
FP/UP/Others/13877/2015
|
8B/UP/06/40/2017/FC
|
Retail Outlet by Essar Oil ltd.A-5,Sector-3,Noida at KM.26.320 on RH.S.of SH.80,Aligarh-Raya-Mathura Road at Khasra no.537,Village-Biswali in Tahsil-Iglas,District-Aligarh
|
Others
|
Essar Oil Limited
|
0.075012
|
IN-PRINCIPLE
|
03-Jan-2022
|
|
|
|
|
|
No
|
25
|
Uttar Pradesh
|
FP/UP/Others/20094/2016
|
8B/UP/09/105/2016/FC
|
Jagdishpur-Haldiya pipe line and spurline project (Uttar Pradesh section)
|
Others
|
GAIL INDIA LIMITED
|
0.4828
|
IN-PRINCIPLE
|
20-Mar-2017
|
|
|
|
|
|
No
|
26
|
Uttar Pradesh
|
FP/UP/Others/20094/2016
|
8B/UP/09/105/2016/FC
|
Jagdishpur-Haldiya pipe line and spurline project (Uttar Pradesh section)
|
Others
|
GAIL INDIA LIMITED
|
0.4828
|
IN-PRINCIPLE
|
20-Mar-2017
|
|
|
|
|
|
No
|
27
|
Uttar Pradesh
|
FP/UP/Others/20094/2016
|
8B/UP/09/105/2016/FC
|
Jagdishpur-Haldiya pipe line and spurline project (Uttar Pradesh section)
|
Others
|
GAIL INDIA LIMITED
|
0.4828
|
IN-PRINCIPLE
|
20-Mar-2017
|
|
|
|
|
|
No
|
28
|
Uttar Pradesh
|
FP/UP/Others/20094/2016
|
8B/UP/09/105/2016/FC
|
Jagdishpur-Haldiya pipe line and spurline project (Uttar Pradesh section)
|
Others
|
GAIL INDIA LIMITED
|
0.4828
|
IN-PRINCIPLE
|
20-Mar-2017
|
|
|
|
|
|
No
|
29
|
Uttar Pradesh
|
FP/UP/Others/20094/2016
|
8B/UP/09/105/2016/FC
|
Jagdishpur-Haldiya pipe line and spurline project (Uttar Pradesh section)
|
Others
|
GAIL INDIA LIMITED
|
0.4828
|
IN-PRINCIPLE
|
20-Mar-2017
|
|
|
|
|
|
No
|
30
|
Uttar Pradesh
|
FP/UP/Others/23971/2017
|
8B/UP/09/77/2017/FC
|
GAIL (India) Limited project for laying of 24"/36" Natural gas pipeline along with 40 mm dia OFC duct/cable from Jhansi-Auraiya-Phulpur under Forest Division/Social Forestry Division namely Jhansi, Orai, Auraiya, Kanpur Dehat, Kanpur Nagar, Unnao, Raebareli, Pratapgarh & Allahabad- UP, Total 473 km & Forest Area 2.0647 Ha
|
Others
|
GAIL INDIA LIMITED
|
2.064771643
|
IN-PRINCIPLE
|
06-Jun-2018
|
|
|
|
|
|
No
|
31
|
Uttar Pradesh
|
FP/UP/Others/23971/2017
|
8B/UP/09/77/2017/FC
|
GAIL (India) Limited project for laying of 24"/36" Natural gas pipeline along with 40 mm dia OFC duct/cable from Jhansi-Auraiya-Phulpur under Forest Division/Social Forestry Division namely Jhansi, Orai, Auraiya, Kanpur Dehat, Kanpur Nagar, Unnao, Raebareli, Pratapgarh & Allahabad- UP, Total 473 km & Forest Area 2.0647 Ha
|
Others
|
GAIL INDIA LIMITED
|
2.064771643
|
IN-PRINCIPLE
|
06-Jun-2018
|
|
|
|
|
|
No
|
32
|
Uttar Pradesh
|
FP/UP/Others/23971/2017
|
8B/UP/09/77/2017/FC
|
GAIL (India) Limited project for laying of 24"/36" Natural gas pipeline along with 40 mm dia OFC duct/cable from Jhansi-Auraiya-Phulpur under Forest Division/Social Forestry Division namely Jhansi, Orai, Auraiya, Kanpur Dehat, Kanpur Nagar, Unnao, Raebareli, Pratapgarh & Allahabad- UP, Total 473 km & Forest Area 2.0647 Ha
|
Others
|
GAIL INDIA LIMITED
|
2.064771643
|
IN-PRINCIPLE
|
06-Jun-2018
|
|
|
|
|
|
No
|
33
|
Uttar Pradesh
|
FP/UP/Others/23971/2017
|
8B/UP/09/77/2017/FC
|
GAIL (India) Limited project for laying of 24"/36" Natural gas pipeline along with 40 mm dia OFC duct/cable from Jhansi-Auraiya-Phulpur under Forest Division/Social Forestry Division namely Jhansi, Orai, Auraiya, Kanpur Dehat, Kanpur Nagar, Unnao, Raebareli, Pratapgarh & Allahabad- UP, Total 473 km & Forest Area 2.0647 Ha
|
Others
|
GAIL INDIA LIMITED
|
2.064771643
|
IN-PRINCIPLE
|
06-Jun-2018
|
|
|
|
|
|
No
|
34
|
Uttar Pradesh
|
FP/UP/Others/25152/2017
|
8B/UP/09/42/2017/FC
|
M/s C&DS unit -18 UP Jal Nigam Moradabad by Proposed Amroha city water drainage from Faizeaam inter college Amroha to Baan river Along Amroha -Kanth Road (M.D.R. No. 150) km. chanaige 21.840 to 26.540 Tehsil &distric Amroha.
|
Others
|
UTTAR PRADESH JAL NIGAM
|
1.692
|
IN-PRINCIPLE
|
15-Jun-2018
|
|
|
|
|
|
No
|
35
|
Uttar Pradesh
|
FP/UP/Others/34211/2018
|
8B/UP/08/77/2018/FC
|
Protected Forest Land Proposed to be Diverted for Laying of 1100mm, 2 pipes for Estabilishment of Water Carrier System to Ghatampur Thermal Power Project along NH-86 from Ch.20.800 to 61.900 District:Kanpur Nagar
|
Others
|
NEYVELI UTTAR PRADESH POWER LIMITED
|
14.385
|
IN-PRINCIPLE
|
10-Dec-2018
|
|
|
|
|
|
No
|
36
|
Uttar Pradesh
|
FP/UP/Others/41601/2019
|
8B/UP/06/18/2020/FC
|
Proposed Forest Land for Approach Road ( entry, exit & middle part) for INDIAN OIL CORPORATION LIMITED Retail outlet on SH-84 SHIKOHABAD - BHOGAON Road CH. 51.950 (LHS), Gata No.- 1149/2 & 1150/Mi, vill.- Sansarpur, Tehsil & Distt.- Mainpuri
|
Others
|
INDIAN OIL CORPORATION LIMITED AGRA
|
0.052278
|
IN-PRINCIPLE
|
05-May-2020
|
|
|
|
|
|
No
|
37
|
Uttar Pradesh
|
FP/UP/Pipeline/152749/2022
|
8B/UP/08/246/2022/FC
|
Laying of Water Distribution Line along Mirzapur to Robertsganj Road, (LHS) and proposed Reserved forest land to be diverted in Wyndom Fall, and Madihan Range, Mirzapur Forest Division, under Danti Group of Villages Drinking Water Scheme of Jal Jeevan Mission of Govt. of India, in District:- Mirzapur
|
Pipeline
|
STATE WATER SANITATION MISSION
|
0.7694
|
IN-PRINCIPLE
|
25-Nov-2022
|
|
|
|
|
|
No
|
38
|
Uttar Pradesh
|
FP/UP/RAIL/40280/2019
|
8B/UP/07/64/2019/FC
|
Proposed Doubling of Sitapur Cant-Roza Section Protected Forest Land Proposed to be diverted from KM.0.00 to 80.300 passing through Districts Sitapur,Hardoi,Lakhimpur kheri and Shahajahanpur
|
Railway
|
NORTH RAILWAY MORADABAD
|
69.5992
|
IN-PRINCIPLE
|
14-Aug-2019
|
|
|
|
|
|
No
|
39
|
Uttar Pradesh
|
FP/UP/RAIL/40280/2019
|
8B/UP/07/64/2019/FC
|
Proposed Doubling of Sitapur Cant-Roza Section Protected Forest Land Proposed to be diverted from KM.0.00 to 80.300 passing through Districts Sitapur,Hardoi,Lakhimpur kheri and Shahajahanpur
|
Railway
|
NORTH RAILWAY MORADABAD
|
69.5992
|
IN-PRINCIPLE
|
14-Aug-2019
|
|
|
|
|
|
No
|
40
|
Uttar Pradesh
|
FP/UP/RAIL/47261/2020
|
8B/UP/07/210/2021
|
Diversion Protected/ Reserve Forest Land for Jawaharpur Thermal Power Project Malawan, Etah
|
Railway
|
JAWAHARPUR VIDYUT UTPADAN NIGAM LTD
|
4.2069
|
IN-PRINCIPLE
|
01-Dec-2021
|
|
|
|
|
|
No
|
41
|
Uttar Pradesh
|
FP/UP/ROAD/145149/2021
|
8B/UP/06/241/2021/FC
|
PROPOSED PROJECT ENVISAGE USAGE OF RESERVED FOREST LAND (UNDER FCA-1980) FOR THE CONSTRUCTION OF KOKILAVAN SHANIDHAM PARIKRIMA MAARG (CH.00.00 TO CH. 02.748) MVDA (MATHURA-VRINDRAVAN DEVELOPMENT AUTHORITY )MATHURA UNDER BRIJ TIRTH VIKAS PARISHAD. PROJECT ON KOKILAVAN -PARIKRAMA MARG IN TAH.-CHHATT DIST.MATHURA (U.P.)
|
Road
|
MVDA
|
2.0112
|
IN-PRINCIPLE
|
29-Dec-2021
|
|
|
|
|
|
No
|
42
|
Uttar Pradesh
|
FP/UP/ROAD/14525/2015
|
8B/UP/06/23/2016/FC
|
Construction of New Bridge/Approach Road over Hindon River at Balaini
|
Road
|
EXECUTIVE ENGINEER
|
1.215
|
IN-PRINCIPLE
|
28-Sep-2016
|
|
|
|
|
|
No
|
43
|
Uttar Pradesh
|
FP/UP/ROAD/150166/2021
|
8B/UP/06/37/2022/FC
|
Forest Land Proposed to be diverted for Road Widening Minibypass Tirah to Jhumka Tiraha Ch. 236.100 to 242.100 (6000m) and Drain Construction from Ch. 242.900 to 244.400 in Distt Bareilly
|
Road
|
BAREILLY DEVELOPMENT AUTHORITY
|
4.65
|
IN-PRINCIPLE
|
28-Feb-2023
|
|
|
|
|
|
No
|
44
|
Uttar Pradesh
|
FP/UP/ROAD/15564/2015
|
8B/UP/06/6/2016/FC
|
Bundelkhand Vikash Nidhi (Rajyansh)
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.3
|
IN-PRINCIPLE
|
13-May-2016
|
|
|
|
|
|
No
|
45
|
Uttar Pradesh
|
FP/UP/ROAD/24596/2017
|
8B/UP/06/13/2018/FC
|
Diversion of Protected Forest Land for Rehabilitation and Up-gradation of Road in 4-lane with paved shoulders configuration from Kalyanpur to Naviganj (Km 229.000 to Km 289.000) section of National Highway-91 in Mainpuri District in the State of Uttar Pradesh
|
Road
|
NHAI
|
97.896
|
IN-PRINCIPLE
|
20-Apr-2018
|
|
|
|
|
|
No
|
46
|
Uttar Pradesh
|
FP/UP/ROAD/24614/2017
|
8B/UP/06/60/2018
|
Forest Land Proposed to be diverted for Six Lane Road Widening from Avantibai Chauraha to Rauhata Canal Road(City Part of Agra-Gwalior Road) CH.0.00 to 6.500 in Agar District
|
Road
|
PWD AGRA
|
2.45
|
IN-PRINCIPLE
|
17-Oct-2019
|
|
|
|
|
|
No
|
47
|
Uttar Pradesh
|
FP/UP/ROAD/26962/2017
|
8B/UP/06/8/2019/FC
|
Protected Forest Land Proposedto be Diverted for 6 - Lane Widening and Strengthening of Fatehabad Road from Avanti Bai Chauraha to Agra-Bah-Kachora Ghat Road (SH-62) CH.10.000 Km to CH.11.000 Km. In Agra District
|
Road
|
PWD AGRA
|
1.4
|
IN-PRINCIPLE
|
09-Mar-2021
|
|
|
|
|
|
No
|
48
|
Uttar Pradesh
|
FP/UP/ROAD/30203/2017
|
8B/UP/06/45/2018/FC
|
Protected Forest Land proposed to be diverted for widening and strengthening City partfrom ch.0.00 to 3.250 of NH-29 Nausarh chauraha to Baghagara in Gorakhpur district
|
Road
|
CONSTRUCTION DIVISION BUILDING PWD GORAKHPUR
|
4.225
|
IN-PRINCIPLE
|
22-Jun-2018
|
|
|
|
|
|
No
|
49
|
Uttar Pradesh
|
FP/UP/ROAD/36788/2018
|
8B/UP/06/25/2019/FC
|
Diversion of Forest land for the construction of 4 lane ROB at ch. 85.500 km (Maniram) Railway line level Crossing of NH-29E stretch which is a part of jungle kudiya to mohhadipur road widening maintenance work in district Gorakhpur of Uttar Pradesh
|
Road
|
TYDCU NH PWD GORAKPUR
|
0.19384
|
IN-PRINCIPLE
|
04-Sep-2019
|
|
|
|
|
|
No
|
50
|
Uttar Pradesh
|
FP/UP/ROAD/7444/2014
|
UP/06/93/2016/FC
|
Diversion of Protected Forest Land for Rehabilitation and up-gradation to 2-lane with paved shoulders configuration from Aligarh to Moradabad Section of National Highway-93 under NHDP-IVB in the State of Uttar Pradesh (Km 85.700 to Km 232.000)
|
Road
|
NATIONAL HIGHWAY DIVISION
|
58.263
|
IN-PRINCIPLE
|
09-Mar-2017
|
|
|
|
|
|
No
|
|